November 30th 2018
November 30th 2018
Carpentry
Sylvester Gaillard (lead)
Boniface Laudat
James Cesar
Electrical Danny Etienne
Keshaun Williams Notes
Construction New Dock Drop Off - GSJ
Construction New Shutters Cabanas - LSJ
Construction New Window (opening out) Cabana 1- LS1
Construction New Window (opening out) Cabana 1 - LSJ
Removal of Odd/Broken Hardware/Blind Brackets - MC - GSJ
All assisted each other when required
Fixed Broken Water Line Cabana 2 - LSJ
Plumbing/Pump Work Under MB - LS1
Installed Landscape Lights Outside MB - IS1
Working on Installation of Electrical Plates & Devises all Cabanas - LSJ
Plumbing/Pump Work Under MB - LSJ
Installed Landscape Lights Outside MB - LSJ
Working on Installation of Electrical Plates & Devises all Cabanas - LSJ
EngineeringSheridan E. Mee (lead) Commission Carmix Equipment
Removal/Disposal of all items beside Engineering
Dale Mark Commission Carmix Equipment
Removal/Disposal of all items beside Engineering
Heavy Machinery
Felito Joseph
Peter St Omer
Pierre Jules Assisted the Landscapers with tree placement/relocation of Irrigation Line
Assisted the Landscapers with tree placement/relocation of Irrigation Line & Transporting New Soil
Working on Road & Rocks Placement at Pool Cabana - LS1 (Rocks to be removed E Mail 11/30/18 JE)
EFTA00805026
Housekeeping13asillia M. Morales (lead)
Irrigation Cristobal Herrera
LandscapingDupson Donissaint (lead)
Liston Mercer
Gael Leatham
Kyle Steward
Nicholas Victorin
Sainsfrans Dejour
Masons Onel Pierresaint
Gusneme Dalce Housekeeping/Empty Twin Rm (preparation for painting) - GSJ
Housekeeping/Empty Twin Rm (preparation for painting) - GS)
Housekeeping/Laundry - LSJ
Housekeeping/Laundry GSJ/LSJ
Setting up Irrigation Lines to Grasses Pool Cabana Hillside - IS)
Repaired 4 inch Broken Line Outside Cabana 2 - LSJ
Prepared Large Order of Irrigation Parts
Ran Entire System checking for leaks etc. - LSJ
Constructed Stone Transition Pops Garden - LSJ
Working Pebble Beach Construction - LS)
Emptied Out/Replanted with new soil Planter Bed Top of Owners
Installation Grasses Pool Cabana Hillside - LSJ
Continued Planting at Top of Owners Drive
Emptied Out/Replanted with new soil Planter Bed Top of Owners
Continued Planting at Top of Owners Drive
Emptied Out/Replanted with new soil Planter Bed Top of Owners
3:30pm - 6:0Opm - Completed Insecticide Spraying - LS)
Removal of Old Grasses on Beach Line - LSJ
Installation Grasses Pool Cabana Hillside - LSJ
Removal of Old Grasses on Beach Line - LS)
Installation Grasses Pool Cabana Hillside - LS1
All assisted with clean up all locations
Constructed Stone Transition Pops Garden - LSJ
Working Pebble Beach Construction - LSJ
Barge Mate Drive to Relocate
Drive to Relocate
Drive to Relocate Irrigation Line
Irrigation Line
Irrigation Line
EFTA00805027
Maintenance/RD Cuthbert Paul Titre
Gerry Francis Titre
Okeam Freeman
Marine (CaptaIng
Patrick Cena
Randy Amparo Back Washing RO System - LS1
Cleaning/Servicing Pools LSJ/GSJ
Cleaning/Servicing Pools LSJ/GSJ
Cleaning Down Vehicles - end of week clean up
Assisted Housekeeping with emptying Twin Rm (preparation for painting) - GS1
Completed Mold Remediation on Ceiling, Wall etc. Twin Rm - GSJ
Crew Runs Between STT,LSJ,GSJ,SJ
Completed Inventory of Small Parts for all Vessels
Crew Runs Between STT,LSJ,GSJ,S1
Started Roping of Pillars at Tiki
Both worked on getting maintance schedule set up with Offshore Marine which starts next week
OfficeStephanie Remington Administration - LSJ
Worked on Setting Up Crew Log which will start on Monday 3rd December
PaintingHilian J. Bedminister (lead) Completed Staining Dock - GSJ
Continue Sanding Dock - LSJ
Primed/Painted Exterior Railings - MC - LSJ
Prepared & Painted Repaired Wall Blue Beach Office - ISJ
Aiad Buncome Painted Back Wall Pool Cabana after Pictures Installation - LSI
Painted Repaired Coping - MC - LSJ
Dimitri St Omer Painted Back Wall Pool Cabana after Pictures Installation - LSJ
Primed/Painted Repaired Coping - MC - LSJ
Oriole Joseph Primed Painted New Door Under Master - LSJ
Primed/Painted Exterior Railings - MC - L.S1