# Profoundd archive — Epstein Files # Bates number: EFTA00802602 # Title: APPLICATION FORMS AND ENVIRONMENTAL ASSESSMENT # Dataset: 9 # Pages: 121 # Images: 121 detected # Tags: epstein, doj, dataset-9, image-described # Source PDF: https://profoundd.com/epstein-docs/EFTA00802602/download # Doc viewer: https://profoundd.com/epstein-docs/EFTA00802602 # # Text below is what Profoundd has extracted from the source PDF. # 'ocr-enriched' tag means OCR was applied to scan-only pages. # Image descriptions are AI-generated factual captions (llava:13b). #---------------------------------------------------------------------- === SUMMARY === APPLICATION FORMS AND ENVIRONMENTAL ASSESSMENT FOR THE CONSTRUCTION OF TWO DOCKS AND A BARGE LANDING ON GREAT ST. JAMES ISLAND U.S. VIRGIN ISLANDS PREPARED FOR GREAT ST. JIM, LLC. PREPARED BY BIOIMPACT, INC. M. BOX 132 KINGSHILL, ST. CROIX U.S. VIRGIN ISLANDS 00851 bioimpact@islands.vi JANUARY 2017 EFTA00802602 Dawn L. Henry Commissioner Department of Planning and Natural Resources Cyril E. King Airport Terminal, Second Floor St. Thomas, Virgin Islands 00802 Re: Major Water Permit Application fo === EXTRACTED TEXT === APPLICATION FORMS AND ENVIRONMENTAL ASSESSMENT FOR THE CONSTRUCTION OF TWO DOCKS AND A BARGE LANDING ON GREAT ST. JAMES ISLAND U.S. VIRGIN ISLANDS PREPARED FOR GREAT ST. JIM, LLC. PREPARED BY BIOIMPACT, INC. M. BOX 132 KINGSHILL, ST. CROIX U.S. VIRGIN ISLANDS 00851 bioimpact@islands.vi JANUARY 2017 EFTA00802602 Dawn L. Henry Commissioner Department of Planning and Natural Resources Cyril E. King Airport Terminal, Second Floor St. Thomas, Virgin Islands 00802 Re: Major Water Permit Application for the Construction of a Temporary Barge Landing, an Access Dock, and a Combination Dock and Barge Landing Dear Commissioner Henry, Great St. Jim, LLC wishes to make application to the Virgin Islands Government and the Secretary to the Army for a Coastal Zone Permit to construct two docks, one of which is a combination dock and barge landing and a temporary barge landing to provide access to Great St. James Island. A temporary barge landing is being proposed on the northwestern facing beach. This site is to the west of the sand pond and the associated wetlands. This a shoreline ramp which is 25'wide and 40' in length extends to the Mean Water Line (MWL). Two bollards will be placed to either side of the ramp and two moorings will be installed 75' offshore on either side of the ramp in just over 7' of water depth. The moorings will be installed using helix anchors and will use floating lines as to not disturb the seafloor when not in use. The landing is free of both coral and seagrass colonization, this landing can be quickly constructed and utilized while the combination dock and barge landing on the southeastern side of the island is constructed. The western dock is proposed on the northern end of Christmas Cove. Historically there was a dock in this location and there are still old concrete piles lying in the shallow water. The proposed dock will be 10' in width and 195' in length extending 187' from MLW and 193' from mean high water (MHW). The dock will connect to an access slab 12' in length and 2' thick. All the ESA listed coral species within the area were located and the dock footprint avoids all ESA listed species. The dock extends beyond the nearshore hardbottom to a depth of 15' out in the uncolonized sand to allow for safe dockage for deeper vessels. The southern dock is located off the point closest to Little St. James. Again, all the ESA corals were located and the dock was designed to avoid these corals. The dock is "L." shaped and is 20' wide (to allow for barge landing) and 150' in length extending 141' from MLW and 148' from MHW. The "L" then turns east and extends 100' by 20'. A wave attenuating/reef creating system is proposed beneath the dock which will allow for more protected docking inside the dock when seas from the south are rough. The dock has 9' of water depth off the southern end and 7' to 8' on the inside of the "L". The dock has been designed so that barges can approach and land on the end of the dock while vessels can dock along the "L.". The existing dock in Shallow Bay which is not permitted by the USACE in its current configuration will be removed upon completion of a usable new dock. It is understood that your approval of the renewal must be first obtained by virtue of the authority vested in you by Act No. 4248 of the Virgin Islands Code. Your favorable endorsement is, therefore, respectfully requested. EFTA00802603 We also respectfully request that this application be forwarded to the U.S. Army Corps of Engineers Antilles District, Annex Building, Fundacion Angel Ramos, 2nd Floor, Suite 202, Franklin Delano Roosevelt Ave. #383, San Juan, PR 00918 for their review and approval. Early advice concerning your decision in this matter will be appreciated. Very truly yours, Erika Kellerhals EFTA00802604 GOVERMENT OF THE VIRGIN ISLANDS OF THE UNITED STATES DEPARTMENT OF PLANNING AND NATURAL RESOURCES DEVELOPMENT PERMIT APPLICATION FORM L&WD-2 PERMIT APPLICATION Date Received: Date Declared Complete: Permit Application No. Application is hereby made for an ElEarth Change ElCoastal Zone Permit I. Name, mailing address, email address and telephone number of Applicant (person/entity with legal interest in the property, to which permit will be issued) awn Ea Jim LW 9053 Estate St. Thomas, Sues 101 st. Thomas, VI 00802 340 779.2584 2. Name, title, mailing address and telephone number of Owner of property and Agent (if any) Owner of Property(s) AMR Great St Jim, LLC Erika A. Kellerhals 9053 Estate SL Thomas. Suite 101 IIIII••••••••••0410la Kit Sas tea et IIINalptide St Thomas, VI 00002 St Thomas. VI 00802 340 779 2584 3. Location of activity. Plot No. ""*"."—""""a""as"'" PIN No. icreeognoice a 109801010300 EstateGreat St. James Island St Thomas 4. Zoning District I3/400"31 tow Craft 4.a State type of Land Uses as specified in the VI Zoning Law, which are applied for (e.g., restaurant, hotel, single-family dwelling, etc.) Private Doc* and Barge Ramp 5. Name, mailing address, email and telephone number of project designer. Jeffrey Bateman, PE. PLS. Bateman CM Spivey Company, PC, MSC Dosplva, LLC 5001.12 cndndsrs Wharf Christiansed. StCrobc. VI 00820 340 778-7474 6. Summary of proposed activity. Include all incidental improvements such as utilities, roads, etc. (Use additional sheets if necessary). A temporary barge landing is being proposed on the northwestern facing beach. This site Is to the west of the sand pond and the associated wetlands. This shoreline ramp which Is 2SWlde and 40' in iength extends to the Mean Water Line (MWL). Two bollards will be placed to either side of the ramp and two TOOlkl9S Will be installed 75 offshore on either side of the ramp Continued: EFTA00802605 FORM L&WD-2/PERMIT APPLICATION 7. Date activity is proposed to start go 'MA'S Pella" in ; be completed 5 moms 8. Classification of minor or major permit. Check one: ElMinor Permit Application El Major Permit Application State below which criterion applies in making above check. Size of Project! Dock Sizes 9. Application is hereby made for a permit to authorize the activities described herein. I agree to provide any additional information/data that may be necessary to provide reasonable assurance or evidence to show that the proposed project will comply with the applicable territorial water quality standards or other environmental protection standards both during construction and after the project is completed. I also agree provide entry to the project site for inspectors from the environmental protection agencies for the purpose of making inspection regarding this application and that to the best of my knowledge and belief, that such information provided herein, is true, complete and accurate. I further certify that I possess the authority to undertake the proposed activities. Signature of Applicant or Agent (if not owner) Date Sign Print Sign Owner(s) (Rquiredr --- Date ) Criltk I fin J1) 4-4 nolgo-to f I to k tr./ Print S St I,- tuatuaorfr- Coma` St. Try., u-t. Sign Print Date Inspected: FOR DEPARTMENT USE ONLY Inspector Record 0 Application Approved 0 Application Disapproved Inspector's Remarks: Inspector Date Commissioner, Planning & Natural Resources Date EFTA00802606 7. Cont. in just over 7' of water depth. The mooring will be installed using helix anchors and will use floating lines as to not disturb the seafloor when not in use. The landing is free of both coral and seagrass colonization, this landing can be quickly constructed and utilized while the combination dock and barge landing on the southeastern side of the island is constructed. The western dock is proposed on the northern end of Christmas Cove. Historically there was a dock in this location and there are still old concrete piles lying in the shallow water. The proposed dock will be 10' in width and 195' in length extending 187' from MLW and 193' from mean high water (MHW). The dock will connect to an access slab 12' in length and 2' thick. All the ESA listed coral species within the area were located and the dock footprint avoids all ESA listed species. The dock extends beyond the nearshore hardbottom to a depth of 15' out in the uncolonized sand to allow for safe dockage for deeper vessels. The southern dock is located off the point closest to Little St. James. Again, all the ESA corals were located and the dock was designed to avoid these corals. The dock is "L" shaped and is 20' wide (to allow for barge landing) and 150' in length extending 141' from MLW and 148' from MHW, the "L" then turns east and extends 100' by 20'. A wave attenuating/reef creating system is proposed beneath the dock which will allow for more protected docking inside the dock when seas from the south are rough. The dock has 9' of water depth off the southern end and 7' to 8' on the inside of the "L". The dock has been designed so that barges can approach and land on the end of the dock while vessels can dock along the "L". The existing dock in Shallow Bay which is not permitted by the USACE in its current configuration will be removed upon completion of a usable new dock. EFTA00802607 GOVERNMENT OF THE VIRGIN ISLANDS OF THE UNITED STATES DEPARTMENT OF PLANNING AND NATURAL RESOURCES DEVELOPMENT PERMIT APPLICATION FORM L&WD-3 ZONING REQUIREMENTS TABLE The following table shall be completed by the applicant with entries as appropriate for the zoning district in which the activity is taking place. Not all the requirements will necessarily apply to a particular zone. Consult the Zoning Law for guidance. Applicants Name: Great St. Jim, ILLC (Wera talc lht Date: %k1O Location of Activity (Plot No.): Estate: Greg Si. James 2. 3. 4. S. Proposed use (residential etc.) Residential Access Docks/Barge Ramp Accessory use if any Residential Access Docks/Buge Run Number of onsitc parking spaces: Existing ala Proposed •• Arca of lot: a acres covered by proposed buildings fts Area covered by existing buildings dot ft2' Area 6. Total area of disturbance (includes footprint of all buildings, structures and parking areas) Upland 1550 fts 7. Setback of building from street property line: Required dot ft. Proposed none ft. 8. Side yard setback: Required Na ft. Proposed ft. 9. Rear yard setback: Required dot ft. Proposed ft. 10. Height of building: RA ft. Stories dot II. Lot width at street line (ft.) dot 12. Area of usable open space: Ws ft. % of lot 13. Persons per acre ratio ^la 14. Floor area ratio nit IS. Number of onsite parking and loading spaces .1 16. Building setback (yards II, W-2 only) 46 Zoning District: R-I FOR DEPARTMENT USE ONLY Inspector: Date: Permit Application No. EFTA00802608 GOVERNMENT OF THE VIRGIN ISLANDS OF THE UNITED STATES DEPARTMENT OF PLANNING AND NATURAL RESOURCES DEVELOPMENT PERMIT APPLICATION FORM L&WD-4 MAJOR PROJECT SUMMARY DATA Section I. Applicant 1. Name, address and telephone number of applicant. Gnat St an. RC 9053 Estate St. Thomas, Suite 101 St. Thomas, VI 00802, 340 779-2564 2. Name, address and telephone number of owner of Property and of developer. Same Section IL Summary of Proposed Development 3. Describe the proposed development A WIN( arY bred landing a bOirg pOpaW en ma nodlweadoin ikon* bath Inas sae is to me wed of Ma sand pond aid Ilw assOcistod wetland This Morenoe ramp which is 25W de and 40' In length extends to the Mean Water Line (PAWL) Two bollards will be placed to either side of the ramp and two moorings will be irtstalled 75' offshore on either side of the ramp in just over 7' of water depth. The mooring will be installed using helix anchors and will use floating (coot.) Section III. Description of Proposed Development 4. Name of development Great St. James Access Dock Temporary Barge Ramp and Dock/Barge Ramp 5. Plot No. 6. Zoning District: R-1 Residential 7. PWD Map No. D9-2925-184 and D9-7346-T004 8. Proposed use (residential, etc. as listed in Zoning Law): Private Dock/Barge Ramp for Residential Property 9. Accessory use if any Access Dock, Temporary Barge Ramp and Dock/Barge Ramp EFTA00802609 FORM L&WD-4 MAJOR PROJECT SUMMARY DATA la Area of Law (acreage) 80.7 Elan and 26.9 acres I I. Area covered by existing buildings (sq. It) n/a 12. Area covered by proposed buildings (sq. ft.) Na 13. Floor area total n/a 14. Floor area ratio (B-I, B-2 zones only) n/a IS. Number of buildings n/a 16. Number of units total nth Person 17. Schedule of units: EfficienciesIlia x 1.5 Unit 1 bedroom Ilia x 2 2 bedroom Na x 3 3 bedroom n/a x 4 Other Total Persons Persons I8. Number of on-site parking and loading spaces n/a 19. Maximum building height (stories/ft) ^la 20. Adjoining property land use(s) Private Island no Adjoining Properties 21. Setback of building from street property line (ft.) Na 22. Side yard setback (ft.) n/a 23. Rear yard setback (ft.) n/a 24. Density (perso&acre) n/a 25. Area of usable open space (sq. ft. %of lot) nia EFTA00802610 FORM L&WD-4 MAJOR PROJECT SUMMARY DATA Section IV. Comments 26. Proposed Potable Water Supply (method & quality estimate gal/day) No Potable Water Proposed 27. Proposed Sewage Treatment (method & quality estimate gal/day) No sewage treatment proposed 28. Proposed Solid Waste Disposal (method & quality estimate lbs/day) No solid waste should be created. Any trash brought off vessels will be disposed of in existing trash receptacles on Island 29. Proposed Electrical Supply (method & demand estimate KWH for single & 3 phase) Solar fights will be utilized on the docks 30. Air Conditioning (method & demand estimate down No air conditioning is proposed. 31. Other Utilities 32. Other Section V. 33. Will the development extend onto or adjoin any beach tidelands, submerged lands or public trust lands? 1 no apple:Won is be 2 docks arel a Unwary baps_ —p MI in an beech 112 e vibe Irto subrined l.S 34. Will the development maintain, enhance or conflict with public access to the shoreline and along the coast? The docks will not conflict with public access to or along the shoreline 35. Will the development protect or provide moderate income housing opportunities? Will it displace moderate income housing? Ins prOjeC la NW no India Ca m00110)IrCOme rowing Cipaltran. 36. How will the development affect traffic on the coastal access roads? The won is on a prate island and ye not ad maul mass me Date EFTA00802611 3. Cont. lines as to not disturb the seafloor when not in use. The landing is free of both coral and seagrass colonization, this landing can be quickly constructed and utilized while the combination dock and barge landing on the southeastern side of the island is constructed. The western dock is proposed on the northern end of Christmas Cove. Historically there was a dock in this location and there are still old concrete piles lying in the shallow water. The proposed dock will be 10' in width and 195' in length extending 187' from MLW and 193' from mean high water (MHW). The dock will connect to an access slab 12' in length and 2' thick. All the ESA listed coral species within the area were located and the dock footprint avoids all ESA listed species. The dock extends beyond the nearshore hardbottom to a depth of 15' out in the uncolonized sand to allow for safe dockage for deeper vessels. The southern dock is located off the point closest to Little St. James. Again, all the ESA corals were located and the dock was designed to avoid these corals. The dock is "L" shaped and is 20' wide (to allow for barge landing) and 150' in length extending 141' from MLW and 148' from MHW, the "L" then turns east and extends 100' by 20'. A wave attenuating/reef creating system is proposed beneath the dock which will allow for more protected docking inside the dock when seas from the south are rough. The dock has 9' of water depth off the southern end and 7' to 8' on the inside of the "L". The dock has been designed so that barges can approach and land on the end of the dock while vessels can dock along the "L". The existing dock in Shallow Bay which is not permitted by the USACE in its current configuration will be removed upon completion of a usable new dock. EFTA00802612 GOVERNMENT OF THE VIRGIN ISLANDS OF THE UNITED STATES DEPARTMENT OF PLANNING AND NATURAL RESOURCES DEVELOPMENT PERMIT APPLICATION FORM L&WD-5 PROOF OF LEGAL INTEREST AFFIDAVIT I 3":"C vel e tere..tut being duly sworn depose and say that: rrrprl kat)* (or lofts Doe or tiny ApphroM) eVV)1co-k' &• now. ) U.X.— I. aariis the (check one) (I or rarity/Applies) 12 weiro.‘ Z..0..eit i &stain, RR gets tnc.1 Secretary Name slit Wcualtr 4 'ink S-4•37.6vaC ATTEST -s-ea_ Secretary Signature Q_Seal The foregoing instrument was acknowledged before me this t 0 day of rad a V-.1 2011_ by Civ-eat- fsk • 'nu L—Lt_ at 'Att.) `fosek (Num a Nansorille of Wiry) oft.,. 5LL £ t.\.-. s)..ift‘ 0/041)(192 (Mkt/ CratkeY .90tE Notary Public My Commission expires county HABIBE AVDIU NOTARY PUBLIC-STATE OF NEW YORK rieF104044444n000cuinents: Quailed In Rictimdiugtatintylener from the Bureau of Internal Revenue My Commission bras OlnityltilsIteallance letter from the Lieuteaant Governor's Office. 3 Corporations and Associations: Certificate of Good Standing or equivalent. organizational documents & Amendments (Articles, Bylaws, Operating Agreement, Declarations) EFTA00802614 (Form L&WD-8) 1:08:96 Flood Plain Determination and Permit Application To be completed by all applicants 1. Owner. Great St Jim. LLC Mailing Address: 9053 Estate St. Thomas, Suite 101,St. Thomas, VI 00802 Home Tel. N: Business Tel.340 779.2564 H: Cellular if: 2. Designer: Jeffrey Bateman Lie. 1052•E Tel. 340 778 7474 3. Plot th C1&C2 Flood Zonc Designation: YE EL e Cellularil: 340 513 4684 Estate: Great St. James Island Quarters wee & wand Wet If your flood zone designation is Zone A, AE, AO, Al.30, A99, V, VO, Ve or VI-V30 as shown on the NFIP FIRM Map. then complete this section. NFIP Flood Zone Designatio I. Type of development: I or 2 Family dwelling Mobile Home Non-Structural ❑ 3 Family or more, Apartment or Condo Structure ❑ Non- Residential Structure:M Commercial Structurep New Construction Non-Structural D Addition to Structure E] 50% Substantial Improvement of Existing Structure ❑ Description of Activity cosuomoncianA 0anOxt a TeWerf an. Lard.gGroan Mon 0cckleroP Wong 2. Base Flood Elevation at the Development Site is n1a ft. above mean sea level (msl). 3. Elevation of the First Floor, Basement or Flood proof level for proposed structure is WEI 4. Describe the Non Structural Activity i.e. septic tank, waste water treatment plants etc. (including the location and development: Ns 5. Attach a certified copy of site plan (8.5" x I I) showing Base Flood Elevation. See sample attached. KR OFFICE USE ONLY Is the property located in an identified Flood Hazard Area? ( ) YES ( ) NO NFIP Zone Designation: Forward to Flood Plain Manager: ( ) YES ( ) NO Application: APPROVED ( ) DENIED ( ) RESUBMIT ( ) Plan Reviewer Name: Signature: Date: EFTA00802615 GOVERNMENT OF THE VIRGIN ISLANDS OF THE UNITED STATES VIRGIN ISLANDS BUREAU OF INTERNAL REVENUE (DPNR FORM L&WD-6) APPLICATION FOR TAX FILING AND PAYMENT STATUS REPORT" Date: (JO The applicant identified below hereby requests a letter certifying his or her tax filing and payment status for the purpose of receiving a Coastal Zone Management Permit from the Virgin Islands Department of Planning and Natural Resources pursuant to Act 5270, amending Sections 910 (aX2) and 911 (d)(2) of the Coastal Zone Management Act (Title 12, Chapter 21, Virgin Islands Code). The applicant authorizes the Bureau of Internal Revenue to disclose any taxpayer information necessary to process this application to the Virgin Islands Department of Planning and Natural Resources, who may make such further disclosures as are necessary to carry out the requirements of the Coastal Zone Management Act, as amended. Name:Great St. Jim, LLC Business Name: Great St. Jim, LLC EIN/11N: (e " t Wel SSN: Please Indicate: BCorporation Partnership 0 Individual 5 Qtther 1-441W11-Iato t• VILauts".3 Date Busine Person R Signature: Mailing Address: Date: t Lo I 17 Type of Business: Please check forms that you use: 01120, 1065, 01 040,1:1941W. E1722V1,0noi3, 0720VI, Dother (list) en,langt- aeloc4 Position: itsiSele (Maw-6•a v-- c° Carte. Telephone Number: 34O —77Q asL4 Reply to: 6115 Estate Smith Bay, suite 225. St. Thomas VI 00802 - 340-715-I040(phone), 340-774-2672(fax) or 4008 Estate Diamond, St. Croix VI 00820 - 340-773-1040(phone), 340-773-I006(fax) ° Partnership and/or Corporations must list partners corporate officers, social security numbers and addresses on a separate sheet and attach it to this application. THIS FORM IS TO BE SUBMITTED TO VIBIR UPON COMPLETION EFTA00802616 GOVERNMENT OF THE U.S. VIRGIN ISLANDS BUREAU OF INTERNAL REVENUE 6115 EST. SMITH BAY- ST. THOMAS, VI 00802 Tel: (340) 714-9320 Fax: (340) 714-9341 GREAT ST. JIM, LLC 9053 ESTATE THOMAS SUITE 101 ST THOMAS, VI 00802-0000 Dear Taxpayer: 7/13/2016 4008 ESTATE DIAMOND - PLOT 7-B CHRISTIANSTED, VI 00820 Tel: (340) 773-1040 Fax: (340) 773-1006 Business EIN: 660848875 RE: CZM ONLY Please Submit This Letter To Your CZM Authority This is in response to your application of 6/21/2016 in which you requested a letter of clearance for a Costal Zone Management Permit pursuant to Title 12, V. I. Code, Section 910 (a) (c). Based on the information in our files, we find that you are current in the filing and payment of your tax obligation. This Certification is for Costal Zone Permit purposes only and does not absolve you of any subsequent revelation of tax obligation past or future. Sincerely, Delinquent Accounts & Returns EFTA00802617 ‘4144Es v64