72- WATER START END EST.COST NOTES PHOTO STATUS
72- WATER START END EST.COST NOTES PHOTO STATUS
DEVELOPMENT
5/6/2014 Continuing Pumping Water working on the target-68afa
4/4/19 - CC forwarded E Mail with Updated Water Level Charts for
Wells B & K. Well K is good, Well B need to keep an eye on getting
close to 20ft.
4/8119 - New Readings will be taken & forwarded to CC for review
96B - PAVING OF START END EST.COST NOTES PHOTO STATUS
ROADWAY
6/29/2017
102 - LUTRON START Eta SYSTEM - MH
2/22/2019
START 118B PURCHASE EST.COST
WATER TRUCK
118C - PURCHASE START END EST.COST
GRADER 3118119 - Received letter from Calvert & Menlcucci - Collections
Agency for Universal Construction, Inc. Forwarded to RK & DI.
3/20/19 - A Complete Timeline. Details, E Mails & Photos
forwarded to DI & RK
3/26/19 - DI contacted BG requesting details on Project
3/26/19 - BG forwarded Universal Construction Contract &
Corresponding Maps, highlighting areas of concern. Other
Contractors have indicated a Overlay would help, but not resolve all
the issues. As soon as they apply the fix the road will look Patchy
—1--3/29/19 - Forwarded to DI more Photos/Timeline & Reconfirmed
Areas of Concern
NOTES PHOTO STATUS
3/12/18 - Lutron Rep On Site. Reviewed system with Randy from
RMC Electric. Existing system was designed for local control at the
physical switches not controlled by the Lutron system in the Mech
Rooms, therefore will be difficult, but not impossible to upgrade.
Lutron are reviewing the options
4/4/19 - Lutron where due Back On Site with RMC Electric, Lutron
cancelled meeting due to work emergency. Awaiting new date
NOTES PHOTO STATUS
Will review with JE On Site Pending
NOTES PHOTO STATUS
Will review with JE when On Site Pending
Page 1
EFTA00811082
135 -
REFURBISHMENT
RED HOUSE START
1/21/2019 END EST.COST NOTES
135A -
PURCHASE/INSTALL
AC SPLIT UNIT &
FURNACE -RED
HOUSE
138 -
PURCHASE/INSTALL
AC SPLIT UNIT &
FURNACE - LV'S
HOUSE PHOTO STATUS
4/2/19 - Work by House Incorporated - Complete
4/2/19 - Chimney Cap Installed
4/3/19 - Shower Enclosures due to be Installed 4/15/19
4/4/19 - Chavez Family started moving back into House
4/5/19 - "In House" - Stairline Railing remaining work
4/5/19 - Final Invoice from House Incorporated forwarded to RK for
approval x
x
START END EST.COST NOTES
2/19/2019 3/28/19 - Airpro Completed Install
3/29/19 - RMC Electric Completed Electrical Hook Up
4/4/19 - Unit Working 100%
$10,644.85 4/5/19 - Airpro Payment Complete
Awaiting Final Invoice from RMC Electric
START END EST.COST Awaiting
Response
PHOTO STATUS
NOTES
2/19/2019 $4,896.99 2/21/19 - 50% Deposit Paid to Airpro
3/24/19 - Airpro Completed Installation
3/29/19 - RMC Electric Completed Electrical Hook Up
4/2/19 - Unit Working 100%
$4,898.98 4/5/19 - Balance to Airpro Complete Awaiting RMC
Invoice
PHOTO STATUS
Awaiting Final Invoice from RMC Electric EmillERBEL Invoice
Page 2
EFTA00811083
139: _ START END EST.COST NOTES PHOTO STATUS
PURCHASE/INSTALL
AC SPLIT UNIT &
FURNACE - YELLOW
HOUSE
2/19/2019 $4,603.59 2/21/19 - 50% Deposit Paid to Airpro
3/15/19 - Airpro Completed Installation
3/25/19 - RMC Electric Completed Electrical Hook Up
3/29/19 - Unit Working 100%
$4,603.58 4/5/19 - Balance to Airpro Complete
Awaiting Final Invoice from RMC Electric Awaiting RMC
Invoice
:END 140 - START END EST.COST NOTES PHOTO STATUS
PURCHASE/INSTALL
X 6 UNIT HEATERS -
GARAGES RC -
2/19/2019 $8,841.43 2/21/19 - 50% Deposit Paid to Airpro
3/29/19 - All Units Installed - Running 100%
$8,841.42 4/5/19 - Balance to Airpro Complete
Project Total 1[71.6_82.85 Complete
Page 3
EFTA00811084
141 - Mitt I ,
WINDOW
TREATMENTS.
COUNTERTOPS -
LODGE START END EST.COST
3/15/2019 NOTES PHOTO STATUS
3./25/19 - Forwarded to JE & RK photos showing the condition of
Formica Counter Tops in Office & Bathrooms. For review to
replace with White Quartz $4,500.00
3/25/19 - JE Approved Installation of White Quartz
$3,000.00 "
3/27/19 - Primer/Painting of Ceilings Complete. "In House••
Bathrooms will be completed once Countertops Installed - 4/6/19
3/28/19 - Forwarded Estimate & Photos for Window Treatments
142 - PHONE SYSTEM • START
LODGE & LOG 3/28/19 - JE Approved Window Treatments
'3/28/19 - Prep & Priming of Walls Started. Due to Age of Structure
of Walls, Texture was Not Stable. Many patches required to Cover
Cracks Extra. House Incorporated have Patched, Skim Coated &
Lightly Textured all Walls, so all areas are the same. x Awaiting
Response
3125/19
JE Approved
x
Awaiting
Response
3/28/19
JE Approved
$9,210.36 3/29/19 - Deposit for Window Treatments
.4/6/19 - White Quartz Countertops to be Installed
.4/9/19 - Painting to begin "In House"
END EST.COST NOTES PHOTO STATUS
Project Placed On Hold 1/10/18
Are we still to proceed with Verizon Cellular Phone Line for Lodge?
Are we still to proceed with Verizon Cellular Phone Line & Solar
Generator for Log Cabin? Mint
Response
Page 4
EFTA00811085
START END EST.COST NOTES PHOTO STATUS
CAMERAS -FRONT
GATES
$377.55 3/13/19 - Purchased Verizon Cellular Security Camera - 30 day trail
- $20.00 a month
3/14/19 - Camera Installed, at present linked to Brice, !Miceli
phone & I Pad. Working very well. Will forward update
3/22/19 - System is working out very well, no issues. Will purchase
another Camera to install on 2nd gate
$377.55 3/27/19 - Purchased Verizon Cellular Security Camera - 2nd Gate
3/28/19 - RMC Electric Installed Electrical Hook Up
3/29/19 - Camera Installed - Running 100%
4/1/19 - Awaiting RMC Electric Final Invoice Awaiting RMC
!mkt
PHOTO STATUS 44 - SEPTIC START END ST.COST NOTES
SYSTEMS -RC
4/4/19 - Gene Basset Pumped Out/Reviewed All Septic Tanks at
RC. Reported Poor Flow to & from BH/Adobe Septic to Leaching
Fields. Poor Flow from Office to Septic Tank X 2/28/2019
The Office Line was Blocked by Tree Roots & the Abandoned Line
had not been Capped Correctly. New Clean Cuts have been
Installed - problem resolved
It appears Tree Roots have invaded Septic Lines from BH/Adobe,
Septic Tank to Leaching Field. It has been proposed to replace
BH/Adobe Septic Line &Septic Line to Leaching Field. This will
require some Trenching, CNME & RMC Electric will assist as New
Line will cross over Main Power Supply to RC
Gene Basset is working on complete proposal. ZM will assist with
Trenching & Pipe Laying. Will forward Proposal once in hand.
Tentative Schedule for Repairs - Mid May 2019
145 - GARAGE DOORS START END EST.COST NOTES STATUS PHOTO
- RC
.Will Review when JE On Site Pending
146- STSTUS START ENO i EST.COST f NOTES PHOTO
REFURBISHMENT
PICKET FENCES - RC
Repair & Painting of all Picket Fences - April 2019
$166.82 Purchased 100 Cedar Pickets - Curing in Garages
Page 5
EFTA00811086
I V - SITE WALLS &
MISC PLASTER
WORK MC
11.9
REFURBISHMENT
OUTSIDE LOG CABIN
150 W1NDSHEILD -
2002 MERCEDES START
START
START
2/13/2019 END
END EST. COST
EST.COST NOTES
Expect Bid by 4/3/19 - Work would not start until late April/May
NOTES
Logs Require Sanding, Cleaning, Water Sealing & Replacement of
Chinking. Will begin in the Spring
END EST .COST NOTES
Contacted Gary Mann (RK Contact). He contacted Mercedes
reference Windshield Repair - Unable to come up with Solution.
Gary was to contact Guard Car Companies, have left a message
requesting update
3/22/19 - As of Date & Time No Solution on how to Repair
Windshield has been found. Will continue investigating PHOTO STATUS
PHOTO
PHOTO STATUS
STATUS
REFURBISHMENT - START END EST.COST NOTES PHOTO STATUS
4/4/2019 RUNS, FENCELINES &
GATES-RC
4/4/19 - Removal of Old Gates on Runs at Stables Started x
Awaiting COMPUTOR - James Ce forwarded History of Existing Library Computer, Feb 2015
LIBRARY - MH
How do you wish to proceed?
Response
Page 6
EFTA00811087
📷 Images in this document (6 detected)
AI-generated factual descriptions of embedded images (llava:13b). These are searchable across the corpus.
[Image 1] The image shows a document with a table format, which appears to be a spreadsheet or a form with various columns and rows. The visible text includes headings such as "Date," "Time," "Name," "Title," "Address," "Phone," "Email," and "Comments." There are also numerical values and text fields filled out under each heading. The document is partially obscured by a black rectangle, which seems to be a
[Image 2] The image appears to be a photograph of a printed document, specifically a form or a checklist. The document contains a series of items or tasks, each with a checkbox next to it. The text is too small to read clearly, but it seems to be a list of items or tasks that need to be checked off. The form includes columns for a date, a description of the item or task, and a checkbox for completion. The d
[Image 3] The image shows a document that appears to be a table or a list with several columns and rows. The visible text includes names, dates, and possibly some notes or descriptions. The document is not clearly legible due to the resolution and angle of the photograph. It seems to be a form or a record of some sort, possibly related to a schedule, tasks, or events. The specific content of the document is
[Image 4] The image shows a document with a table that appears to be a list of items or tasks, possibly related to a project or a set of instructions. The table has columns with headings such as "Task," "Description," "Status," and "Date." There are rows filled with text, but the specific content of the text is not clear due to the resolution of the image. The document is a scan or a photograph of a printed
[Image 5] The image shows a printed document with a table of text. The table appears to be a list of items or tasks, with columns for a title, a description, and a checkbox for completion. The text is too small to read the specific details, but it seems to be a form or a checklist of some sort. The document is printed on standard letter-sized paper.
[Image 6] The image shows a printed document with a table format, which appears to be a schedule or a list of events or tasks. The table has columns with headings such as "Date," "Time," "Event," and "Location." There are entries filled in with dates, times, and descriptions of events or tasks. The document is a scan or a photograph of a physical document, and the text is legible. The visible text includes