LSJ Pro ects Estimated Cost ES ANC
LSJ Pro ects Estimated Cost ES ANC
RO Shed $205,705.00 121,440.00
Engineering Shed ' 5327,800.00 268,180.00
RO Refurbishment $ 60,693.00 ,
t
Switch Gear Refurbishment $ 18,500.00
Tunnel Lights
Lights x 40 S 2,621.13
Labor $ 4,400.00
$ 7,021.13
Awning $ 38,130.00
Chiles Window TBA
Flashing Great Room induded In Cottage Bid
Little C Refurbishment
Paint 16,500.00
Haul Out 1,935.00
Hardware $ 200.00
t Bench Seat i S 800.00 I
Water Taxi
i Total $ 19,435.00 tity)J6k
EFTA00612596
install Variable Speed Drives Main
Distribution Pumps TBA
!
Low Level Cut Offs Main Distribution
Pumps TBA 1
Pool Filters $ 2,446.95
LSI Projects
Staff Cottage Refurbishnment
Material $ 45,000.00
Labor $ 30,000.E
Appliances S 10,534.05
Staff Cottage Furniture $ 17,965.00
Total ! $ 103,499.05
Purchase New HD Truck 52,000.00 '
Accessories TBA
651
Hell Pad $ 16,445.00
Quonset Hut A I Hut and Hell Pad 58,000.00
i
Quonset Hut 8 40,465.48 $ 54,740.00 !Both Huts no EX
I
Staff Cottage Kitchen and Appliances ' $ 8,832.95
EFTA00612597
Staff Cottage Furniture $ 7,047.96
Electrical, Plumbing and Walls i $ 3,250.00 tI I
Labor i In House
$ 15,860.91
EFTA00612598
4. SCHEDULE
The entire project described in this proposal will be completed within 3 months following
execution of a contract between the parties.
5. PRICING & PAYMENT TERMS
The project will be undertaken at a price of $9,9rn.00 for labor and materials with the
exception of the sheds. The sheds from Buck Steel will be purchased by Little St James
who will also Day for all shipoina costs from factory to iob site.
Scope Of Work I Labor Price
GENERAL REQUIREMENTS
a. General Conditions
b. Shipping, Port Fees & Handling of Buck Steel order paid by LSJ
SITE EXCAVATION & EARTHWORK
a. Earth change protection barricades/silt fencing
b. Site hand clearing and excavation
c. Site and foundation footing pads excavation
d. Backfilling and compaction
e. Subterranean termite treatment
f. Site retaining walls (two areas)
g. Extended exterior walkway along R.O building A
h. Seeding / restoration of disturbed areas
i. Trucking & disposal of spoils
NEW STORAGE BUILDING CONSTRUCTION
a. First floor fittings & foundation walls
b. Enkadrain drainage matt & bituminous coating
c. New gravel encased 4" - PVC drain pipes
d. First floor concrete bottom salb and entry landing
e. First floor exterior & interior concrete walls
f. First floor concrete column pads and columns
g. First floor concrete beams
h. Concrete roof slab
i. Concrete parapet wall w/ cap flashing
j. Single-ply membrane at parapet and roof $ 63,000
*W00 + TBD
$ 2,500
$ 1,500
$ 1,500
$ 3,500
$ 1,200
$ 40,000
$ 8,500
$ 1,800
$ 2,500
$ 23,400
4,500
$ 2,000
$ 18,750
$ 32,000
$ 7.500
$ 15,500
$ 31,000
$ 5,250
$ 2,500 Nact EC
Cg gLa
EFTA00612599
NEW STORAGE BUILDING CONSTRUCTION, cont.
k. 6" compacted earth fill topping on roof
I. Doors package complete
m. Electrical complete (fixtures, wiring, installation)
n. Mecahnical exhaust fans and louvers complete
o. Painting of first floor walls
R.O. BUILDING A
a. First floor excavation for pier footings
b. First floor spread footings and foundations
c. First floor concrete columns and piers
d. Second floor perimeter grade beams under new slab
e. Second floor building extended elevated concrete slab
f. Second floor pre-engineered building package complete
g. Second floor pre-engineered building erection complete
h. Second floor roll-up doors package complete
i. Second floor electrical complete (Fixtures, panels and installation)
j. Seconf loor mechanical (exhaust fans and louvers)
k. Second floor miscellaneous wall painting N $ 111,750 +
AN) 16° $ 7,500
$ 3,500
5 20,000
TBD
$ 1,500
$ 3,500
$ 9,000
$ 6,500
$ 8,750
$ 28,000
Purchsed by LSJ
$ 30,000
$ 15,000
9,000
TBD
$ 2,000
GENERATOR BUILDING B $ 30,400 +
a. Second floor pre-engineered building package complete P y LSJ
b. Second floor pre-engineered building erection $ 12,000
c. Second floor roll-up doors pack ete $ 12.500
d. Second floor electri p ete (Fixtures, panels and instalattion) $ 5,000
e. Seco chanical (exhaust fans and louvers) TBD
econd floor miscellaneous wall painting S 900
TOTAL OF ALL CATEGORIES OF WORK ABOVE
CONTINGENCY (15%)
GRAND TOTAL
• Payment schedule/terms are as follows:
•
EFTA00612600
Generator/Mechanical
& R.O. Buildings
Construction Proposal
March 9, 2017
Prepared for:
Great St. James & Little St. James
Red Hook Quarters. St. Thomas. VI
Contact: Brice Gordon
Prepared by:
SSVI-Expert Builders
6501 Red Hook Plaza, Ste 201
St. Thomas VI 00802
(340) 776-4000
Contact: Alex [email protected]
EFTA00612601
1. INTRODUCTION
2. ABOUT SSVI
3. SCOPE OF WORK
4. SCHEDULE
5. PRICING & PAYMENT TERMS
6. GENERAL TERMS & CONDITIONS
7. ASSUMPTIONS
SSVI is pleased to submit this construction proposal to LSJ do Brice Gordon to be performed at
the property located at Little St. James,USVI.
By the signature of SSVI's authorized representative set forth below, SSVI agrees to be bound
by the representations made herein.
This construction proposal and the pricing provided herein shall remain valid for a period
of 60 days following the date shown on page 1.
1. INTRODUCTION
Little St. James desires to have the existing Generator/Mechanical & R.O buildings removed
and replaced with new structures and has provided a general specification and has
communicated a set of requirements, which are summarized as follows:
• Site Excavation & Earthwork
• New Storage Building Construction
• R.O Building (A)
• Generator Building (B)
SSVI / Expert is confident that it will present the best value forLittle St James. First, our past
performance record to meet schedules and deliver a high-quality product, at a relatively low
cost as compared with the competition. Second, our extensive expertise in this area allows
us to tackle tough projects on a fixed-price basis, thereby alleviating any concern that the
price may increase. Third, the talent level of our team is unparalleled and our project
management practices ensure labor efficiencies that drive costs down. Finally, our access
to the highest quality materials at highly competitive prices ensures the lowest possible cost
of goods.
EFTA00612602
2. ABOUT SSVI
SSVI is an established and well-respected local contractor that has been serving customers
in The Virgin Islands since 2009. SSVI has completed a broad range of construction projects
over the years, and many of them have been of comparable scope and magnitude as
compared with this construction project.
SSVI is supported by an extraordinary team of professionals who are highly skilled in their
trade. For this project, the team will be lead by Reynolds Clement. Reynolds Clement has a
proven track record of successfully leading projects such as this.
3. SCOPE OF WORK
SSVI will perform all construction activities associated withthe new buildings on Little St
James. Such work will be carried out in accordance with requirements communicated to
SSVI by Little St James in this proposal and the architectural plans provided by the
Jaredian Design Group. In addition to the responsibilities of SSVI outlined in such document,
SSVI will be responsible for the following:
• Site Excavation & Earthwork
• New Storage Building Construction
• Construction of the R.O Building and the Generator
Building
• Site Cleanup
EFTA00612603
📷 Images in this document (8 detected; 6 largest described)
AI-generated factual descriptions of embedded images (llava:13b). These are searchable across the corpus.
[Image 1] The image shows a document with text, which appears to be a list or a table with columns and rows. The text is too small to read clearly, but it seems to be a structured document with headings and possibly numerical data or codes. The document is not a photograph but rather a scan or a photograph of a printed document. There are no visible names, dates, places, or logos that can be discerned from
[Image 2] The image shows a document with text, which appears to be a letter or a report. The text is partially obscured by a watermark that reads "Confidential." The visible text includes a header, a date, and a footer, but the content of the document is not fully legible due to the watermark. The document is printed on standard letter-sized paper. The footer includes a page number and a date, but the spec
[Image 3] The image shows a document with text and graphics. The document appears to be a certificate or award, as indicated by the text and the design elements. The text includes a title, a date, and a recipient's name. There is also a logo or emblem at the bottom of the document, which seems to be related to a sports team or organization. The document is a scan, and the text is legible, but the specific d
[Image 4] The image appears to be a document scan, specifically a form or a list with various fields filled out. The visible fields include numbers, names, dates, and possibly some text that is not fully legible due to the resolution and angle of the scan. The document is structured with columns and rows, and there are handwritten notes and corrections on the form. The visible text includes names, dates, an
[Image 5] The image shows a document with a table of figures. The table appears to be a financial summary with columns for "Item," "Amount," and "Total." There are numbers listed under each column, indicating financial transactions or figures. The document is a scan, and there are no visible names, dates, places, or logos that can be discerned from the image provided. The handwriting is not clear enough to
[Image 6] The image appears to be a photograph of a document with text. The document is partially obscured by a pattern that distorts the text, making it difficult to read. The visible text includes phrases such as "REPORT," "RESPONSIBILITY," and "RESPONSIBILITY." There are no names, dates, places, or logos that are clearly visible due to the distortion. The document type is not clearly identifiable due to