# Profoundd archive — Epstein Files # Bates number: EFTA00708414 # Title: From: LAllenby # Dataset: 9 # Pages: 7 # Images: 7 detected # Tags: epstein, doj, dataset-9, image-described # Source PDF: https://profoundd.com/epstein-docs/EFTA00708414/download # Doc viewer: https://profoundd.com/epstein-docs/EFTA00708414 # # Text below is what Profoundd has extracted from the source PDF. # 'ocr-enriched' tag means OCR was applied to scan-only pages. # Image descriptions are AI-generated factual captions (llava:13b). #---------------------------------------------------------------------- === SUMMARY === From: LAllenby To: "jeffrey E." Cc: Richard Kahn Subject: Re: LSJ Plate Work Date: Mon, 03 Aug 2015 13:38:39 +0000 Good Morning Upon reviewing and inspecting the inside of the compartments, forward of the engine room, we have come up with a quotation for repairing all the "wasted" plate. Approximately 160 square feet of plate has to be cut out and replaced. The square footage equals 848LBS x $45 per pound the total would be $38,160 (This price includes all labor and mater === EXTRACTED TEXT === From: LAllenby To: "jeffrey E." Cc: Richard Kahn Subject: Re: LSJ Plate Work Date: Mon, 03 Aug 2015 13:38:39 +0000 Good Morning Upon reviewing and inspecting the inside of the compartments, forward of the engine room, we have come up with a quotation for repairing all the "wasted" plate. Approximately 160 square feet of plate has to be cut out and replaced. The square footage equals 848LBS x $45 per pound the total would be $38,160 (This price includes all labor and material). We will also have to remove both keel coolers due to their location with the plate that has to be cut out. We will also have to fabricate two new boxes in which they sit and then remount these boxes once the new plate is welded into place. The price for this is $5850 includes labor and material. Two water tight bulkheads are also compromised and several areas will need to be "cropped" out and replaced. Labor and materials is $3380. We will also "plug weld" 12 more additional areas that have deteriorated and need to be addressed. These two compartments have been inspected by both Gabriel, the project manager, and Bosco. In addition, the emergency bilge pump system needs to be renewed and it is our recommendation to have Bosco undertake this job. Please note that we have not charged any additional lay days and will continue not to. The areas that need to be cut out and replaced are very confined and difficult to work in. With the savings on lay days it is over $3500 so we will not be able to move on our final quotation. I have also attached a few pictures Total for labor and material $47,390 Leighton Allenby Director of Properties On Aug 3, 2015, at 9:21 AM, jeffrey E. wrote: that is only the problem„ is there a proposal for solution, ? please try to add action steps to issues, telling me only that there is a problem is time consumig On Mon, Aug 3, 2015 at 9:13 AM, LAllenby < > wrote: EFTA00708414 The hull is compromised - rusted through in areas on his map. Leighton Allenby Director of Properties On Aug 3, 2015, at 9:09 AM, Richard Kahn < > wrote: Bosco email off point. Disappointed with bosco on every step of this barge overhaul and concerned he is not best person to care for and operate moving forward. To many surprises and then an excuse and disclaimer each time. As I am sure you will say we have no choice I wanted to confirm we shall proceed with latest Change order for 47,390 Please advise Thank you Sent from my iPhone Begin forwarded message: From: Leighton Allenby < Date: July 31, 2015 at 3:49:39 PM EDT To: Richard Kahn Subject: Fwd: LSJ Plate Work FYI Leighton Allenby Director of Pro erties Forwarded message From: Bill Hague wrote: Good Morning Anna- Upon reviewing and inspecting the inside of the compartments, forward of the engine room, we have come up with a quotation for repairing all the "wasted" plate. Approximately 160 square feet of plate has to be cut out and replaced. The square footage equals 848LBS x $45 per pound the total would be $38,160 (This price includes all labor and material). We will also have to remove both keel coolers due to their location with the plate that has to be cut out. We will also have to fabricate two new boxes in which they sit and then remount these boxes once the new plate is welded into place. The price for this is $5850 includes labor and material. Two water tight bulkheads are also compromised and several areas will need to be "cropped" out and replaced. Labor and materials is $3380. We will also "plug weld" 12 more additional areas that have deteriorated and need to be addressed. These two compartments have been inspected by both Gabriel, the project manager, and Bosco. In addition, the emergency bilge pump system needs to be renewed and it is our recommendation to have Bosco undertake this job. Please note that we have not charged any additional lay days and will continue not to. The areas that need to be cut out and replaced are very confined and difficult to work in. With the savings on lay days it is over $3500 so we will not be able to move on our final quotation. I have also attached a few pictures Total for labor and material $47,390 EFTA00708417 kresized12.jpg> EFTA00708418 EFTA00708419 please note The information contained in this communication is confidential, may be attorney-client privileged, may constitute inside information, and is intended only for the use of the addressee. It is the property of JEE Unauthorized use, disclosure or copying of this communication or any part thereof is strictly prohibited and may be unlawful. If you have received this communication in error, please notify us immediately by return e-mail or by e-mail to jeevacation@gmail.com, and destroy this communication and all copies thereof, including all attachments. copyright -all rights reserved EFTA00708420 === IMAGE DESCRIPTIONS === [Image 1] The image is a photograph of a printed email. The email is addressed to a recipient with a name redacted, and it appears to be from a company or organization. The email contains a list of items or services provided, along with their respective costs. There are also notes about the status of certain items or services, such as "No charge" and "Paid in full." The email includes a section titled "Tota [Image 2] The image shows a scanned document, which appears to be a letter or an email. The document is addressed to a person named "Frank LaBrucherie" and is signed by "Lighthouse Legal Services." The text of the document discusses a legal matter, specifically regarding a "Western Plate" and mentions a "Lighthouse Legal Services" address. There are also references to "Lighthouse Legal Services" and "Lighth [Image 3] The image shows a scanned document, which appears to be a letter or an email. The text is partially obscured by a red rectangle, indicating that some information is being withheld. The visible text includes a salutation, a date, and a closing. The document is addressed to a person named "Bill Hagerty," and it mentions a specific date and time for a meeting. The text also refers to a "Bank of Ameri [Image 4] The image shows a scanned document, which appears to be a letter or an email. The document contains text, and there is a visible signature at the bottom. The text includes a salutation, a date, and a closing. The visible names include the sender's name and the recipient's name. The document is addressed to a person named "Steve," and it mentions a specific date, "March 29, 2010." The text discusse [Image 5] The image appears to be a photograph of a document with text. The document is a form or agreement, and it contains text that is too small to read clearly. The visible text includes phrases such as "Form of Communication," "Form of Communication," and "Form of Communication," suggesting that the document is related to communication methods or protocols. The document is printed on a piece of paper, [Image 6] The image appears to be a screenshot of a computer interface, possibly from a file explorer or a web browser. There are several files listed, each with a name and file extension. The names of the files are not fully visible due to the resolution of the image. The visible names include "document.pdf," "image.jpg," and "text.txt." The interface suggests that the user is viewing a directory or a list