Blue Water Construction Bids (BWC)
Blue Water Construction Bids (BWC)
LSJ ChiIlex Window $ 54,258.75 Lead time 8 to 10 Weeks
LSJ RO Shed
BWC $ 268,509.94 10 Weeks, 10 Guys
Buck Steel $ 83,640.00 Lead time10 Weeks
HVAC TBA
LSJ Clearing Cost TBA
GSJ
GSJ Q Hut 45 $ 93,663.75 4-5 Weeks 5 Guys
GSJ Q Hut 25 $ 52,710.00 4 Weeks, 5 Guys
GSJ Clear Site TM
Doors, Electrical, HVAC TBA
GSJ SC Kitchen-Bath $ 18,361.20 2 Weeks, 2 Guys
EFTA00593873
Bluewater Construction, Inc
6501 Red Hook Plaza #201
St Thomas, VI, 00802
Name / Address
LSO, GSG
Brice Gordan Estimate
Date Est mate #
4 182017 62
Project
Chinas wall
Description Oty Rate Total
Purchase and install soros 7 x 12* 9/16" hurricane rated glass at
chillax wall. Including shipping to st thomas and delivering to
barge to LSJ. Window to be moved to chillax area by owner. (will
need a lull as window is 12009,$) 36200.00 36.200.00
Demolition of existing windows and stone wall to accomodate new
window. 2,800.00 2,800.00
Build wood jamb for window, create 27- eyes to match adjacent
wall, and trim out window stops. 4,800.00 4,800.00
Repair coral stone tile and install and add coping. (new tile provided
by owner) 1.700.00 1,700.00
Electrical work including. 1.Relocate in-wall outlet and data to
floor box. 2. Re-wire overhead existing track light 3. Cutting
floor for new conduit and floor box. 4. Install floor box and
receptacle in concrete floor. 4,875.00 4.875.00
Misc drywall repair on inside to return to new window. 1.300.00 1,300.00
Gross rettims.
e2C3' .-----
hel iS'A2.58335 2,583.75
Total 554,258.75
EFTA00593874
Bluewater Construction, Inc
6501 Red Hook Plaza A201
St Thomas, VI. 00802
Name I Address
I SaGSG
Bricc Gordan Estimate
Date Estimate #
351?.01" 56
Project
K.U. !Acta!Building
Description Qty Rate Total
Cook-roc w plc: Construct 7 Fl pia footings, Construct .aruaural
slab extension Ninny, gidlinc C re. B. Construct texas pier
ouiwnns. FORM and pour CXI(TiOr turndown slab. 64.773.75 64.773.75
Conaiac testing 1.600.00 1.609.00 Erecting of metal building, roofing, siding, rollup doors. Including
equipment needed for cortaruction. 144.800.00 144.800.00
Electrical wort pa drawings pro% idol 44.550.00 44.550.00 lb= work per drawings pronded ""ViAITDIG ON PRICING"• 0.0) 0.00 Gross rcocipts without As ac pricing
(tctititkial 4Th RocyC oket- ca\--. 12-786.19 11786.19
iTotal $268.50,.,4
EFTA00593875
BUCK STEEL Corporate Headquarters
6855 Lyons Technology Circle - Suite 18
Cocorsd Creek • FL • 33073 Tennessee MSc*
1107 Battlewood Street
Frigid's) • TN • 37069
Toll Free Tel: (866) 574-2823 • Fax: (866) 394-2865
CUSTOMER OUOT
Manse Brice Caton
Company LSJ EmplOyees LLC
Street 6100 Red Hook Quarter, fr 83
City St Thomas
State zz by 03802
Country US Vega, islands
Protect Guiding 2
Location I..creet TBD
Engineering
width GO'
Length 120'
Height 12'
Roof Pitch 1 5 12 Tel 3407758100
Fax
Email Conte Date
Valid Trough
Prolect t0 8523415
Saks Rep Bnan Buck
Page 1 of 2
City TBD Canty TBD
State ZZ Zip T8D Country US virgin Islands
Code IBC 2009 Snow Grid 0 Seismic Ss Shell Enclosed Occupancy Normal Wind Load 145 MPH Snow Root 0 Seismic SI Column Tapered Thermal Unheated Exposure C Snow Is 1.0 Ben Deluxe Formed Trim Snow Exp Sheltered Live Load 20 Snow Ct 1 0 Collateral 0.5 Frame Gale Symmetrical
Reducible Yes Snow Ca 1.0
Len Encheall Spacing 257275721V
Right Endwall Spacing 21'6/23S/25'
Front Sidewall Spacing 2174.20721'
Back Sidevrall Spacing 2174C217/21'
Primary Frame Coating Red Oxide Primer Secondary Frame Coating Red Onde Primer
Roof Panel Gauge 24 Sty* RH0C Scscw Type-Length Lay Se-1 Color Not Ste:Mei Wall Panel Gauge 24 Style 'BR Scow Type-Length Long Ule•I COlor Net Speeded
Engineering • no 1- - • with tater:mg and engin knervi3k d Dy others. Even package include' Notes :.• . . pirins wt' •01._p doors coolically crated lot caponpeon& addliertal protecbon eerie • teapot z.bety :u VFRII -T All cab 6 I DAUS toed to deur les buddma as being xi accordans wet local reckarements Total ("tended as %XXXI Iln COD amount is to be paktnhil 2 wades poor to drawn to port
Bulking Pacing
Ow Description
Ease &Akan; as per Engneenng Soecificabons
Stamped Engneered Budding Drawngs (3 Sets) included
loaded 1 Erecting Drawings (2 Sea) Imam:led 1 Lear at Callication Inciated Anchor Bat Plans inchuad 1 Al Frames FiceDippart &shares/id Secondary Members Pre-Gailvararec Included 1 Fsw 53/W Below BSW Grade inciuded 1 LEK BSIV Open to S-6 For :Nock REV/ Open to Z-4" For Block Mauded 5 Mac Suet Columns To Supper! Roof from 8elaw Fleapits 300. per h., Bracing Ai Floor Prillichare incased Mcd-2 Design 40'. 27 Framelnes *246 inducted 1 RI Tr•rn Package Including Comer Tam. Eme Trim. &damn Rake Trim Inc:Wed Die-fcened Ridge Cap Included 1 Closure Strip Package Included 1 Gutters & Downspouts Inekkled 2 Frames Opting Standard IS x ICY Rang Steel Doors Inckded Framed Opening Standard a*x4F For CUSTOMER Provided Loners Included 2 Framed °Wing Sanded S x 4'. 1AFF For CUSTOMER Provded Louver Inc:keed Personnel Dow 3070-M White Insulated Reassembled Wedlock CerUfel wr Lever Handle v4 7Meeold Inckided 2 Roil Up Wedlock Certhed Non-Insulated w/ Chart on/ Ws 10' Included 1 Roof Imulatszn 8/ R19 WW-VR v.' Starer Rol W Patch Tape inckned war Insgation 4/ R13 WIAP-VR w' Starer Roe w/ Pact Tape :nduded 1 Buktug 8 Aconsay Freight To Port Everglades Mowed 1 Export Package Inducting Extra Compnents and Special Crating Inc jycType Post and Boarn
Type Post and Beam
Type N/A
Type ■ Bracing Cable
Bracing Cable
Bracing Cable
Bream Cable Girt Bypass
Girt Bypass
Girt Bypass
an ewes,
irltsee Coc.-1- 7 Florida Tennessee
Tel ;954) 725-8883 -re (615) 549-55a9 Total Building 33.6:t9.00
webalte
www okoksteei zm
EFTA00593876
SUCK STEEL Corporate Headquarters
6855 Lyons Technology Cede • Sure 16
Coconut Creek • Ft. - 33073 Tennessee Office
1107 Bathewood Street
Franker • TN - 37069
Toll Fres Tel: (866) 574-2825 • Fax: (866) 394-2865
CUSTOMER QUOTE
Name
Company LW Ernpdyees LLC
Street. 6103 Red Hook Quarter, a 63
City St Thomas
State ZZ Zip 002.02
Country US Vrgin islands
IMPORTANT NOTES - PLEASE READ Tel 3407758103 Ch cite Date
Fax Vold Through
Ernie ncharctkal-n12tal BS23415
Salas Rap Caen Budc
Per 2 or 2
• This quote is based on ai:Oi< Steers interpretation of ptans and/or conversations with the customer. Bud( Steet is NOT responsible for any errors and/or ommrsvons
• Carefully check this quote for comdeteness and verify the accuracy of the information contained wan
• This quote is valid through . and is subject to review of pncing Revisions to quote may result in a canoe adjustments
• Erecting is NOT included in this quote, unless speoficaily listed
• Erecting estimate is based upon, but not limited to, pad being accessible for a clear 25' around entire banding_ no trees powerlines or ecluipmert which may interfere with erecting, and power supplied to deb. Erecting estimate does not take into Consideration any OSHA, Davis Bacon, special instance requirements, or limit to days and times erecting crews are permitted to work
• Accessories not provided by Buck Steel ondud'ng but not limited to windows, doors_ cupolas. ven*.. fans, lighting. stucco, masonry etc ) will not be installed by the erector unless othervnse specified
• Anchor bolts are NOT included in etas quote and are NOT provided by Buck Stet
• Concrete is NOT inducted in the quote and is NOT prcmcled by Buck Steet
• Buck Steel and/or the Betiding Engineer * NOT the "Engineer or ReCerd7 The customer/owner is responsible for any "special buding inspector- or "druarral engineer- required by the City or county for pre and pod construction inspections
• All prices are in USD
• Sales tax is NOT included in this quote
Questions about this quote?
Contact Brian Buck at (866) 574-2826 Ext.114
Florida
Tel. (954)725.6883 Tennessee Website
Tel (615) 549-5539 wren bucksteel corn
EFTA00593877
Bluewater Construction, Inc
6501 Red Hook Plaza 4201
St Thomas, VI, 00802
Name / AddreSS
ISCifGSG
Rricc Gordan Estimate
Date Estimate S
114'2017 57
Project
Q45 I lut
Description Or,' Rate Total
Q—I5 QUONSET HUT GSJ
Conant work including labor and material. I. Construct perimeter
footing. 2. Construct r structural slab. 63,375.00 63.375.00
Concrete testing 1300.00 1.500.0 Construction of Q-45 quonset hut including structare- doors.
caluking. Including staging, and lifts required. Also includes
angled grout a panel ends in footer. Mite Bracing lumber. grout cct
included.
layout for etthwork and preParipg final grade for concrete 19.500.00
4.800.00 19300.00
4.800.00 Gras Receipts 4.158.75 4,458.75 "'NOTE: So electrical drau ingsiwere prodded. This can he
provided seperately. Abu painter* to be done by owner as
specified by BrierCatt--- ---
11/410.6 kO i\cl , Ol\\ ;ik
Ginv\V‘vn.
-Say0(5 7 .k.k4Ac-
1Total S93,633.75
EFTA00593878
Bluewater Construction. Inc
6501 Red Hook Plaza 4201
St Thomas, VI, 00802
Name/Address
IS(VGSG
Brice (lord= Estimate
Date Estimate 2
4/4'2017 5S
Project
O-25 Quonset hut
Description Qty Rate
i Total
Concrete work labor and animal. Including perimeter footing and 36,400.00 36.40O00 4" structural slab.
Concrete testing
1.500.00 1.500.00 Construction of Q-25 quonset hut including structure, doors. caluking. including staging. and lifts required. Also includes angled grout = panel ends in tooter. Mix Bracing lumber, grout e‘-t included. 9200.00 9.800.00
14n out for earthwork and preparing final grade for concrete 2200.00 2.500.00 Gross Receipts
2.510.00 2,510.00 •"NOTE: no electrical drawings were provided. This can be provided seperateb. Also painting to be done by owner as specified by Brice
N\ Qd \O ktotAL A
C->‘6 (kfbi- 3g) \OLEO''.
[IV!
Total 552.710.00
EFTA00593879
📷 Images in this document (7 detected; 6 largest described)
AI-generated factual descriptions of embedded images (llava:13b). These are searchable across the corpus.
[Image 1] The image shows a document that appears to be a financial statement or report from a company named "BLADE STEEL, LLC." The document includes various sections with headings such as "Income Statement," "Balance Sheet," and "Cash Flow Statement." There are tables with numerical data, including figures for revenue, expenses, assets, liabilities, and equity. The document also contains a section titled
[Image 2] The image shows a document with text, which appears to be a letter or a form. The top left corner has a logo that reads "Buck Steel," suggesting it is a company letterhead. The document includes a date and a recipient's name, but the specific details are not clear due to the resolution of the image. The text within the document is too small to read in detail, but it seems to be a formal communicat
[Image 3] The image shows a document that appears to be a financial statement or invoice. It includes sections for "Estimate," "Invoice," and "Total." There are various lines and columns with numerical figures, indicating expenses and amounts. The document is from a company named "Motorola Communications, Inc." and includes a date and a reference number. There is a handwritten note at the bottom of the page
[Image 4] The image shows a document with a table of construction bids. The table lists various items such as "Blue Water Construction Bids" and "Water Construction Bids." It includes columns for "Item," "Lead Time," "Unit Cost," and "Total Cost." The items listed include "LSI Chillis Window," "LSI R&O Shed," "Buck Steel," "Cleaning Cost," and "Electrical." The document appears to be a formal record of cons
[Image 5] The image shows a document, which appears to be a financial statement or an invoice. It contains a table with columns for "Description," "Qty," "Unit Price," and "Total." There are entries listed under "Description," with corresponding figures in the other columns. The document is titled "Estimate" and includes a note at the bottom that says "Need to hold this for a week." The visible text include
[Image 6] The image shows a document that appears to be a construction invoice or estimate. It contains various sections such as "Estimate," "Project," "Description," "Quantity," "Unit," "Price," "Total," and "Total Amount." There are numerical figures and descriptions of materials or services provided. The document is structured with headings and columns, and it includes a date at the top right corner. The