Work Order:
Work Order:
5C521661 AC: 5173 STM: Charles Thomas SCC: Julian Brown Squawks: Ni
Yellow = Newly Added Items, Green = Changed Items (Ready for inspection or completed) from prevtous day (or since Friday on Mondays)
Assoc Status Discrepancy Resoludon
1
1.I Wdttng
aCnrOvat
(1.)
1.2 In
Progress
1.2.1 Competed
1.2.2 Open
1.3 Waiting
a.)0(04
1.4 Completed
1.4.1 Completed
1.4.2 ComMeted
1.5 Waiting
alnrowd
0.1
1.6 Completed
1.2 Completed
Id Completed
1.9 Completed
1.10 Completed
1.11 Completed
1.12 Completed
1.13 Completed
1.14 Completed airfnmeGuirstreeas GSSO
Comp led xlth IntounOPYcglmInacy Inspection as per RSQCT 57 rev 24
Complied with creflight impectlon as outlined in RSQCT-113 Rev. 23
Complied with Detrid drecklaL
Part 91.409 f(3). N3 Other special documentation requests.
Provided bed dearence per SOP 1028, all teals eanunted for
Covered and NOteded as required
Told serviced JAY( the ground herding and servicing hardback 14-00-00
Complete with interior inbotrel InSfiedianGA 3564 (CG) 5/17 and oleo
Compiled ulM Sample MydraiAlt Flutlf
Secured by customer soon arrival
Complied with Service Team Manager Chectist
Informaoon Cy*.
Compiled xiith SIN/Quality reviewof work order and logbook entry PIN to depantre
TOMO as required
N/A no hatmat to be loaded.
FOr bl1Yg purposes tined. Return To Service
IntoundfOutbaurd Impectnn
IntOunerellminary IFISDOCti3n
Outbound InspecUon
Preflight Inspection
CoraPh with Detrid Oncklat
ArriyaVDebref 90 Day De List Revell ACCCOWielle
List C9eratoes Matt Tress Relultements &Special
Documentadon RequeStS
Tool Clearance
Cover & Protect
Service Channel Toilet/0ton Galley
AfrIvaVDeParttre ASSISI & MOO Nroart
SamPie Mircratglt Fluids
Remote Valuables & Scare.
Comply with Service Team Manager Check1st
Molds Used (011s/9ttdr0) • (Materials Or4)
SIM / Quality review 01 week Order and ite/bOOk con plot
to departure
Towing (Dees not include Hangar Mores)
1.15 Completed Hazinat - Identey & provide a manifest, and a SriggerS
Declaration for Dangerous Goods for all hazardous materials
that are loaded aboard any airaaR.
FAR Pin 121 Of 135 Operators x111 proud° a hazardous
material noting= letter reputed by FAR 135.505 (e) pax
to mantereree at Ohs Repair Station tax FAR 145.206 (a)
(b).
If there b to be loading of hazardous matelots e shall be
complied with by llama trained autheized GAC personnel
orgy.
1.16 Waltin9
adarowd
(L)
1.16.1 Open
1.17 Completed Moan Donn)
CLEM1NG LAMING GEAR Fit PAINT
Consumades & Shop Staple'
1.18 Waiting
approval
0.1 Major Alteratnns regulatory comp/ once requirements to be
completed by initaler ea notated on FM Pam 8100-9.
Copy and paste from attached statements as needed and
eat as moulted.
COMPLY WITH REQUIREMENTS OF FAR 25.1301 (a) (0).
25.1353(a) and 25.1431(c) (d).
COMPUED WITH THE REQUIREMENTS OF FAR 251301(a)
(b). 25.1353(a) and 25.1431(0 (d). via GROAD TEST
REPORT-REPORT Ho. CE)0(x)O3Ca REV. X, ( IN SUPPORT
CS STC =Mean ) and GR4R216.4 REPAIR STATION
INTERFERENCE TESTING REQUIREMENTS P057 MAJOR
ALTERATIONS COMPUANCE FORM.
COMPLY WITH REQUIREMENTS OF FAR 25.1529,
INSTRUCTIONS FOR CONTINUED AIRWORTHINESS
REF X)COCK MANUAL, P/N X)0(x)03( REV. X, FOR
INSTRUCTIONS FOR CONTINUED AIRWORTHINESS AND
BLOOM 8 CC FM FORM 337, DATED nifix)UXXXX
COMPLY WITH THE WIRE ROUTING REQUIREMENTSOF
FM POLICY MM-01-04 AND FAR 25.1353 (8)
COMPLIED WITH THE WIRE ROUTING REQUIREMENTS OF
FM POLICY MM-01-04 AND FM 25.1353 (13) By
ENSURING ROUTING WAS IN ACCORDANCE AC43.13-11,
CHANGE 1 CHAPTER 11, SECTION 8.
1.19
1.20 Vann)
aPPrOwil
(1)
Waiting
aPPrOyal Update WCi a Balance
Catena Pant and Were & Stan Requirements.
LI 15,2017 6.21.0S AM Gulfstream Proprietary Information Nrc I of 2"0
EFTA00796534
Work Order:
5C521661 AC: 5173 STM: Chart Thomas SCC: Julian Brown Squawks: All
Yellow = Newly Added Items Green = Changed Items (Ready for inspection or completed) from previous day (or since Friday on Mondays)
Assoc Stalin
1.21
1.22
123 (L)
Waiting
approval
(L)
Completed
Completed
1.29 Completed
1.25 In
Progress
1.25.1 Completed
1.25.2 Completed
1.25.3 Open
1.25.4
1.26 Open
Waiting
Moroni
0.)
1.27 Waiting
Wowed
(L)
2 OMNI elt70071001-11
2.1 Discrepant/
Reyes scope or aircraft caterer pant touthspftepars, and
Son replxements reviling in paint reapplication, dd
determine arieCt on weir and batriCe.
For surfaces where paint is stripped and reapplied or added
on top of existng pant on Si area greater than 36 square
feet tne thickness values will be documented before and
after painting . If average thickness values remain the
'erne, sestet and balm review S not required.
For surfaces painted wed an area greater than 36 square
feet and before and alter pant tricnwss average vanes. QC
review for pantile weight end blame revision will be
reettred.
• Tholosess wit be plotted on an aircraft droning derived
from AMM chapter 6 or Weer sutable netch, attached to
the work order and meastrements taken on a two glare
foot grid.
• Reference CAMPS 9000, paragraph 3.5.1 for paint
restriclions to right control surfaces and RYSM certified
aircraft
• Reference CAMPS 9000, teal average thidness shall not
(Steed 6 mils.
• Per GAC Mass Propene= Engineering, pant thickness of 5
rids equSs .055 pounds per squre foot.
Vane QC revs% night charge is greater than 2
pounds or .05% of MAC, the weight and balance report wig
repute reoamwtaton.
Aircraft Ready Co. Rotten to Service. Al reCured
inspections, to include preflign espectins, maintenance
tasks, 'secrets:anal & Ionchecks, related dowmenabco,
and clearing activitiescomplete.
Contact Return to Service group when Oh swank is
complied with.
Advise customer of °reser...Won requirements per ATA
Chapter 10 of the releant maintenance manuals rot
• Engines, and MU; renew requirements en
relation to schedled Date Pronned and later ',dental Date
Completed; and perform maintenance 0, cresovaten
actions as directed by the CuStOmer and documented at a
Work Order Squeak.
Pre-Compliance cabn refurbishment inspecbco
NOTE: SEE APPENDIX
CMP GSSO O1OO1O-Service Cater Maintenance Indexton
Cheddig
Comply with Het Cockpe and Ha Cabin
Comply with intern Hot Codmit LAW RSQCT-26S flat-I
Coney with intoinO Hot Caton JAW RSQCT•219 Rawl
Comply with osaound Not Cockpit LAW RSQCT•265 Rev.'
Comply with ciAtcund Mot Cain LAW RSQCT-219 Rev-2
Removed aircraft laptop and bag and sensed in Seen
94ansons office.
Sales Conceseco
2.1.1
2.2 Completed
Completed
Completed Remove LH engne nose covA and replace with Rots Royce
Padded ex hange snit Reference RR Newstbish:
liF201302.
Removed Lill Erg. toner inlet cowl PN:O9O2O31-O19
SN:GVSP159 and Installed customs.' 'waned Inlet cowl PH:
0400001-019 5th: GV5P134SV per OSP 711002 Item 11.1.
Reference Removal and Installation book page IC.
CMP GSSO 893131 Alert SO 8127D3-73-A912O383R1
Replamment of NOnCOnlOmling Parts of the HC Re%x
AS9eMtly
Labor
Oily
$1,652
Matenals. it Charge (Rolls-Royce Warranty) (AI
•perators)
The Intent of this Mon•ModificatIon Service SWOP, Is to
replace EC-C firebox assembles that have an inglficient
thickness of the rittroescent part
Effecbvity: Reference Rolls.Rcsee Semite Etuletin 80.700-73-
A900083 for effectMty
Notes: ResOkiliOn
Advised customer of °ogre and PA) preservation requirements.
Complied with Pre-Compliance cabin nkstishment Section per 14 CM part 25.
Complied with CMP GSSO O1OO1O-San= Center Maintenance India:ton Cheddist
Complied with inbound Hot Cockpit LAW RSQCT-265 flat-I
Complied with Intent Not Cabin JAW PSZCf.219 PAN-2
Summary: Retraced Lill Eng. loaner into cowl PN:O4CO3O1-O19 SN:GVSPIS9 and instated Rot Royce provided
exchange inet cowl PH: 0401031-019 511: GV5P1345V per CW 711002.
See steps below fa detailed work palormed.
COMPLIED woe CMP GS5O 880131 Alert 58 W00-734500383R1 Replacement of Non-Conkemng Pats of the EEC
Firetp3x Assembly.
Not Appinstle due to engine Sin: effectMly
Engem Sint: 15998 wth corfnutation standard 7100111 engumed On data plate.
12113,2017 6:21:O5AM Gut/stream Proprietary Information Pace ;a 2.9
EFTA00796535
5.1 Work Order:
5C521661 AC: 5173 STM: Chart Thomas SCC: Julian Brown Squawks: Au
Yellow = Newly Added Items Green = Changed Items (Ready for inspection or completed) from previous day (or since Friday on Mondays)
Assoc Stalsas
2.3
hi3.1
3.1.1
3.2
3.3 Completed
Cemented
Completed
Canalised
Competed
3.3.1 Convicted
3.3.2 Convicted
3.3.3 Competed
3.3.4 Competed
3.4 Competed Discrepancy
Pans are savaged arid procured thrash ken Royce.
Reese place your or with Relts-Rote Spares sin (6)
months m advance and preekle 'MO need date SO OX'y Can
endure parts aroilaff my.
CapzeatcCem Detentes: Carstrern viii Frerace Rao.
Royce CaparateCare for the rheas abate en the
CusternerS behalf. Determination wnat is of is not
covered under the maintenance program will be detenratO
by Raleff ace. My charge, net conered b, the
CorporoteCare pagan mil be the Custemsoz raperoibilty
and %Mast to Gulfs-Cream's standard Terms and Conditons
with regard to payment. Sutirresseon dl the mote 6
Fecicated on the CorparateCare maintenance program
tang in (Dice at the Ome a service.
"'CANCEL"' 04P G550 880466 Alert 58 EIR700.73
A101981R3 - Introduce= of a New EEC Firebox Asscrady
nab a Revised Pant System. Resolution
Cannot compete with at this time due to Darts avalabley. $6 emplane due by 31 /AN 2021 (38 rnos remaining).
Customer Ssanatuie: Date:
ENGINE 8R700-710C4-11
Rai-me NI crane ncee cent and replace with Rots Rate
Panda/ exchange alt. Reference RR Newsflast
NF2013.02.
Removed NH Eng. Ironer inlet awl MV:0K0001-020
SN:GV5P171 and InetalleO cuRorror offered Inlet cowl PN:
040:031420 SN: 6139 per CMP 711002 Item I I.2
CMP MO 893131 Men SB BR703-73-A907383R1 -
nepiaonnent of NanConromM9 Parts of the EEC Pae%x
Assembly
Labor
61,652
MatenalS ism Charge (RolisitOyce Warta*) (Ail
Operates)
The intent of this Non-Modification Service BuTetin is to
replete One EEC firebox assembles that have an nuttoent
thickness or the evanescent pert
Effecbvity: Reference Rolls.Roroe Service &ikon 80.700-73-
/ROCOCO far effectivity
Notes:
Parts are SCheckPol and procured thrown, ROBROW:e.
Pease place your order with Rob-Royce Spares six (6)
months in advance arty provide yea need date so they an
ensure parts avaladlty.
CapOrateCare Customers affstrearn vin invoice Rolls-
Royce ComordeCrre for the cherges above on the
Gust:Nods behalf. Determination what is or is not
covered or
the maintenance ortgram will be detamnol
by Rale-Royce. My dorms not covered by the
CorpaateCare pagan nil be the Custard:es Deem:relay
and Subject toGuttman standard Terms an conoloons
rah regard to percent. Suldrnssien of the riveKe is
preocated co the CorporateCare maintenance pager
being in force at the lime of
stake.
CannbalizeY•• duct P/N 0480402-005 from NC 5173 la NC
671, Ref: W.O. 50521837. 49.3.1
Removed to cannibalize 1- duct P/N 04F0402.035 sin
/0459801. from NC 5173 for irate/label onto A/C 671 per
RR ER710 BAH 36-1145 Rev. May 15/16
Install provizeusly rowed cannibalized duct P/N
04804024006 from NC 5173 for NC 671, itecieved el to
install and installed pa ;REHM 36-11-45 Rev. May 15/16
Removed tannlinaleal`b duct P/N 0480402-035, S/N
704598CR from NC 671 and rotated into onnianal location
on NC 5173 RH engine per RREMM 36-1145 Rev. May
15/16
TWA 558135, Due- 6/18
Leak deed required.
Complied with leak check of Y- Ott P/N 0486932-005 on
R/II engine with no leas detected per 6550 MM 36-11-6
August 31/03.
"'CANCEL"' CMP 4550 890466 Meet 58 ER700.73•
A101981P3 - Irooducten of a New EEC Firebox Assembly
with a Revised Pant System.
APU RE220
Tochnkal Bulletins (ASC, CB, SB, AD, ACB)
"•CAUCEL• • 'CsIc Cs550 9/1162 ASC 1168 Nose Landing
Gear (MS) Karnes • InstalLtecn COMMete0 Summery: Removed Rill Eng. boner inlet men fr4:040001-020 SN:GVSP171 and installed Rolls Royce provided
exchange Viet cowl PH: 04C0031-020 SN: G139 Der 04P 711002.
See steps below for detailed work portent&
COMPLIED WITH CMP e3550 890131 Net 58 BR700-734.900083R1 - Replacement of Nan-Confirmiog Pens of the EEC
F9.103x Astra:17
Nat Applicable due to engine 5./N: effectivity
Engine S/N: 15449 oath ccroguratico standard 7100i-11 engraved on data plate.
strnmann
Removed to cannibalize duct P/N 04F0402•CCG 045513CR, from NC 5173 for installation onto NC 671 Der RR
Eft710 EMM 36-1145 Rev. May 15/16. Removed embalmed V- ea P/N 04F0402-005, Sill )04598CA from A/C 671
and installed kilo aigianal location an NC 5173 FUH engine per RREMM 36-11-45 Rev. May 15/16
1WIr 558135, Due- 6/18. See Stet below.
See Item 3.3.3 for reinstallation
Cannot convey with at this time due to Darts avalabley. 56 a:sentence due by 31 /AN 2021 (38 mad remaining).
Cogent, Signature: Date:
Customer elects ro alien at this bme.
Customs
Signature' Date:
ivisnoi7 6: i es Am Gulfstream Proprietary Information Pat I of1.9
EFTA00796536
Work Order:
5C521661 AC: 5173 ST/4: Charles Thomas SCC: Julian Brown Squawks: All
Yellow = Newly Added Items, Green = Changed Items (Ready for inspection or completed) from previous day (or since Friday on Mondays)
Assoc Status
6 /Monks
6.1 Completed Customer request to comp/y nth Registration change to Ref Rein 20.1 fa no* performed
112121E.
Notes: Need 05< update for restrawn3 transponder etc.
Pete Rawsen has ordered the wife Sri.
6.2 Watbng Customer request custom &midst be 'staled on DU.
aooroval
(l) Pease hold watt receipt ol Me custom ACL.
6.3 Completed Plight GLadarce Panel backichong does not Muir/rote for Sinewy:
nicht 00s.
Confirm NW Carved Item Discrepancy Resolution
6.3.1 Completed Removed night gullance panel (on: 7021852.901 sn:
%030509) and replaced WM repaired Pr guidance panel
(pn: 7021852401 en: 08080720) with no defects noted. NI
work dad per GSSO CMP 221001. Ref tern 11.8 for CMP
RIM. Renewed flight pub:lance panel (on: 7021852.901 sn: 06030509) and replaced wen repaired flight pub:lance Panel (on:
7021852.901 sn: 080130720) and performed Autopla operatenal deck with no defects noted. Ahnork done ref CMP
G550 221002 item 11.10 and GSSO CMP 22100 kern 11.8. See steps baby/ fa work performed.
6.3.2 Completed Performed Auteibt operational ONNk with nodefects
noted. Al work done ref CMP G550 221002 item 11.10.
6.4 Completed DU 24 mop. Swapped with DU 23 and problem (phoned. Removed defative DU and repliced nth notified DU (p.: 7028140-905 sn: 09125363) aid performed operation:1
deck with no defects noted. All work done Per 6550 CND 316024 and CMP 316030. Rel Items 11.7 and 11.9.
6.5 In Custard request to update ROAS settings.
Progress
6.5.1 Completed Created one Settings and Riggrhas Der GER 5767
6.6 WAIN Customer requests to update the anhow 4000 aircraft
zoomed photo wth the new blue paint sdierre and to add the
(L) company logo. Logo to be worded by the Catania.
Ref tern 20 1.16
7 Interior
7.1 Completed •••CANCEL•• 'Customer request to remove and replace or- Customs elects no action at this brae.
SOW NW. YAM customer Selected
Nees:
Demon has samples for customer Customer
Signature: Date:
7.2 WAN Fwd oxket door hande loose and Orals door operation.
aooroval
(L)
7.3 'Hsiang Lent hande for on pressure S scotching varier on as
approval treSSure 000r (C8528041000)
(L)
Nathaniel
8.1 Completed "'VOID—Customer request to replace nose and man Otoicate Entry. REF ITEM 25.1 FOR TIRE REPLACEMENT
des
8.2 Completed Replace Lil & RH Engem Cows ( to be supplied by Rots- Ref dens 2.1 & 3.1 foe wok performed
Royce).
Notes:
Comorate Care item
8.3 In Customer request full dewing arid operatimal checks of the
Progress Lavatory tank end sistan.
8.3.1 Completed Removed, cleaned, nspecte0, and reinstalled tftradOok
sensors P61:7700395-001 LM SN:07.G-170]. and R/H 511:07-
G-167 per CMP 380015/383024, and CMP 38(031/380032.
Ref. Warns. 11.44,11.45,11.46,11.98.
8.4 Completed Customer request to irooect all exterior sense° door latches Sunny: Installed New latch P/N 145000-2•102-142 per BP 1159851110 Rev G to the external MED switch seroce
for seryirstality end replace one discrepant latch en the door. Completed inspection of di sense door Latches per G550 MM 53-00-00 )une 15/16 and found no father
external MED snatch prvire door diserepanes. (See steps below for a detail of work performed)
8.4.1 Completed Remtreed discrepant latch On the eternal MED switch
Senkerlar Per ED 1159651110 Rev G.
8.4.2 Completed Installed New latch P/N 16000-2-102-142 per OP
1159851110 Rev G to the eternal MED swath service doer.
Competed inspecdonol al exterior seroce door latches per
6550 MM 530000 Acne 15/16 and 6550 MM 5240.00
October 30/06 irking no further discrepsioes.
8.4.3 Completed Request paint onexternal MED switch Nate door die to The aircraft is getting fill Trap/paint (ref kern 13.1). The MED service {low latch wil be painted at this time.
new latch Installation
8.5 Open Customer request to Cheek water system IndtatROS
8.5.1 Completed Complied with potable water tank soNix per G550 AlO4
38-1401 March 31/17. No indication on external pond
noted throughout entire service.
8.6 Completed CMP G550 275019 Flap Actuator Travel Nut (Left) - COMPLIED WITH CMP G550 275019 Flap Actuator Travel Not (Left) - Lubrisabco
Lubrication
8.7 Completed 04P G550275020 Rio Actuator Travel Nut (Right)- COMPLIED WITH CMP G550275020 Flap Actuator Travel NUt (Right) • tteaca0on
Lubrication
8.8 Completed •••V011)•••CMP 6550 274202 Ilarnotal Stabnzer Vod - Cupleate of item 23.11.
Actuator - Lubication
8.9 Completed 04P 6550 491005 PAl Embus:0 FS 767 • P5 797. Zonal COMPLIED WITH CMP G550 491005 APIA Enclosure FS 767 FS 797: Zonal InSPeCtian
Inspection
8.10 Waibng Customer requests 12 spare aircraft keys.
12.15.2017 6 :lid AN Gel/stream Proprietary Information Nrc 4N:9
EFTA00796537
Work Order:
SC521661 AC: 5173 STM: Charles Thomas SCC: Julian Brown Squawks: All
Yellow = Newly Added Items, Green = Changed Items (Ready for inspection or completed) from previous day (or since Friday on Mondays)
Assoc Status .
approval
(L)
811 Completed
8.12 Completed
8.12.1 Completed
8.12.2 COMOleted
8.12.3 Completed
8.12.4 Completed
8.12.5 Completed
832.6 Completed
8.13 Waiting
approval
0.)
8.13.1 [Depleted
8.14 Completed
8.14.1 [Depleted
8.14.1.1 Completed
8.15 Completed
8.16 Completed
8.17 Completed
8.18 Completed
8.18.1 Completed
8.18.2 Completed
8.19 Waiting
approval
(L)
8.19.1 Completed
8.20 Completed Discrepancy
Addeddorbo debrief
Blue R FUEL RETURN FAIL' CAS message appeared one
rair Into Might. Crew also noted Mat the rut NI
temperature was 100 degrees odour and the left al
temperature was 80 degrees atm,.
Added during debrief
Apu enclosure ha sward corroded fasteners basted as
errJostre base loser amen panels
Foetid Wile On:tying AIM CMP491005 • 8.9
Removed MU assembly for access to loner erdame
pleb. Ref. G550 AMM 49-00-00 Rev. 2/15/15
Removed FWD base lower panel 31282F and MT base
lower panel 312AZF. Removed corroded hardware and
began cleaning pat per Drarang 1159851419 Rev. L.
finished demng FAD base kw panel 31283 and AFT
base lower panel 312AZF Crewing 1159851419 Rev. L.
Installed new hardware on FWD base lower panel 3128/F
and AFT base loner panel 312A2F per Drawrg 1159851419
Rev. L
Installed MU assembly FN WE3800700-1 SN - P-500 per
G550 ANN 4900-00 Rev. 2/15/15.
Tess 567921 due 09/18 and 562027 due 06/18
Leak the* required on MU per 6550 MOM 494340 Feb
15/15.
Complied welt leak died of AA) per G550 ASIM 49420-00
Feb 15/15. Received OK to dose APU panels and completed
final closure.
FWD bullet faring (knee panel) ha evidence of erase" at
fwd edge around fwd lolling contra and a puncbse Side
of faring. Areas marked with blue grease pencil
Ref. Item 15.1
removed billet fairrg camera for faring repair LAW
60515050250 Rev
Apu Enclosure has large area of dd0eded coating
fwd I/h ade of apu enclosure.
Request engineering disposition for MU compartment has
large area of nre retardant missing.
Ergineerrg dspostnn:
The ombrig is not repairable. Remove any best a
bumbling seniors of coa0ng. If applicable remove Me
Atemate Method of Complarce autharizaton from the
arcade records. Renstate the Annorthiness Drecbm AD
2009.17-01 end eforkAFM Supplement 6550-2009-03 in
accordance with the state of registry regulleMertS.
"'VOID"'UH aboard hOrq.Stab. leadrg edge has torn
rubber seal.
R0f. Paint Treed&
" •VOID"'R/H irtrzerd Iell.sta0. kedIrg edge has torn
rubber seal.
R0f. Paint Traveler
04P 6550 992902 PD 2009-17-01 Inspect/3n FOr Sealant
Applied To The Exterior a The Auxilary Paver Unt (APU)
ErKIOSure.
Ref 8.14.1 erg dspo for remstaong AD 2009-17-I
Wing body fairing XICOI seYmrKi In done not Mate at panel
19648 aft of wing as marked with tape.
REF 13.1.1
Removed discrepant dome nutpeate PV: NAS1474A3 from
doubler Pit: 1159652017.41 per GAC DWG 11591352017 Rev
6.
Installed dame nutPlae 11A514740 on doubler PM:
1159852017.41 and installed doubler. Back sea% elottler
and nutplate. Work done per GAC DWG 1159852017 Rev B.
Cyan 'MU Mart Reamed' Cas message on MU start. DC
fault code 4922222APU (APU Row Cevider Sir Short)
Ref tern 8.12
Gained access to 181A1P1 ( on APU Goers). Dsoonnected
pug, Inspected and cleaned came, plug with no defects
noted. Returned aircraft to angered cafgurabco. All
OUVOSIMIXC performed song WWI 49-60-00 June 15/16.
during panel 196A$ nstalation noticed were somrg
freely. Marked with tape Resolution
Perknned boated fuel return operaVonal check wet no defects noted. Al work done oar 6550 AMR 28.16-00 dated
August 30. 2009.
Decade reastcr box ID* 568366 cal due date 11/18
Suninary: Removed and cleaned areas around FWD base low panel 31262F and AFT base lower panel 312A2F.
Replaced screws PN:M527039.0008 arid washers Rt:A/4960)08 per Droning 115%51419 Rev.L
See steps belOw be full Stalk.
ReM0001 al hose and crumbling sections of COOtrg per eng disco Ref Kern 8.17 be PD 2009-17-01
Ref item 8.14.1.1 kr eng depo
MR11 6391
Ref 506238.20.22.1.1
"'VOID"' Entered In wrong NC verkOKI0e
"'VOID"' Entered In wrong NC workeder
COMPUED WITH CMP G550 992902 A0 2%9.17-01 Inspection For Sealant Applied To me DiXerlar Of The Aollary
Power Urn (APU)Erdoare
PrevlOuSly templed vnth in Log Book EMI, dated 08/18/09.
Verified AFM Supplement 050-2009-03 was incorportated into the MM
Renewed and rePtXed diSCMpant dome nutplate Pit: NAS1474A3 on 004.0/W PK 1199652017.41 and instated doubler
per GAC DWG 1159852017 Rev 6.
Installed nuts, ate PM: MAS1474A3 per GAC DWG 1159652017 Rev 8.
12,15,2017 6.21.0S AM Gulfstream Proprietary Information NeeSNW
EFTA00796538
Work Order:
5C521661 AC: 5173 STM: Charks Thomas SCC: Julian Brown Squawks: All
Yellow = Newly Added Items Green = Changed Items (Ready for inspection or completed) from previous day (or since Friday on Mondays)
Assoc Status I Diserepaney ReerWiliOn
Ref kern 8.18
821 Compiete1 R/H elevator trim tab upper surface nas 3 areas of possible
deaamnWon. Rd. Item 13.1
8.21.1 Completed Removed R/H elevator trim tab FIN: 1159C582095-423 S/N:
373 per OW4550 273024.
Ref. Item 11.56
8.212 Completed NOT Inspection mowed on marked SPOt
8.213 Completed Engineerng Cispouton for three surface discrepanoes:
Refer to Steps 1 thna 6.
I. Solent dean the three areas using dean cheesecloth
weer, wet wen HoproPil Alcohol. Continue until rapers
'then dean. Do not use synthetc or shop toted wiper
~torah.
2. $4 all wee locations sand ON surroundng paint using
• tamde paper anti a solid paint base exist.
3. At the two locations next to the grandrog jumpers
carefully sand off the dry fit cloth to expose the carbon
pir. Do not Leger art nto carton Alms. TraOSS« Claret
remaining wein the rattle snail be acceptable. 1. Heat areas sp to 120 to 140F for at least 20 minutes.
After reacting this lolo time and while heat is WI berg
apeled, surface wet areas wen Epon 828/ DTA
(GAC I ISAA2 GAC117G1 respectlx<v).
S. Renacne heat source and :plow surface ta air mol to
room temperature. Phalan at 70 to 95F trail the
attache gels MaKII slop take dace after 4 hr,.
6. Na other action required shoe NC mil be undergoing
repaint.
This is inn, repay. MR8 NO. E064
8.21.4 Completed Rhea cleaned tie tree discrepant areas. At all three
locations sailed off surrounding paint. At the two batons
reed to the mounting jumpers carefuly sanded off the dry
821.5 Completed
8.22 ritteg
aP)rosel
(L)
8.23 Completed
8.24 Completed
8.24.1 Completed
8.242 Completed
8.243 Completed
825 Completed
826 In
Progress
8.26.1 Completed
6262 Open
8.26.2.1 Completed F/G Mtn to expose the carbon ply. Heated areas to 120 to
140F tor at least 20 minutes Solace coated areas with
Epan 828 / DTA (GAC11SAA2 / GAC117G1 respectively).
Reference ergineerrg dsposstion in step 8.213
Installed R/H elevator blm tab P/N: 115%552095423 S/N:
373 per RIP 6550 273024.
Ref. IS 11.561W 560348 Cal 12/2017
Horizontal stabiles R/II hoist plug stopped.
Ref. 13.1
ull Flap Traded 1/8 Roller is worn beyond lints per
6550 MIM 273000 Rev. march 31117
Ref. 13.2
MI flap Track Aft I/O Roller is worn beyond Imes per
6550 AMM 27.5000 Rev. MarCh 31/17
Ref. 13.2
RemOved R/H Rart TraCk Mt outboard bracket Replaced
WH Nap Traded 1/8 Wier with nor role, P/N
80233012Ft per DIP GSSO 275038 and Drawing
11591354220 Rev G
Redved ok to Install and Instated R/H Flap Track "V AFT
OM roller ntting. Bolts Still require torque and fang
rewires sealant per 1159C554220 Rev G.
Oct require torque and fang requires sealant per
1159(554220 Rev G.
R/H Hap track 0/8 roller bracket for track has shipped
out tolts. bot roles/nutplates may require clearing out.
Ref/ism 8.24
While conveying wit paint strip lund dar in right fuselage
at GYPS 694.000, skin P/N 115%51316. Impression is
approximately C wide by r high and .012' deep.
Rel 13.1.2
Request NDT to Chetk for cracks at discrepant area.
Request engineering dive for repar of dent In the right
fuselage.
Preliminary Engneerng Csspastten:
I. Gain access to the Wen« Side of the dented skin
Visually inspect the dscrepant area for any additional
diamaten to surroundng structure
2. Cold work the dxrcpart area per the procedures in SR
1077 to restore the skn to surrouncing contour 4/..005 irs Strnmarr. Removed CI Omar urn tab PM: 1159C552095-423 5/Il: 373. Cleaned. pepped and repaired all Wee
surface discrepancies. Reference Engineering *%O. in SOW 8.21.3. Installed Fuls eievator ten tab Pitt
1159352095-423 S/N: 373 Ref. DIP GSSO 273024 Items 11.56 See correspondrg steps for detals of work performed.
1W 560349 Cal 12/2017
NOT performed Tap test inspection on R/H elevator trim tab upper surface per GAC AIDTP 2.1 rev 7 09/16/2015
No relevant incicabons noted at MS tele
Replaced NI %pi? Triads Mt I/B Roller with new roller, P/N KRF233012FT, LAW CIP G550275037 and Drawing
1159055420 Rev G
Sirrimay: Removed Rill Flap 'V Traded outboard bracket Replaced NH Flap 11' Track AR 1/B it with new
roller, FIN XRF233012FT. Installed R/H Flap 'Er Track Mt aboard bracket. Work performed per ChIP 6550 275038
and Draning 1159C554220 Reg G.
See steps below far detakd week performed.
Torpred toOltS On fitting and sealed per 1159C5524220 Rev. G
Torque Wrench* 558039
CAL: 08/18
Upon further imestigaton round R/H Flap Track B' 0/8 ROter Bracket hardware to be stepped and ~rates are
functioning property_ Instated and torqued NEW hardware per 2741-05 Rev. November 15117.
POttrmed Eddy Current Insp.:than per GAC NOW 3.0 (REV 7 SEP 2015).
No <redo noted at the bele.
Equprnere Used: Hartet 5005 GACD 555039 (cal due 12/17) and SID. 560706 (no cal reg.)
Christa Kerby, MR81E742
12/151011 6:21:0S AM Gulfstream Proprietary Information port 6 of 29
EFTA00796539
Work Order:
5C521661 AC: 5173 STM: Charles Thomas SCC: Julian Brown Squawky AS
Yelloiv = Newly Added Items; Green = Changed Items (Ready for inspection or completed) from previous day (or since Friday on Mondays)
Assoc Stan—al Disawanogr Resolution
Dill a hde .1285-.1335 in. de. per GQIIIAL1)35G at the
sharp, center part of the depress= to relieve the retard
aid tartrate celd "sonde°
3. HOT the cold worked area for cracks (eddy current) and
remanng matend thane's (ultrasonic).
4. Inspect the cold waked area for al canning.
5 Rea*nit results to engineers; sar evaluation.
mRe4/742
9
10
10.1 Wang
aPProved
(1) Paint
Outstorialksp Parts, Materials, and / or Services
Eng inee rs tater
10.2
10.3 Wattles,
approval
(L)
Waiting
a0Orcwar
a.) Back Ordered PartS
Pats Return
11
11.1 Completed
11.2 Completed
11.3 Waiting
(I.) 0(04
11.4 Waiting
approval
0.1
11.5 Wattles,
approval
(L)
11.6 Comokte0 Follow on CMP Codes / Maintenance Tasks
CmP 6550 711001 Inlet Cool (Left) Remota I Instaltstian
Rel. 2.1 COMPLIED WITH CMP 6550 711001 Inlet Coal (Left) - Remard / Installation
TW 558064 Cal: 08/1E
COMPLIED WITH CMP 6550 711002 Inlet Carl (Right) - Removal f Instalaten
TW:557274 Cal Due: 06/18
1V(:557259 Cal Due: 03/18
COMPLIED WITH CMP G550 711022 Upper Cowl Door (Right) - Removal InetallatiOn
Torque Virendies used: 557274 Cal die 06/18
557259Cal due 03/18
COMPLIED WITH CMP G550 316024 DISPLAY I.X4IT, x4
pn off: 7028140-901
PO on: 7028140-905
sn oft 07092716
sn ore 09125363
COMPLIED WITH CMP 6550 221001 PANEL, FLIGHT GU@VICE(GPS00)
Po OlflOn: 7021852-901
sn off: 06030509
sn an: 090130720
COMPLIED WITH CMP G550 316030 CElfIRM. DISPLAY SYS - ADJ/TEST
COMPLIED MTh [MP 6550 221002 AUTOPILOT—OPERATICNAL TEST
COMPLIED WITH CMP G550 330901 SWITCH PANEL 11
COMPLIED WITH CMP G550 330930 SWITCH PANEL 130
COMPLIED WITH CMP 6550 330935 SWITCH PANEL ar3S
COMPLIED WITH CMP 6550 330924 SWITCH PANEL 124
COMPLIED WITH CMP G550 330904 SWITCH PANEL xe
COMPLIED WITH CMP G550 330925 SWITCH PANEL 125
COMPLIED WITH CMP G550 330942 SWITCH PANEL :42
COMPLIED WITH CMP 6550 330938 SWITCH PANEL 138
COMPLIED WITH CMP 6550 330936 SWITCH PANEL 136 CMP 6550 711002 Inlet Coal (Right). Removal /
Installation
Ref. 3.1
CMP 6550 7110190ml Door, Engine Lower (Left)
Rel. Item 2.1
CMP 6550 711020 Engine Loner Carl Door (Part) -
Removal f Instalatian
Rel. Item 3.1
CMP 6550 711021 Upper Cowl Door (Left) Rerrograli
Installation
Ref. Han 2.1
04P 6550 711022 Upper Cowl Door (Right) • Rerno4
InetallatiOn
Ref. item 3.1
1I.7 COmOlne0 04P G550 316024 DISPLAY UNIT, a4 Ref 64
11.8 Completed CMP G550 221001 PANEL, (LIGHT GUIDANCOGP-500) Rd
63
1I.9 Completed
11.10 Completed
11.11 Waiting
approval
(L)
11.12 Waiting
00rOyal
(L)
11.13 Waiting
a00rOyal
a.)
11.14 /long
Wowed
(1)
11.15 Waren,
Wowed
(1)
11.16 Wang
angrOyal
(L)
11.17 Waiting
angrOyal
(L)
11.18 Waiano
angrOyal
a.)
11.19 Waiano
approval
(1.1 CMP 6550 316030 CENTRAL DISPLAY SYS - AD)/TEST Ref
11.7
04P G550 221002 AUTOPILOT —OPERATIONAL TEST Ref
11.8
04P G550 330901 SWITCH PANEL xl (48251)
(VEST. SW PHL)
04P G550 330930 SWITCH PANEL X30 (60157)
(t/H DIVAN AFT ARM SW PHL)
CMP G5S0 330935 SWITCH PANEL 135 (601510)
(R/H SEAT 93)
CMP G550 330924 SWITCH PANEL 124 (601511)
(VH SEAT al SW MIL)
04P G550 330904 SWITCH PANEL X4 (59651)
(FWD LAV SW PNL)
CMP G550 330925 SWITCH PANEt. X25 (60153)
(Lill SEAT *3 SW PftL)
04P 6550 330942 SWITCH PANEL 142 (69652)
(AFT LAV SW PHL)
04P G550 330938 SWITOI PAHO. 138 (601512)
(I4 DIVAN LEDGE FWD StY PM)
04P G550 330936 SWITCH PANEL 136 (601511)
(WI4 DIVAN FWD ARM SW PHL)
12,M2011 ag IDS AM Gulfs:beam Proprietary Information Nos, of 29
EFTA00796540
Work Order:
SC521661 AC: 5173 STAN: Charles Thomas SCC: Julian Brown Squawks: All
Yellow = Newly Added Items, Green = Changed Items (Ready for inspection or completed) from previous day (or since Friday on Mondays)
Assoc Status DIsaspancy Resolution
11.20 Waibng
aPoroyal CMP GSSO 330905 SWITOI PANEL IS (59652) COMPLIED WITH CMP GSSO 330905 SWITCH PANEL 15
(FWD IAV SW PHL)
11.21 Walarg
aPoroyal 04P 6550 330940 SWITCH PANEL X40 (57153) COMPLIED WITH CMP 6550 330940 SWITCH PANEL #4.0
(L) (ENT CABINET SW PHI)
11.22 Walarg
aCIProyal CMP 6550 330928 SWITCH PANEL 128 (60155) COMPLIED WITH CMP 6550 330928 SWITCH PANEL :28
(L) (Ull DIVAN LEDGE FWD SW PM)
11.23 Walarg
aPProyal 04P 6550 330927 SWITCH PANEL x27 (60154) COMPLIED WITH CMP 6550 330927 SWITCH PANEL X27
(1) (Lill DIVAN FWD MM SW PHI)
11.24 Waibng CMP GSSO 330943 SWITCH PANEL 143 (69653) COMPLIED WITH CMP GSSO 330943 SWITCH PANEL 143
40(04
(I) (AFT IAV SW PHI)
11.25 Waibng CMP GSSO 330933 SWITCH PANEL 133 (03159) COMPLIED WITH CMP GSSO 330913 SWITCH PANEL 133
Wowed
(R/H SEAT a 15W PNL)
11.26 MOM 04P G550 330939 SWITCH PANEL X39 (601514) COMPLIED WITH (MP G550 330939 SWITCH MEL X39
Wowed
(L) (Fall DIVAN AFT MM SW PNL)
11.27 Walarg
aPProyal CMP G550 330941 SWITCH PANEL x41 (50251) COMPLIED WITH CMP G550 330941 SWITCH PANEL /41
(L) (CREDEM2A SW PPM)
11.28 Walarg
aPProyal 04P G550 330929 SWITCH PANEL X29 (60156) COMPLIED WITH CMP G550 330929 SWITCH PANEL X29
(L) (Ull DIVAN LEDGE AFT SW ML)
11.29 Waibng CMP GSSO 330932 SWITCH PANEL 132 (57152) COMPLIED WITH CMP GSSO 330932 SWITCH PANEL 132
40,04
(I) (VH WINDOW x 7 SW MIL)
11.30 Waibng CMP GSSO 330937 SWITCH PANEL 137 (601513) COMPLIED WITH CMP 0550 330937 SWITCH PANEL 137
Wowed
(I) (R/H DIVAN LEDGE AFT SW PHI)
1131 MOM 04P G550 330903 SWITCH PANEL X3 (57352) COMPLIED WITH CMP 6550 330903 SWITCH PANEL •3
Wowed
(L) (GALLEY SW PNL)
11.32 WalOng 04P G550 330934 SWITCH PANEL X34 (57151) COMPLIED WITH CMP 6550 330934 SWITCH PANEL :34
.300royal
(L) (III SEAT *2 SW PNL)
11.33 Waibng
aPProyal CMP GSSO 330902 SWITCH PANEL 12 (57351) COMPLIED WITH CMP 0550 330902 SWITCH PANEL 12
(1) (GALLEY SW PNL)
11.34 Waibng
aPProyal CMP GSSO 330931 SWITCH PANEL 131 (60158) COMPLIED WITH CMP 0550 330931 SWITCH PANEL 131
(1.) (VH WINDOW • 6 5NY PNL)
11.35 Waibng 04P GSSO 330926 SWITCH PANEL 126 (60152) COMPLIED WITH CMP 0550 330926 SWITCH PANEL 126
(I)owed
(I) (Ual SEAT a 2 SW PNL)
11.36 MOM 04P G550 233084 DIgtal WJeo Du Mayer (No. 1) - Neal COMPLIED WITH CMP 6550 233084 Digital Video Disc Player (Na. I) - Anal Phase Removal! Installation
'Vowed
(1) Phase Reward / Installation
11.37 walerg
aCcroyal CMP 6550 233089 Digital Video Disc Play. (No. 2) - Final
Phase Removal/ Installation COMPLIED WITH CMP 6550 233089 Digital Video Dale Player (Na. 2) - Anal Phase Removal! Installation
(L)
11.38 WaiOng CMP GSSO 233061 Ccenpact Dec Mayer (1b. 1) - Anal COMPLIED WITH CMP 0550 233061 Compact Doc Mayer (Ho. 1) - Ansi Phase Removal! Irate/latch
40(04
(L) Phase Remy& / Installation
11.39 WaiOng CMP GSSO 383001 TOILET, AFT LAY
40(04
11.40 Completed CMP GSSO 323011 lading Gear Errercency Extemion COMPLIED WITH CMP G550 323011 Landing Gear Emergency Extension Nerogen Dm-dawn Battle (Right) -
Nitrogen Bkrnmaann Bch* (Mgt) - Rernotal Inge/labor, Removal/ Instalatian
1W: 568539 Cal. Due: 02/18
IW: 562027 Cal. Cue: 06/18
11.41 Completed 04P 6550 351023 Crew OXygen Mask aria Regulator Box COMPLIED WITH CMP 6550 351023 Crew Oxygen Mask ant, Regulator Box (CI:Karver) Removal / Insolation
(COServer) Removal / Imtalation
Ref. 23.22
11.42 Completed CMP 6550 351036 Mentor Oxman Mask Removal / COMPLIED WITH CMP 6550 351036 Mover Oxygen mask Remcnral F Installatian
Installation
R01. 23.22
RBJ page: I2C
11.43 Waihng
aPpnwal 04P GSSO 381001 WATER TANK, el
Rd. 15.1
(I)
11.44 Yealorg
wormed CMP G550 350015 Waste Tank UltrasonK Level Sensor
(Left) - Removal / Installation COMPLIED WITH 04P 6550 380015 Waste Tank Ultrasonic Level Sensor (Lett) Removal/ Installation
(1) IW: 567921 Cal Due: 09/18
11.45 Completed CMP G550 383031 Waste Tank Ultra Level Sensor left. COMPLIED WITH CMP 6550 380031 Wage Tank Utra Level Senor left, Oeanng
12,15,2017 6:210SAM Gulfstream Proprietary Infermatien Page Ref 29
EFTA00796541
Work Order:
SC521661 AC: 5173 STM: Charles Thomas SCC: Julian Brown Squawks: All
Yellow = Newly Added Items, Green = Changed Items (Ready for inspection or completed) from previous day (or since Friday on Mondays)
Assoc Status Disawanet Resolution
Oesnrg
TW:567921 Cal Cue:09/18
11.46 amMete0 04P 0550 380032 Waste Tank Ultra Level Sensor Right, COMPLIED WITH CMP 6550 380032 Waste Tank Ultra Level Sensor Right Oearing
11.47 Waiting Oben%
CIO GSSO 393025 Logs Gritrol Motb.ne System-bps Ck 1W:567921 Cal Due:09(18
%WOW,
0.)
11.48 Waiting CIO 6550 383024 Waste Tank Ultrasonic Level Sena COMPLIED mni OW 6550 383024 Waste Tank Ukrasonic Level Sensor (Right) - Renaud/ Installation
%PAWN
0.) (Right). Removal / Mstatation
1W: 567921 Cal Due: 09/18
11.49 Completed CMP 6550 283006 FUEL SYS-Aux POWER UNIT BLEED COMPLIED Mill OW 6550 280006 FUEL SYDAUX POWER LMT BLEED
Ref tern 8.12
11.50 amMete0 O4P 0550 4%001 ArAdlaiv Power Unit (.41V) FurX04n31 COMPLIED WITH CMP G550 490001 AlWilify Power Unit (ARV) • Funanal TeR
Test
Ref tern 8.12 Ref. swam& 8.19
11.51 walOng
approval O4P 6550 342650 Reward tcoVng Infrared Whtlaw
Assembly - Removal / Installation
(L)
11.52 WalOng CMP 0550 352009 PAX 0kV SYS (AUTOIMMI)-FUNC CX
11.53 (L) WOW,
amMete0 O4P 0550 491101 OM • Removal 2 tristalaUon COMPLIED WITH CMP G550 491101 API) • Renxreal / Installation
Ref tern 112
11.54 Waiting CMP 6550 275001 Ftnp Assernbly (Left) - Removal f
%WOW
(1.) Installation Ref.13.1 1
11.55 Waiting CMP 6550 275002 Rap Assernbly (Rapt)- Removal!
'onward,
(L) Installation RE113.1.1
11.56 amMete0 CMP 0550 273024 Trim Tab, Elevator (Right) Rel. Item 8.21 COMPLIED WITH CMP 6550 273024 Trim Talx Elevator (R301)
1W 560348 Cal 12/2017
11.57 Com0kte0 04P 0550 273306 EVL 1R114 TAB CONTROL SYS • Fa COMPLIED WITH CMP 6550 2733% EVL TRIM TAB CONTROL SYS - Fp
11.58 WAN
approval 04P 0550 324003 Main Wheel Assembly (Left Outlwald) •
Removal f Instalation ref 25.1
(1)
11.59 WAN
approval O4P 6550 324004 Main Wheel Assembly (Left Irtgard) •
Removal f Instalation ref 25.1
(1)
11.60 WWg 04P 0550 324005 Main Wheel Assembly (Right Inboard) •
11.61 %OW
(L)
Waiting ReM041 t IngalatlOn
CMP 6550 324006 Man Wheel Assembly (Right Outboard) -
%OW
0.) Removal t Insta1a0an ref 25.1
11.62 Waiting
wows CMP G550 324009 Win Landing Gear Wheel Iliearrg (Left
Outboard) - Inspection / °NW ref 25.1
(L)
11.63 Wdl0rg
approval O4P 6550 324010 main Landing Gear Wheel Bearing (Left
Inboard) - Inspection !Check ref 25.1
(L)
11.64 Wdl0rg O4P 6550 324011 Main Landing Gear Wheel Bearing (Right
Wowed
(L) Inboard). Inspection /Check ref 25.1
11.65 ww0
aCgrOgil O4P 6550 324012 Main Landing Gear Wheel Bearing (Right
Outtgard). Inspection / Owe i ref 25.1
11.66 (1)
Waiting DIP G550 324015 Win ire Assently (Left Outboard) -
%OW
0.) IASI/Mien ref 251
11.67 Waiting CMP 6550 324016 Mein lire Assembly (Right Outboard) -
'onward,
0.) Inspection ref 25.1
11.68 Walen9 04P 6550 324034 mam lire Assembly (Right Inboard) •
'onward,
(1) Inspection ref 25.1
11.69 Walen0 04P 0550 324033 Main lire Assembly (Left Irtgard) •
'onward,
(L) Inspection ref 25.1
11.70 Walen0 CMP G550 324020 WHEEL. L MG OBD(s1)-NDT 1N5P ref
11.71 %NOW
(L)
(Halting
aCIINOYal 25.1
CMP 6550 324021 MED., L MG INEID(E2)-NOT litSP
ref 25.1
0.)
11.72 (Halting
approval CMP GSSO 394022 MED., R MG IN/30(e3)4407 INSP
ref 25.1
12,15,2017 6:21IISAM Gulfstream Proprietary Infermatlen Parc 0 of29
EFTA00796542
Work Order:
SC521661 AC: 5173 STM: Charts Thomas SCC: Julian Brown Squawkm MI
Yellow = Newly Added Items Green = Changed Items (Ready for inspection or completed) from previous day (or since Friday on Mondays)
Assoc Status Discrepancy RawAudon
(L)
11.73 Wean?
aPPrOWI CMp 6550 324023 WHEEL, R MG 0013(09)-NDT INSP
rel 25.1
11.71 %Werra
reprovd CMP GSSO 123301 Htin The Assembly - Seniong
ref 25.1
(L)
11.75 COmPkted CMP G550 314030 Modular ALtOnKS Unit r 1 - RemOval / COMPLIED WITH CMP 6550 314030 Module. nocrucs Unit II • Removal / Instalation
Installation
Torque Wreed, C/N: 553002 Due: My 2018
11.76 Competed 0.1P 6550 314034 »Muter Amoncs Unit R2 - Removal COMPLIED WITH CMP G550 314034 Modular Avows Unit 42 • Removal! Inealation
Installation
Torque Weird ON: 553002 Due July 2018
11.77 Wailing
aPPro•ul CMP 6550 314120 A5C8 Tenn Sweep COMPLIED WITH OW G550 314120 A503 Tehet Sneep
11.78 Cu
Waiting
aPPM•gl CMP GSSO 314025 CENTRal ter STS OP 01E0(
(L)
11.79 Waihrog
approwl CMP GSSO 344207 Enhanced Ground Pm:dinky ~hear
Warning System - Rerun to Service Test COMPLIED WITTI OW 6550 399207 Erhanced Groots Proximity Weidshear Weinig Swtern - Relent to Service Test
(L)
11.80 Wailing
approwl OW 6550 344201 MODULE el, EGPW5 COMPLIED~ CMP 6550 344201 MOCULE sl, EGPWS
(L)
11.61 Wailing
approwl CMP 6550 345810 GPS • Opratbnal sea COMPLIED~ CMP G550 345'310 GPS • Operational Cheek
11.82 Carpeted CMP 6550 314309 inadular ALtOnKS UnIt 43 - Remaal! COMPLIED WITH CMP G550 314309 Module. avioncs Unit 43 Renwal! Ingalatgn
Installation
Torque WrenchC/N: 553002 Due July 2018
11.83 Wien?
aPXOYal CMP GSSO 314320 MW-Operational OieW COMPLIED WITH CMP GS50 319320 mau Operational Cheer
(L)
11.81 Waibro
warped CMP GSSO 275037 IS Track flap Raters (Left Inbed Upper
Aft) - Renwal! Installation COMPLIED WITH 09P 6550 275037 B Trade Flap Rollers (Left Inboard Upper Mt) - Removal! Instalbbon
(L)
Rel 8.23 TW: 558064 a due: OB/18
11.85 Wean;
approval CMp GSSO 275038 IS Track flap Raters (Right Inboard
Upper M)- Removal! Iretdlabow COMPLIED WITH DAP GS50 275038 B Trod, Flap Rollers (bald Inboard Upper AR) - Rernmal / Installation
0.)
Ref 8.24 TW: 558064 a due: OB/18
11.86 Completed •••PERMMANT REMOVAL*** 0`4P G550232150 Cabin •••PERMENANT RWOOVAL".• COMPLIED WITH OP GSSO 232150 Cabin Netwak Accderetor. REF: SOR INSTALL
Network Accelerator 15.15
Pfit 1110-A-C601-20
5/N: 669
F5: 632.000
WT: 10.12 LB5
12 WCR's - Work Change Requests
12.1 ~Ong
aPPrOval WCR 1- APPROVED: Custc.ner request the Entrance Doer.
Arstalr Door Jamb, Insole tanong Gear Deti'S and Insole
Cl.) Surfaces of me ha Crakes oe panted "mite at exlstrog color.
This WCR is witten to commwrate chance horn proposal
7037536, and customer drecoon
Informant° 0* Item
12.2 Wawa
«Prowl WCR 2- EXCUSED: Customer request to replace al Cam
etsset Inn; material we. OJSIOMet selected grossOnt.
22.3 (L)
Open WCR 3- APPROVED: Customer request to renvox the two
12.3.1 Open (2) console table; and Ws Iron me win sae ledges.
Wood later Only
12.3.2 Open INT Swport (OA) Labor Orgy
12.3.3 Open Inspeedan tabor Oh*
1ZA Ogen VCR 4- APPROVED: Customer request to remove al cabin
dual curtielders and replace with single ocholders No
cuplidders wal be required at the dieren or the area 'Mere
the two cosset tables are rerncned.
12.4.1 Open INT Sheet meal Labor Only
12.9.2 Open Wood Labor Only
12.9.3 Open Inspection labor 0*
12.5 Walbng
arofovai V/CR S- DECUNED: Customer request to replace the
aIrStar vinyl with new customer selected
12.6 (L)
Open WCR 6- APPROVED: Customer request to replace the galley
and galley annex counter top nouns mtt. narcinood.
The current nosngs will be removed. The sen noungs wil
be fabricated of hardnood and veneer.
12/11,2017 6:21.0SAM Gulfstream Proprietary Information Pan IO of 29
EFTA00796543
Work Order:
5C521661 AC: 5173 SIN: Charles Thomas SCC: Julian Brown &pawl= MI
Yellow = Newly Added 163,174 Green = Changed Items (Ready for inspection or completed) from previous day (or since Friday on Mondays)
Ain Stalin I Diwreglancy Resolution
12.6.1 Open Wood Labor Only
12.6-2 Open INT Finish sal Paint Labor Onty
12.6.3 Open Inspection Labor Ortv
12.7 Waiting
approval
(L) WCR 7. DC-CUNED: Customer requests t0 add MO (2) each
110 VAC and two (2) each USE <hissing ports in the
mdWL
12.8 Waiting
atOrOval ViCR 8. CeCURB): Customer leaves% instaltgron of LED
Wester lights.
12.9 (1)
Waiting
approval note: /WPM light bezel plating Is not Included. Sboutl the
light bezels realm plating. the Rem wll be worked as a
tole and material effort
ova 9- DECLINED: Customer requests to replete all calm
hardware.
12.10 0.)
Waiting
eeProYal Due to fluctuations in plating costs, cis WCR a berg
presented as a bidgetary effort.
Al Ginn hardware wit be remover, and Matra to the
customer selected finish. the plated terns wit be
reinstalled and operatenaty inspected for proper fit and
function.
Notes: My repairs found nerinsxy ere not included end
wet be addressedon a brie and inaterwl basis.
VCR 10- CeCUNIEO: Customer request t0 recover Me
baggage compartment with new grosspoinl matted.
12.11 (1)
Waihn9
aPProval Tee baggage compartment will be disassembled as required
t0 remove al misting grosspoint from the subsoate and
omen. Specified grossoont will be notated on panels and
all areas of baggage
Al applKable hardware and hardwood Ifni v.11 be repainted
to match the new macro,.
PrOpOSal based on reuse a all applicable gOstrate and
componentry n exhort° COM:MOM
Repairs to substrate pats are not included and veil be
quoted on a tine and material bags.
VCR 11. CC-CLINEO: Customer requests to replace the
curse-it chna and flatware trawer inserts with new.
(L)
13 Option 1• Full Pant • (Ref. Item D 1.1 of Prommel
13.1 Open ID* 7037336, ROD)
Option 1. NI Pant
The preparation and applcation of the exterior pant wll De
appled n accordarxe with the orocethres are
specifications waned n the Gulistrean Aerospace Material
and Process Specification (GAMPS 4000) and will
Include tire Witmer.) Customer 'peened elements:
13.1.1 In The enSb09 Paint roll Pre removed from the Swart.
Compoote surfaces wil be self sanded to 'ww.e the
Voss from the excang paint.
The main entrance Antall- door. Altair doorjamb, and
baggage door Arne wll De parted to mach the Primary
fuselage Woe.
The nude of the landing gear doers wet be painted with
the same base color as the outstie surface.
The Landing gear wet Pre deaned.
Ynng waks wll be applied n madame with approved
A new radon DOOt wll De !Doled.
An antenna leadna edges wll have erogon tape applied.
Preciously polished metal nada= wil be buffed.
The Mine surfaces of the aimrakes wet be painted.
After completion of tne niter or paint, a weight and balance
MI be performed on the aroeft.
Any terns not listed above wil be quoted map:retain
basis by the GlifStrtem laciltes Pant Operdt715
manager, inducing labor and materials on a Won Ovnge
Recitell (MR).
"' SEE APPENDIX FOR ADDITICOLAL IAPO •"
Methanol Pant Traveler
13.1.1.1 Progress
Completed Temperately install of panel 32SAT, and panel 337CT fee
part traveler Pet 6550 ANN 55.30.00 Rer.ftw 15/17.
13.1.1.2 Open Rel.13.1.1
Remove panel 32SAT, and panel 337CT after con:fees, of
pant bander per GSSO Anal SS-30-00 Rev.Nov 15/17.
Rel.17.1
13.1.2 Waiting 2rea Aircraft Sopped aircraft per GAleS -0300 rev. G.
13.13 Imp
In Prep AMA
PrOWeSS
12/108011 6:21.m AM Gulfstream Proprietary Information Paps I I of 1.9
EFTA00796544
Work Order:
SC521661 AC: 5173 STM: CharIM Thomas SCC: Julian Brown Squawks: M
Yelblv = Newly Added Items Green = Changed Items (Ready for inspection or completed) from previous day (or since Friday on Mondays)
ASSOC iStalt181 I Disamsancy
13.1.1 Open
13.15 Open
13.1.6 Open
13.1.7 Open
13.18 Open
13.1.9 In
Progress
13.2 Completed
13.3 Open
13.3.1 Open
13.3.1.1 Completed
S
Waibng
approval
(1)
In
Progress Layout ArcreA
Part Aircraft
DetallNrcraft
Weight and Waite
customer support
ergneenng supped
Inspect di flap rollers prior to pent.
Radome to Snare perimeter steps. detail Insprxtion R/H
Se negative step of .053 out of links, matted with
moskng tape with mows per G550 AMM 53-02-01 Rev. Nay
15/17. Ref Plant bavekx 1 le.
Request engineering Oimosnon to cared rt/H Sate negaave
step on radorne that is out of limits.
Engreeerng Dspezton:
It IS acceptacie to repar the outol.toluance radcrne sten
In accordance with Gurstream %nice Letter GSL035300301
Rev. .*Aerodinarnic filer Sweep- Fair Procedure -
Radcme Steps". This Gullstrearn Seneca It (a) a
Ct3S9Aed as a Man& acturers Service Document and IS
gleeMed by ArIMPXy Circulars 20.176A and AC 120.77.
Completing a repair per a Gullstream Serwce Letter is
Slmfar to tOrnMeting a repair per the Sincere Meer
Manual (5R/4); No sepal number specric FM Form 8103-9
is required and mil not be mended n support of a GSL
repair. The Engneenng (Scarce) Data for this Service
Letter has been shown to comply AIM the soot* FM'S
artIls FM Approved. &sinew.° source data is retained
by Gulfstrearn as propietary data.
Photographic Documentation • (Re. Rem Ei it Of
Proposal IDS 7037536, ROO)
Protourare- Whimcreation a no dupe to Customer may
be taken n act:rant nth the folbmng agreement
between the Custoter and Gullsveam.
Should the Customer like to ParVegate in this PhotograpNc
Documentation, please renew the folkmirg agreement
and authorize by accepting this item on the proposal
summary Page
Agreement:
airstream reserves the right to photographicallydocument
the outetting process and the refurbshe0 arcraft. Al
Photographic DOCuMentifign Is accompli9ed at
GtOstresen% dsueton.
GI-Ostrom reserves the right to use in advertising, as the
affStrearn Internet sites GullereamsAde0S. promoting or
othenstse supporta° the business of Cunneen\ Inciudre
wakes imeaoca copYng, ram:duct/a% ph1shing in a
Before and After coffee table beck, n hole or in pal.
Indvdually a In conjunction AIM other matcrials.
The aircraft and oanosimp information ...al Mt be mdoded
in any pubic p/blicabch
Buyer is prended with the lc/loving photography after
aircraft delivery:
One (I) electronic copy et areran Fee.teg-afwe
3st Oxman (Ka-hand) Nigh-Speed Data
installation - (Ref. Item 5 2.2 of Proposal me
7035248R03)
xt Convex (ca-band) Mgh
📷 Images in this document (29 detected; 6 largest described)
AI-generated factual descriptions of embedded images (llava:13b). These are searchable across the corpus.
[Image 1] The image appears to be a photograph of a printed document, specifically a table or list with multiple rows and columns. The document contains text, which seems to be a list of items or tasks, possibly related to a project or a schedule. The text is too small to read in detail, but it includes headings and subheadings that are not fully visible. The document is presented in portrait orientation an
[Image 2] The image shows a printed document with a table of text. The document appears to be a schedule or agenda, with rows of text that likely list items or topics to be discussed or addressed at a meeting or event. The text is organized in columns, with headings at the top of each column. The document is in English, and the text is too small to read the specific details. The style of the document is for
[Image 3] The image shows a document with a table of text, which appears to be a schedule or agenda. The table is organized into columns with headings such as "Date," "Time," "Title," "Speaker," and "Location." There are rows of text under each heading, indicating specific events or meetings with details such as dates, times, titles, names of speakers, and locations. The document is structured in a formal m
[Image 4] The image shows a document with a table of contents or an agenda. The document appears to be a professional or academic paper, as indicated by the formal layout and the presence of headings and subheadings. The text is too small to read in detail, but it includes sections such as "Introduction," "Literature Review," "Methodology," "Results," and "Discussion." There are also references to figures a
[Image 5] The image shows a document with a table format, which appears to be an agenda or schedule for a meeting or conference. The table is divided into columns with headings such as "Time," "Title," "Speaker," and "Abstract." There are rows of text under each heading, indicating the schedule for different sessions or presentations. The document includes names, dates, and abstracts of the topics to be dis
[Image 6] The image shows a document with a table and text. The table has columns with headings such as "Title," "Date," "Time," "Location," and "Speaker." The text in the document appears to be a list of items or topics, possibly related to a meeting or event, with bullet points under each heading. The document is a scan or photograph of a printed page, and the text is too small to read in detail. The styl