Page 1 – COMPLAINT
O:\9924001\0017b klk USDC Complaint.doc MICHAEL E. FARNELL (Oregon Bar No. 922966)
E-mail: [email protected]
KRISTOPHER L. KOLTA (Oregon Bar No. 106442)
E-mail: [email protected]
PARSONS FARNELL & GREIN, LLP
1030 SW Morrison Street Portland, Oregon 97205 Telephone: 503-222-1812 Facsimile: 503-274-7979
Attorneys for Plaintiff
UNITED STATES DISTRICT COURT
DISTRICT OF OREGON
PORTLAND DIVISION
12W RPO, LLC, an Oregon limited
liability company; and GED GALLERY,
LLC, an Oregon limited liability
company,
Plaintiffs,
v.
AFFILIATED FM INSURANCE COMPANY , a Rhode Island corporation,
and STEADFAST INSURANCE
COMPANY, a Delaware corporation,
Defendants.
Case No: ____________
COMPLAINT
DEMAND FOR JURY TRIAL
PARTIES
1.
Plaintiff 12W RPO, LLC ( A12W”) was and is an Oregon limited liability company with
its principal place of business in Portland, Multnomah County, Oregon.
2.
Plaintiff GED Gallery LLC ( AGED”) was and is an Oregon limited liability company
with its principal place of business in Portland, Multnomah County, Oregon.
Case 3:17-cv-00037-HZ Document 1 Filed 01/09/17 Page 1 of 12
Page 2 – COMPLAINT
O:\9924001\0017b klk USDC Complaint.doc 3.
Defendant Affiliated FM Insurance Company ( AAFM”) was and is, upon information and
belief, an insurance company incorporated in Rhode Island with its principal place of business in Rhode Island. AFM was and is authorized to issue insurance policies in the state of Oregon.
4.
Defendant Steadfast Insurance Company (“St eadfast”) was and is, upon information and
belief, an insurance company incorporated in Delaware with its principal place of business in Illinois. Steadfast was and is authorized to issue insurance policies in the state of Oregon.
JURISDICTION AND VENUE
5.
Jurisdiction is founded on diversity of citizenship and the amount at issue. Plaintiffs are Oregon LLCs with their principal places of busin ess in Oregon. As alleged above, defendant
insurers are incorporated in and have their principal places of business in other states. The matter in controversy exceeds, exclusive of interest and costs, the sum specified by 28 U.S.C. § 1332. Every issue of law and fact is between citizens of different states.
6.
This Court has personal jurisdiction over defendants because they transacted insurance in Oregon within the meaning of the Oregon Insurance Code, ORS 731.146 et. seq ., and because
the claims giving rise to this coverage lawsuit arose out of risks for which the defendant insurers provided coverage within Oregon and, specifically, Multnomah County.
THE INSURANCE POLICIES ISSUED BY DEFENDANTS
7.
AFM issued a series of first-party property policies to 12W under which GED is also a named insured, including policy numbers PC067 and PB955 (collectively, the “AFM Policies”).
8.
Steadfast issued policy number GLO 5849447-00 to Hoffman Construction Company (“Hoffman”) under which plaintiffs are insureds pursuant to the policy’s terms and their Case 3:17-cv-00037-HZ Document 1 Filed 01/09/17 Page 2 of 12
Page 3 – COMPLAINT
O:\9924001\0017b klk USDC Complaint.doc construction contract with Hoffman, which re quired Hoffman to include 12W and GED as
insureds under its liability insurance policies. This is a Contractor Controlled Insurance Program (“CCIP”) policy, providing primary commercial general liability insurance and is referred to herein as the “CCIP Primary Policy.”
9.
Steadfast also issued policy number AEC 9141601-00 to Hoffman under which plaintiffs are insureds pursuant to the policy language and their construction contract with Hoffman. This policy provides the first layer excess coverage in the CCIP, providing follow-form excess general liability insurance, and is referred to herein as the “CCIP Excess Policy.”
COMMON ALLEGATIONS REGARDI NG DAMAGE TO THE INDIGO
10.
GED served as the developer of The Indi go @ Twelve West (“The Indigo”), a 23-floor,
mixed-use apartment and office building located in Portland, Multnomah County, Oregon.
11.
12W is the owner of The Indigo and landlord to The Indigo’s residential and commercial tenants.
12.
The Indigo’s hot and cold water plumbing systems were constructed with various
materials composed of or containing ethylen e propylene diene monomer (“EPDM”) rubber,
some or all of which are designated as “grade E” and recommended for hot water service in a potable water system (collectively “EPDM Materials”). The EPDM Materials included valves, pipe couplings, gaskets and fittings for piping systems, including, but not limited to, butterfly
valves, pipe couplings, gaskets and flanges.
13.
The EPDM Materials failed, decomposing, disintegrating, and in instances dissolving into sludge. / / / Case 3:17-cv-00037-HZ Document 1 Filed 01/09/17 Page 3 of 12
Page 4 – COMPLAINT
O:\9924001\0017b klk USDC Complaint.doc 14.
Plaintiffs’ investigation revealed that the EPDM Materials suffered an unanticipated chemical reaction with Portland’s domestic water supply. Specifically, chloramine compounds added to treat Portland’s domestic water caused the EPDM materials to, among other things, decompose, disintegrate, and/or dissolve.
15.
The disintegration and dissolution of the EPDM Materials resulted in damage to The Indigo’s potable water supply, to the domestic water plumbing systems, and to other property at The Indigo, including damage to both residential and commercial units. Damage to the building’s potable water supply obviously presented the specter of harm to building residents and visitors, as well.
16.
Under Oregon’s Residential Landlord and Tenant Act (“ORTLA”), 12W, as landlord,
had a duty to “maintain the dwelling unit in a habitable condition,” including the provision of “[p]lumbing facilities . . . maintained in good working order” and “[a] water supply. . .
[m]aintained so as to provide safe drinking water.” See ORS 90.320(b), (c)(D).
17.
Under ORTLA, 12W also had an obligation to provide essential services, specifically an obligation to protect against any “serious threat to the tenant’s health, safety or property” and to
prevent any conditions that “make[] the dwelling unit unfit for occupancy.”
18.
GED was legally obligated to ensure that The Indigo was built in a manner so as not to
cause property damage. Further, GED was legally obligated to ensure that The Indigo was built in compliance with the Uniform and International Building Code as adopted in Oregon.
/ / / Case 3:17-cv-00037-HZ Document 1 Filed 01/09/17 Page 4 of 12
Page 5 – COMPLAINT
O:\9924001\0017b klk USDC Complaint.doc 19.
To meet plaintiffs’ legal obligations and to ensure the safety of residential and
commercial tenants and visitors, 12W distributed bottled water to all tenants and promptly investigated and selected the fastest and most efficient means to repair the property damage and restore the safe functionality of The Indigo’s plumbing systems. In timely recognizing and
satisfying their legal obligations, plaintiffs minimized their exposure and mitigated their loss.
20.
Repair of the damage at The Indigo included, but was not limited to, the removal and
replacement of all EPDM Materials in The Indigo’s domestic water system and repair of all property damage associated therewith. Much of the domestic water system resides in the closed-wall spaces of The Indigo, necessitating damage to and/or destruction of certain building components. After investigating all available repa ir options, Plaintiffs’ only viable repair option
was the replacement in its entirety of The Indigo’s plumbing system.
21.
To remedy property damage at The Indigo and avoid bodily injury to persons, plaintiffs
have incurred total costs of not less than $4,826,584, without limitation comprised of the following:
a. The cost of diagnosing problems in the piping system and developing a scope of
repair for the piping system and the common elements;
b. The cost to repair damaged property; c. The total cost of a third-party construction manager to furnish architectural
services; obtain permits; act as the Owners’ representative during the repair work; and document the repair work to ensure that the work complies with, among other things, (i) all applicable industry standards, (ii) the applicable building code, (iii) all applicable laws, ordinances, rules and regulations, (iv) all applicable manufacturers’ instructions and specifications, and (v) the plans and specifications; Case 3:17-cv-00037-HZ Document 1 Filed 01/09/17 Page 5 of 12
Page 6 – COMPLAINT
O:\9924001\0017b klk USDC Complaint.doc d. Relocation and move-out expenses, and the cost to move and store the tenants’
personal belongings during the course of the repair work, and to clean unit interiors;
e. Additional cleaning costs and costs to mitigate damage; f. Lost income and extra expense associated with the repair work; g. Expenses in connection with tenants’ loss of use of property; and h. Financing and carrying costs.
In addition, 12W has incurred substantial attorney fees in connection with the property damage at The Indigo as a result of defendants’ failure to honor their respective coverage obligations. These attorney fees are independent of and in addition to the fees incurred to
enforce defendants’ coverage obligations. The full extent of plaintiffs’ damages will be proven at trial.
AFM’S POLICIES AND DENIAL OF THE EPDM CLAIM
22.
As identified above, Plaintiffs purchased a series of “All Risk” Property Insurance Policies from AFM (the “AFM Policies”).
23.
The AFM Policies contain a simple, broad insuring agreement whereby AFM promises to
cover all risks of physical loss of or damage to covered property, which includes The Indigo and all its component parts. This first party property coverage is aptly described as “All Risk Coverage” and applies unless any and all causes of the subject loss are specifically excluded. Each AFM policy has a limit of $123,510,100.
24.
The AFM Policies also provide coverage for losses of business income and extra expense
incurred as a result of covered physical loss or damage.
/ / / Case 3:17-cv-00037-HZ Document 1 Filed 01/09/17 Page 6 of 12
Page 7 – COMPLAINT
O:\9924001\0017b klk USDC Complaint.doc 25.
The AFM Policies’ exclusions do not bar coverage for the disintegration, decomposition,
or dissolution of the EPDM Materials or the resulting, consequential damage to the plumbing system as a whole.
26.
The AFM Policies’ exclusions do not bar coverage for the unanticipated chemical reaction between the EPDM Materials and the chloramine compounds added to Portland’s domestic water supply, a reaction resulting in the disintegration, decomposition, and dissolution of the EPDM Materials and causing direct physical loss of or damage to The Indigo’s plumbing
system.
27.
Plaintiffs submitted the EPDM Materials claim to AFM and requested coverage on or about June 18, 2015. On or about December 22, 2016, AFM denied the claim.
THE STEADFAST POLICIES AND STEADFAS T’S DENIAL OF THE EPDM CLAIM
28.
The Steadfast Primary CCIP Policy and Excess CCIP Policy (“the Steadfast Policies”)
provide liability coverage to plaintiffs for, in relevant part, “those sums that the insured becomes legally obligated to pay as damages because of ‘bodily injury’ or ‘property damage’ to which this insurance applies.” The Steadfast Policies provide combined limits of $27 million.
29.
“Bodily Injury” is defined as “bodily injury, sickness or disease sustained by a person, including death resulting from any of these at any time.” “Property damage” is defined as “[p]hysical injury to tangible property, includi ng all resulting loss of use of that property.”
30.
Plaintiffs tendered their claim to Steadfast on or about February 29, 2016, and requested
coverage. Steadfast has failed to pay the claim. / / / Case 3:17-cv-00037-HZ Document 1 Filed 01/09/17 Page 7 of 12
Page 8 – COMPLAINT
O:\9924001\0017b klk USDC Complaint.doc THE HYDRONIC PIPE CLAIM
31.
On or about February 17, 2016, plaintiffs separately submitted a claim involving The
Indigo’s hydronic pipe cooling system to AFM, requesting coverage.
32.
On or about May 12, 2016, and before plaintiffs could complete their investigation of the
damage to the hydronic pipe and hydronic pipe space, AFM denied coverage.
33.
Through their investigation, plaintiffs’ have since discovered that the hydronic pipe was
not protected with durable PVC sheeting but rather was encased by permeable plastic sheeting.
34.
Plaintiffs also discovered numerous punctures to the permeable plastic sheeting and
insulation encasing the hydronic pipe.
35.
The punctures in the permeable plastic sheeting allowed condensation to collect and in instances pool within the hydronic pipe space.
36.
Plaintiffs discovered the condensation before it led to permanent damage to the hydronic
pipe itself. The insulation surrounding the pipe, however, is a total loss.
37.
The cost to replace the hydronic pipe insulation, including consequential damages, is estimated at $100,000. The full extent of plaintiffs’ damages will be proven at trial.
/ / / Case 3:17-cv-00037-HZ Document 1 Filed 01/09/17 Page 8 of 12
Page 9 – COMPLAINT
O:\9924001\0017b klk USDC Complaint.doc FIRST CLAIM FOR RELIEF
(BREACH OF CONTRACT AGAINST AFM)
38.
Plaintiffs incorporate and reallege paragra phs 1 through 37 above as if fully set forth
herein.
39.
AFM charged, and was paid, substantial premiu ms in consideration for its promises of
insurance coverage.
40.
The AFM Policies are valid and enforceable contracts between AFM and plaintiffs.
41.
Plaintiffs have complied with all material terms, provisions and conditions of the AFM
Policies (including any conditions precedent), and/or such terms, provisions and conditions have
been waived or are otherwise no longer require d due to AFM’s conduct in the investigation,
adjustment, and/or handling of the claims.
42.
The AFM Policies obligate AFM to pay for all loss incurred by plaintiffs in connection with the The Indigo’s plumbing and hydronic pipe systems, together with all associated lost income and
extra expense, as alleged in paragraphs 21 and 37.
43.
AFM breached its policies by refusing or otherw ise failing to provide coverage as required
therein.
44.
As a result of this breach, plaintiffs have b een deprived of their insurance protection and
benefits due under the AFM Policies in the amounts sp ecified herein. In addition to these amounts,
plaintiffs have suffered consequential damages in the form of, among other things, attorney fees to Case 3:17-cv-00037-HZ Document 1 Filed 01/09/17 Page 9 of 12
Page 10 – COMPLAINT
O:\9924001\0017b klk USDC Complaint.doc protect their interests as against third parties, fi nancing and carrying costs and other damages to be
proven at trial.
45.
Plaintiffs are entitled to recover their attorney fees under ORS 742.061.
SECOND CLAIM FOR RELIEF
(BREACH OF CONTRACT AGAINST STEADFAST)
46.
Plaintiffs incorporate and reallege paragra phs 1 through 45 above as if fully set forth
herein.
47.
Steadfast charged, and was paid, substantial premiums in consideration for its promises
of insurance coverage.
48.
The Steadfast Policies are valid and enforceable contracts between Steadfast and
plaintiffs.
49.
Plaintiffs have complied with all material terms, provisions and conditions of the
Steadfast Policies (including any conditions pr ecedent), and/or such terms, provisions and
conditions have been waived or are otherwise no longer required due to Steadfast’s conduct in the investigation, adjustment, and/or handling of the claim.
50.
The Steadfast Policies obligate Steadfast to indemnify plaintiffs for all loss incurred in
connection with the mitigation and repair of property damage caused by the EPDM Materials and in connection with the avoidance of bodily injury caused by the EPDM Materials, as alleged in paragraph 21, less the amount of $1,024,673.99 for lost rents.
/ / / Case 3:17-cv-00037-HZ Document 1 Filed 01/09/17 Page 10 of 12
Page 11 – COMPLAINT
O:\9924001\0017b klk USDC Complaint.doc 51.
Steadfast breached its policies by refusing or otherwise failing to provide coverage as
required therein.
52.
As a result of this breach, plaintiffs have been deprived of their insurance protection and
benefits due under the Steadfast Policies in the amounts specified herein. In addition to these amounts, plaintiffs have suffered consequential damages in the form of, among other things, attorney fees to protect their interests as against third parties, financing and carrying costs and other damages to be proven at trial.
53.
Plaintiffs are entitled to recover their attorney fees under ORS 742.061.
PRAYER FOR RELIEF
WHEREFORE , plaintiffs pray for judgment as follows:
1. On Their First Claim for Relief, for an award of damages in an amount to be proven at
trial of not less than $5,726,584.
2. On Their Second Claim for Relief, for an award of damages in an amount to be proven at
trial of not less than $4,601,910.
3. On All Claims for Relief:
a. Plaintiffs’ costs and disbursements incurred herein; b. Plaintiffs’ attorney fees pursuant to ORS 742.061; c. Prejudgment interest at 9% per annum; d. Interest at the maximum legal allowable rate from the date of judgment; and
/ / / Case 3:17-cv-00037-HZ Document 1 Filed 01/09/17 Page 11 of 12
Page 12 – COMPLAINT
O:\9924001\0017b klk USDC Complaint.doc e. Any other relief the Court deems just and equitable.
DATED this 9
th day of January, 2017.
s/ Michael E. Farnell _______________
Michael E. Farnell , OSB #922996
Kristopher L. Kolta , OSB #106442
PARSONS FARNELL & GREIN, LLP Attorneys at Law 1030 SW Morrison Street Portland, Oregon 97205 Telephone: (503) 222-1812 Fax: (503) 274-7979 E-mail Address: [email protected]
E-mail Address: [email protected]
Attorneys for Plaintiffs
Case 3:17-cv-00037-HZ Document 1 Filed 01/09/17 Page 12 of 12