Sustainability and Energy Action Plan
Grants Pass · Page 54 of 183 · Adopted 2023-05-17
BUILDINGS AND ENERGY
GRANTS PASS SUSTAINABILITY AND ENERGY ACTION PLAN
BE-6-2. Convert the Retired Merlin
Landfill Brownfield Into a Solar Field
The Merlin landfill site is much larger than
theFoothill landfill site discussed above , but
theabsorptive capacity of the grid currently at
thislocation is limited. The total land area that
the City owns at this location is more than 300
acres. However, the substation at this site can
only support an amount equivalent to what
can be produced on approximately 8 -
10acres.55
Given the magnitude of solar
production capacity possible at the Merlin site,
it is worth considering building infrastructure to
increase the City’s ability to benefit from
additional solar production on this land. This
site, like the Foothill site, is required by law to
remain under City ownership, and given this
mandate, and the challenge involved in
converting brownfields into any other sort of
property, it is worthwhile for the City to invest
in a more sizeable solar field at this site ,as
discussed in Appendices XII and XIII . Additional electricity production could be used
tooffset other electricity costs involved in
utility provision or to create an additional
revenue stream for the City. Projections
including this larger installation can be found
within the FullMunicipal Energy Use
Report (Appendix II).
In order to make this possible, an
infrastructure investment to connect this
generation site to the grid will be necessary.
Additional funding resources are likely to be
available for such a project.