LSJ and GSJ Schedule
LSJ and GSJ Schedule
2
3
4
5
6
7
8
9
10
11
12
13
14
15
16
17
18
19
20
21
22
23
24
2S
26
27
28
29 Ms I GSJ Protects:
North Terrace
Collect EB Bids
Site Work
Underground Electric
Wire Mesh / Rebar for Pad
Concrete Pour 200 Yards
Saw Cuts and Sealing
Sign Off work Up to Standards)
RO
RO Sea Water Intake Pumps
RO Genset Bunker
Refurbish / Extend Q Hut
Staff Cottage Refurbish / Expand
SC New Cistern / Septic Tank
SC Kitchen Cabinets
Barge Ramp
Main House Septic Tank
Back of House Area
Dumpster / Dump Area
LSJ Projects:
Create Concrete Batch Plant
Source of Agg
Source of Cement
Source of sand
Location of plant Duration Start Finish
08/06/18 08/14/18 smartsheet
Aug
08/15/18 09/03/18
09/04/18 09/07/18
09/10/18 09/11/18
09/12/18 09/12/18
09/13/18 09/17/18
09/18/18 09/18/18 Aug 5 Aug 12 Sep 2 Sep 9
Exported on August 6, 201812:38:10 PM PDT Page 1 of 18
EFTA00805000
i 6 Sep 23
Exported on August 6.2018 12:38:10 PM PDT Page 2 of 18
EFTA00805001
Task Name
30
31
32
33
34
35
36
37
38
39
40
41
42
43
44
45
46
47
48
49
50
51
52
53
54
55
56
57
58
59
60 Mix designs on file
Rebar / Wire / Angles
Main Compound
Pool Planter
Pool Shelter
Master Bedroom
Seal exterior walls
New roof
Extend terrace
Remove step
Remove and install threshold
Refinish floors
New Shower Hardware
Repair Shower (new HW) 71?
Refinish Shower Floors
Septic/Drain Issues
Library
Seal exterior walls
New Roof
Install Exterior Lighting
Replace Windows
New Door 11W
Main Kitchen
Seal exterior Walls
Resurface Cabinets
Appliances
Roof Structure Duration Start Finish Aug Sep
Jul Aug 5 Aug 12 Aug 19 Aug 26 Sep 2 Sep 9 Sep
Exported on August 6. 2018 12:38:10 PM PDT Page 3 of 18
EFTA00805002
i6 Sep 23
Exported on August 6.2018 12:38:10 PM PDT Page 4 of 18
EFTA00805003
Task Name Duration Start Finish Aug Sep
Jul Aug 5 Aug 12 Aug 19 Aug 26 Sep 2 Sep 9 Sep
61
62
63
64
65
66
67
68
69
70
71
72
73
74
75
76
77
78
79
80
81
82
83
84
85
86
87
88
89
90
91 Ellis
Toe board and Side Panels on Cabinets
Gym
Seal Exterior walls
Replace doors
Replace Windows
Bathroom Renovation
Flag Pool Cabana
Remove Coral Stone
Install Wood Floors
Demo / Construct new Shelter
Tile Roof
Pool Refurbishment
Kitchen Remodel
I Cabana 1
Seal exterior Walls
Install Thresholds
Install Doors
Enclose Outside Shower
Rough Plumbing
Fixtures
Tile
Cabinets
Countertops
Electrical
Repaint
Resurface Floors
Move in
Exported on August 6, 2018 12:38:10 PM PDT Page 5 of 18
EFTA00805004
i6 Sep 23
Exported on August 6.2018 12:38:10 PM PDT Page 6 of 18
EFTA00805005
Task Name
92
93
94
9S
96
97
98
99
100
101
102
103
104
105
106
107
108
109
110
111
112
113
114
115
116
117
118
119
120
121
122 Cabana 2
Seal exterior Walls
Install Thresholds
Install Doors
Enclose Outside Shower
Rough Plumbing
Fixtures
Tile
Tile Showers
Cabinets
Countertops
Electrical
Repaint
Resurface Floors
Move In
I Cabana 3
Seal exterior Walls
Install Thresholds
Install Doors
Enclose Outside Shower
Rough Plumbing
Fixtures
Tile
Tile Showers
Cabinets
Countertops
Electrical
Repaint
Repair Bathroom Floor Duration Start Finish Aug Sep
Jul Aug 5 Aug 12 Aug 19 Aug 26 Sep 2 Sep 9 Sep
Exported on August 6. 2018 12:38:10 PM PDT Page 7 of 18
EFTA00805006
i6 Sep 23
Exported on August 6.2018 12:38:10 PM PDT Page 8 of 18
EFTA00805007
Task Name
123
124
125
126
127
128
129
130
131
132
133
134
135
136
137
138
139
140
141
142
143
144
145
146
147
148
149
150
151
152
153 Resurface Floors
Move in
Cabana 4
Seal exterior Walls
Install Thresholds
Install Doors
Enclose Outside Shower
Rough Plumbing
Fixtures
Tile
Cabinets
Countertops
Electrical
Repaint
Resurface Floors
Move in
Chilax Room
Seal exterior walls
Install thresholds
Install Door
Seal / Abandon Poolside Door
Trey Ceiling Design / Build
New AC
Repaint
Grass Beds Main Compound
Demo / Straighten
Electrical Demo Duration Start Finish Aug Sep
Jul Aug 5 Aug 12 Aug 19 Aug 26 Sep 2 Sep 9 Sep
Exported on August 6, 2018 12:38:10 PM PDT Page 9 of 18
EFTA00805008
i6 Sep 23
Exported on August 6.2018 12:38:10 PM PDT Page 10 of 18
EFTA00805009
Task Name
154
155
156
157
158
159
160
161
162
163
164
165
166
167
168
169
170
171
172
173
174
175
176
177
178
179
180
181
182
183
184 Tiki House
Finish ceilings
Kitchen Area renovation
Flooring / Electrical / Plumbing
Larger Stone Apron Front
Lighting
Dock Shelters
Cabinets/ Countertops / Lighting
Lighting / Purchase
Decking
Small dock Shelters
Railing
Planters / Plumbing / Electric
Pour Apron
Barge Ramp
Temp Ramp
New Ramp
Deadman Piles onshore with Eye
Possible underwater excavation
Roads
Roads to be redragged
Light Excavation
Pops Garden
New Shade house?
Run new Electric Duration Start Finish Aug Sep
Jul Aug 5 Aug 12 Aug 19 Aug 26 Sep 2 Sep 9 Sep
Exported on August 6, 2018 12:38:10 PM PDT Page 11 of 18
EFTA00805010
i6 Sep 23
Exported on August 6.2018 12:38:10 PM PDT Page 12 of 18
EFTA00805011
185 Task Name Duration Start Finish Aug Sep
Jul Aug 5 Aug 12 Aug 19 Aug 26 Sep 2 Sep 9 Sep
Generator Building
186 New Doors and Hardware
187 Gen 1 Refurb
188 Gen 2 Refurb
189 Fuel Tank Vent Lines
190 Fuel Room Fire Caulking
191
192 RO Building
193 Minor Hardware replacement
194 New Door Hinges
195
196 Engineering Building
197 Demo / Construct new Building
198
199 Laundry Facility
200 Kitchen and Bath Refurb
201 ^ Laundry Remodel
202
203 Pebble Beach
204 Fishermans Hut
205 New Foundation Pad
206
207
208
209
210
211
212
213
214
215 Site work
Five Palms
New Roof
Light Site Work
New Windows
New Doors
New electric / Feader line
Nursery
Exported on August 6, 2018 12:38:10 PM PDT Page 13 of 18
EFTA00805012
: 6 Sep 23
Exported on August 6. 2018 12:38:11 PM PDT Page 14 of 18
EFTA00805013
216
217
218
219
220
221
222
223
224
225
226
227
228
229
230
231
232
233
234
23S
236
237
238
239
240
241
242
243
244
245
246 Task Name Duration Start Finish
replace wood stairs
concrete patching
painting
Staff Bathrooms / Gas Station
Doors and Hardware replace
Window Replacement
Plumbing issues
Concrete
Sewage Treatement Overflow
Equlptment
325 FL
307 E2
TL12SSD
27202
Boom Lift
Flat bed
Dump truck
Light towers
John Deer Tractor
Beach Cleaner
Marine
Nana
Nautica
Little C
Sportis
PDR
Zodiac
Mini Me 2 Aug Sep
Jul Aug 5 Aug 12 Aug 19 Aug 26 Sep 2 Sep 9 Sep
Exported on August 6. 2018 12:38:II PM PDT Page 15 of 18
EFTA00805014
i6 Sep 23
Exported on August 6. 2018 12:38:11 PM PDT Page 16 of 18
EFTA00805015
Task Name Duration Start Finish Aug Sep
Jul Aug 5 Aug 12 Aug 19 Aug 26 Sep 2 Sep 9 Sep
242 Jet Skis
Exported on August 6. 2018 12:38:11 PM PDT Page 17 of 18
EFTA00805016
i6 Sep 23
Exported on August 6. 2018 12:38:11 PM PDT Page 18 of 18
EFTA00805017
📷 Images in this document (18 detected; 6 largest described)
AI-generated factual descriptions of embedded images (llava:13b). These are searchable across the corpus.
[Image 1] The image displays a spreadsheet titled "LSJ and GSSJ Schedule." It appears to be a table with columns and rows, each row representing a different item or task on a schedule. The columns are labeled with dates, and the rows contain various tasks or events with corresponding dates. There are also columns for "Status" and "Priority," with some items marked as "In Progress" and others as "On Hold." T
[Image 2] The image shows a table with rows and columns, which appears to be a spreadsheet or a list. The table is titled "Table 1" and includes headers such as "Title," "Start," "End," and "Duration." There are also columns for "Start," "End," and "Duration," but the cells are empty, indicating that the data has not been filled in yet. The table is structured with a header row and blank rows below it, sugg
[Image 3] The image shows a table with columns and rows, which appears to be a schedule or a list of items. The table has headers at the top with the days of the week from Monday to Sunday. Each row seems to represent a different item or task, with the first column listing the item or task, the second column indicating the start time, and the third column showing the end time. The table is empty, with no vi
[Image 4] The image shows a table with columns and rows, which appears to be a spreadsheet or a list. The columns are labeled with names, and the rows contain numbers corresponding to the names. The visible names include "Ryan," "Mike," "Paul," "John," "David," "Sarah," "Emily," "Matt," "Sam," "Jessica," "Amy," "Karen," "Lisa," "Megan," "Nick," "Sara," "Tom," "Jake," "Mike," "Jessica," "Sara," "Mike," "Jess
[Image 5] The image shows a table with columns and rows, which appears to be a spreadsheet or a data table. The columns are labeled with numbers, and the rows contain text, but the content of the text is not clearly visible due to the resolution of the image. The table seems to be organized in a structured format, typical of a database or a data analysis tool. The specific details of the content are not dis
[Image 6] The image shows a table with columns and rows, which appears to be a spreadsheet or a form. The columns are labeled with various headings such as "Date," "Start," "End," "Event," "Location," and "Notes." The rows are empty, indicating that the form has not been filled out yet. There are no visible names, dates, places, or logos that can be described. The document type is a form or a spreadsheet, t