Edwards Rotorcraft Solutions Inc.
Edwards Rotorcraft Solutions Inc.
2011 S. Perimeter Road, Suite L
Fort Lauderdale Fl. 33309
Phone Or
Fax
Sold To
FREEDOM AIR INTERNATIONAL, INC
1131 PINE POINT ROAD
SINGER ISLAND, FL 33404
UNITED STATES CUSTOMER ORDER
Order Number: C03486FL
Date: 4/9/2012
Page: 1
Sh To
FREEDOM AIR INTERNATIONAL, INC
1131 PINE POINT ROAD
SINGER ISLAND, FL 33404
UNITED STATES
CUSTOMER ID CUSTOMER P.O. PAYMENT TERMS FREIGHT TERMS
04911 PREPAID/CREDIT CARD Freight billed
SALES REP ID SHPPING METHOD F.O.B. SHIP DATE
SHARIEFA AU 2/15/2012
QUANTITY I T
X UNIT
PRICE EXTENDED
PRICE Otto PART ID I DESCRIPTION
1.00 FLA-MAINTENANCE 300 HOUR / 12 MTH INSPECTION 77,406.10 $77,406.10
Work Order ID: C03486FL 1
SEE DETAIL REPORT
SUB TOTAL $77,406.10
SALES TAX $4,644.37
FREIGHT CHARGES $905.00
TOTAL ORDER AMOUNT $82,955.47
EFTA01120072
Edwards Rotorcraft Solutions Inc.
Order Charge Detail Report Date Printed : April 05, 2012
C03486FL
Customer ID 04911 Aircraft I Item Aircraft Time 823.2
FREEDOM AIR INTERNATIONAL. INC Type Enloe Time 823.4
1131 PINE POINT ROAD a 53375 823.2
SINGER ISLAND. FL 33404 Reldstration No. tgLuga
Part No Deactl on Isa.ue City MMiQZ
Unit Price Ext. Price
1743645-03 FUEL FILTER KR 1.00 EA $99.00 $99.00
2-009 PACKING 1.00 EA $10.67 $10.67
206-040-279-101 PACKING 1.00 EA $34.95 $34.95
206-050-247-131 COVER ASSEMBLY RH 1.00 EA $516.00 $516.00
23066697 ELEMENT - LUBE,FILTER 5/0 1.00 EA $692.25 $692.25
555-1OT ROYCO 555 OT 10.00 EA $19.86 $198.60
67588 SPRING 1.00 EA $15.95 $15.95
756-10T ROYCO 756 MILPRF5606H 1.00 EA $9.62 $9.62
AS3208-03 PACKING 2.00 EA $1.00 $2.00
AS3209-014 PACKING 1.00 EA $1.90 $1.90
AS3209-016 PACKING 1.00 EA $14.20 $14.20
AS3209-024 PACKING 2.00 EA $3.30 $6.60
AS3209-113 PACKING 1.00 EA $15.30 $15.30
AS3209-126 PACKING 1.00 EA $3.70 $3.70
M25988/1-138 PACKING 1.00 EA $12.75 $12.75
M83248/1-021 PACKING -PREFORMED 1.00 EA $1.30 $1.30
M83248/1-029 PACKING 1.00 EA $1.13 $1.13
MOBIL254OT MOBIL JET OIL 254 5.00 EA $24.78 $123.90
MS21042L4 NUT 7.00 EA $1.30 $9.10
MS21042L5 NUT 12.00 EA $1.50 $18.00
MS28773-12 RETAINER TEFLON 2.00 EA $2.47 $4.94
MS28774-211 RETAINER TEFLON 2.00 EA $1.45 $2.90
MS28775.211 ORING: NITRILE, 70. HYDRAULIC 2.00 EA $0.67 $1.34
MS28778-16 PACKING 2.00 EA $1.00 $2.00
MS28778-4 PACKING 5.00 EA $0.70 $a 50
MS29513-270 PACKING 1.00 EA $11.40 $11.40
MS9372-029 GASKET. METAL 0-RING 3.00 EA $18.20 $54.60
$1,867.60
Part No Ihttalise ?zap_ Sellinu Pr Ice SeSrL
1271762 PRESSURE VESSEL 2.00 EA P005071FU1 $6,110.00 $12,220.00
204040.760.109 FILTER ELEMENT 3U 1.00 EA P005081FL11 $452.00 $452.00
206-073-761.101 DECAL 2.00 EA P005320FU2 $27.30 $54.60
206-076-034-003 HYDRAULIC FILTER ELEMENT 2.00 EA P005082FU1 $287.00 $574.00
209-340-265-103 SEAL 1.00 EA P005320FU6 $413.00 $413.00
31-023-8B DECAL 2.00 EA P005320FU3 $2.50 $5.00
31-023-9B DECAL 2.00 EA P005320FU4 $3.80 $7.60
406-012-108-107 PITCH HORN ASSEMBLY 2.00 EA PO05232FU3 54,175.00 $8.350.00
406-376-001-101 GASKET 1.00 EA P005081F1J5 $23.05 $23.05
407-001-116-101 SHOCK CORD ASSEMBLY 2.00 EA PO05232FL/2 $113.00 $226.00
EFTA01120073
407-023-003-105 AUX FIN ASSEMBLY 1.00 EA PO05313FU2 $alsoao $8,150.00
407-073-762-101 DECAL 2.00 EA PO05313FU1 $128.00 $256.00
407-362-013-103 FUEL PRESSURE SWITCH 1.00 EA PO05313FU3 51.384.00 $1,364.00
7270 BELT 1.00 EA PO05233FU1 $89.34 $89.34
AS3208-03 PACKING 1.00 EA PO05320FU1 $1.00 $1.00
AS3209-140 PACKING 1.00 EA PO05320FU5 $6.60 $6.60
AS3209-162 ORING: FLUOROCARBON,75 1.00 EA P005231FL/3 $6.15 $6.15
AS3209-236 PACKING 1.00 EA PO05081FU2 $4.60 $4.60
AS3209-240 PACKING 1.00 EA PO05320FL/7 $5.75 $5.75
AS3209-258 PACKING 1.00 EA P005231FIJ4 $8.80 $8.80
D0164-1 BOLT (LONG) 4.00 EA PO05308FU1 $96.00 $384.00
D0314-1 FRICTION PAD ASSEMBLY 4.00 EA PO05292FU1 $973.00 $3,892.00
M2002-1 STARTER BRUSH 4.00 EA PO05231FU2 $96.77 $387.08
MS21920-66 CLAMP 1.00 EA PO05232FU5 $82.00 $82.00
MS28775-015 PACKING 2.00 EA PO05093FU1 $0.53 $1.07
MS28778-12 ORING 3.00 EA PO05328FU1 $3.20 $9.60
MS28778-6 PACKING 2.00 EA PO0S177FU2 $0.85 $1.70
RG407 BATTERY:SEALED LEAD ACID 1.00 EA PO05231FU1 $4,165.00 $4,165.00
SL211-3-1 CLIP NUT 2.00 EA PO05320FU8 $3.15 $6.30
$41,146.24
MISC 40 PERFORM AIR SPEED PEDAL STOP FUNCTIONAL TEST IN $142.50
ACCORDANCE WITH BHT-407-MM CHAPTER 96 PARAGRAPH 96-
358 PG. # 493. PRESSURIZED PITOT TUBE AIRSPEED READS 55
KTS RUDDER PEDAL STOP ENGAGES 51 KTS DISENGAGES.
MISC 50 P/N 407440-011-103 M/R MAST ASSEMBLY S/N: BP19,T TT: 823.2 $3,112.61
INSPECT AND REPAIR AS NECESSARY.
MISC 60 P/N 407-023-003-105 FINLETT ASSEMBLY S/N: BP258 $660.00
REQUESTING PAINTING OF FINLETT IN ACCORDANCE WITH BHT-
407-SPM
Regular hour Regular Total 190.48 $20,190.88
Overtime hour 77.13 Ohime Total $12,263.67
Consumables $250.00
Freight Charge: $905.00
Discount -$2,227.40
Price Grand total $78.311.10
EFTA01120074
Phone Edwards Rotorcraft Solutions, Inc.
2011 South Perimeter Road, Suite L
Fort Lauderdale, Florida 33309
Fax: Email :-.K Art a
Edwards Rotorcraft Solutions, Inc.
Thursday, April 05, 2012
CO3486FL
FREEDOM AIR, INC Make / Model:
Serial Number:
Registration:
Total Time: BELL 407
53375
N491GM
823.2
Item Description PARTS LABOR HRS LABOR $$
COMPLY WITH FAA AD2005-03-07 EFFECTIVE MARCH 17TH, 2005
1 Complied with FAA AD2005-03-07 Effective March 17th, 2005 (Landing gear
crosstubes) and BHT ASB407-03.59 Dated October 15th, 2003 (All forward and aft
crosstube assemblies, part numbers as described below, assignment of RIN
(retirement index number) to) in accordance with AD and ASB Instructions. RIN
count assigned as 79 for each crosstube as of date of installation.
(PERFORM POWER ASSURANCE CHECK IN ACCORDANCE WITH BHT-4O7-FMS-3, SECTION 4
2Performed power assurance check in accordance with BHT-407-FMS-3 Section 4.
Engine calculated at; (+ 12).
(COMPLY WITH FAA AD2O11-25-O1 EFFICTIVE JANUARY 17TH, 2012
3 Complied with FAA AD2011.25.01 Effective January 17th, 2012 (Apical Industries
Emergency Floatation Kit) in accordance with AD Instructions. Not applicable due
to configuration of aircraft. Apical kit not installed.
(PERFORM 12 MONTH TEST IN ACCORDANCE WITH 14CFR PART 91§91.2O7(D) ON ELT SYSTEM
4 Performed 12 month test in accordance with 14CFR Part 91 §91.207(d) on ELT
system. Battery due replacement; March 2015
PERFORM 100 HOUR LIMITATION INSPECTION IN ACCORDANCE WITH BHT-407-MM-1, TABLE 4-2 ON YOKE ASSEMBLY
5 Performed 100 hour limitation inspection in accordance with BHT-407-MM-1 Table 4-
2 on Yoke assembly
(PERFORM 300 HOUR / 12 MONTH INSPECTION IN ACCORDANCE WITH BHT-407-MM-1 SECTION 5-12 THRU 5-18
6 Performed 300 hour / 12 month inspection in accordance with BHT-407-MM-1
Sections 5-12 through 5-18. Operational check, leak check, and dynamic balance of
tail rotor system performed satisfactorily.
EFTA01120075
!PERFORM 150 HOUR INSPECTION IN ACCORDANCE WITH BHT-407-MM-1 SECTION 5 18A ON ENGINE CONTROLS
7 Performed 150 hour inspection in accordance with BHT-407-MM-1 Section 5.18A on
Engine controls. Work performed under Item No 6
'PERFORM 300 HOUR INSPECTION FOR OPTIONAL EQUIPMENT ON PARTICLE SEPARATOR, ROTOR BRAKE, DUAL CONTROL
8 Performed 300 hour inspection for optional equipment in accordance with BHT-
407-MM-1 Section 5-19 on Particle separator, Rotor brake, and Dual control.
!PERFORM 300 HOUR, 300 HOUR OR 12 MONTH AND 25 MONTH INSPECTION ON AUXILIARY FUEL SYSTEM
9 Performed 300 hour, 300 hour or 12 month, and 24 month inspections in
accordance with BHT-407-MM-1 Section 5-19 and BHT-407-MMS-6 Sections 5-3 and 5-4
on Auxiliary fuel system. Operational and leak checks performed satisfactorily.
!PERFORM 600 HOUR INSPECTION ON ROTOR BRAKE AND MAIN ROTOR FRAHM
10 Performed 600 hour inspection in accordance with BHT-407-MM-1 Section 5-20 on
Rotor brake and Main rotor Frahm. Operational and leak checks performed
satisfactorily.
'PERFORM 600 HOUR OR 6 MONTH INSPECTION ON MAIN ROTOR HUB AND BLADE
11 Performed 600 hour or 6 month inspection in accordance with BHT-407-MM-1
Section 5-21 on Main rotor hub and blade
'PERFORM 12 MONTH INSPECTION IN ACCORDANCE WITH BHT-407-MM-1, SECTION 5-22
12 Performed 12 month inspection in accordance with BHT-407-MM-1 Section 5-22.
Operational checks, leak checks, post ground run special Inspection on lower cone,
and dynamic balance of main rotor system performed satisfactorily. Special
inspection required In 1 - 5 flight hours on lower cone.
!PERFORM 300 HOUR SPECIAL INSPECTIONS IN ACCORDANCE WITH BHT-407-MM-1, TABLE 5-3
13 Performed 300 hour special inspections in accordance with BHT-407-MM-1 Table 5-3
on Tail rotor gearbox, Tail rotor driveshaft disc pack couplings, Tail rotor hub mast
nut, Tailboom attachment hardware, Swashplate tilt friction. Swashplate friction
'PERFORM 12 MONTH COMPONENT INTERIM INSPECTION ON MAST POLE
14 Performed 12 month component interim inspection in accordance with BHT-407-
MM-1 Table 5.4 on Mast pole. Post ground run special inspection performed
satisfactorily. Special inspection required between 1 - 5 flight hours in
accordance with BHT-407-MM-1 Table 5-3 on Main rotor mast nut.
!PERFORM 12 MONTH OR 500 FLIGHT HOUR INSPECTION ON EMERGENCY FLOATATION SYSTEM
15 Performed 12 month or 500 flight hour inspection in accordance with BHT-407-MMS
1 on Emergency floatation system.
EFTA01120076
I PERFORM DAILY AND 100 HOUR LIMITATION INSPECTIONS IN ACCORDANCE WITH BHT-407-MM-1, TABLE 4-2
16 Performed Daily and 100 hour limitation inspections in accordance with BHT-407-
MM-1 Table 4-2 and BHT ASB407-07-80 Parts Ill and IV Dated August 27th, 2007
(Tai!boom assembly 407-030-801-107, and 407-530-014-101/-103, New inspection
renuirements) on Tailboom assembly.
I PERFORM 206 SERIES 100 HOUR OR 90 DAY CORROSION INSPECTION IN ACCORDANCE WITH CSSD-PSE-87-001
17 Performed 206 Series 100 hour or 90 day corrosion inspection in accordance with
CSSD-PSE-87.001 Section 30-5
I PERFORM 300 HOUR SERVICING REQUIREMENTS ON AIRFRAME FUEL FILER
18 Performed 300 hour servicing requirements in accordance with BHT-407-MM-2
Table 12-1 on Airframe fuel filter. Replaced fuel filter kit with new item p/n;
1743645-03. Operational and leak checks performed satisfactorily.
I PERFORM 300 HOUR INSPECTION AND LUBRICATION REQUIREMENTS IN ACCORDANCE WITH BHT-407-MM-2
19Performed 300 hour inspection and lubrication requirements in accordance with
BHT-407-MM-2 Table 12.2 and BHT A5B407-04.63 Revision B Parts IV and V Dated
September 5th, 2006 (Tail rotor driveshaft bearing 407-340-339-101/-103,
Replacement of) on Tail rotor driveshaft and oil cooler blower hangar bearings.
acre is Ananr fnr cee ernrine_inm7 ore EMI
I PERFORM 25 HOUR, 50 HOUR/3 MONTH, 150 HOUR, 300 HOUR AND 300 HOUR/3 MONTH LUBRICATION REQUIREMENTS
20 Performed 25 hour, 50 hour / 3 month, 150 hour, 300 hour, and 300 hour / 3 month
lubrication requirements in accordance with BHT-407-MM-2 Table 12-2 on Litter
door seal, Swashplate bearings, Pitch change link bearings, Tail rotor driveshaft
splines, Hydraulic pump drive, and Tail rotor pitch change mechanism. Special
inspection required between 10 - 25 flight hours on Tail rotor driveshaft disc pack
!PERFORM 300 HOUR/12 MONTH SERVICING REQUIREMENTS IN ACCORDANCE WITH BHT-407-MM-2, TABLE 12-3
21 Performed 300 hour/ 12 month servicing requirements as detailed. Serviced
transmission and tail rotor gearbox oil systems with oil; Royco 555. Serviced
hydraulic oil system with oil; MIL-H-5606. Replaced transmission filter with new
item p/n; 204.040.760.109. Replaced hydraulic filters with new items p/n; 206-076-
340-003. Operational and leak checks performed satisfactorily.
'PERFORM MISCELLANEOUS SERVICING REQUIREMENTS IN ACCORDANCE WITH BHT-407-MM-2
22 Performed miscellaneous servicing requirements in accordance with BHT-407-MM-2
Paragraphs 12-45, 12-47, 12-54, and 12-55 on Battery, Fire extinguisher, Windshield
and windows, and Oil cooler blower impeller. Operational check performed
!PERFORM 50 HOUR, 100 HOUR AND ANNUAL INSPECTION ON AIR CONDITIONING SYSTEM
23 Performed 50 hour, 100 hour, and Annual Inspections in accordance with Air
Comm. Instructions for Continued Airworthiness Report 407EC-200M-2 on Air
'PERFORM ANNUAL INSPECTION IN ACCORDANCE WITH AIR COMM INSTRUCTIONS FOR CONTINUED AIRWORTHINESS
24 Performed Annual inspections in accordance with Air Comm. Instructions for
Continued Airworthiness Reports 407H-200M-2 and 407H-500M-1 on Cabin heater
system and Engine compartment bleed air system. Operational checks performed
EFTA01120077
'PERFORM 300 HOUR / ANNNUAL INSPECTION ON FLITESTEP / FLOATSTEP KIT
25 Performed 300 hour / Annual inspection in accordance with Aeronautical
Accessories, Inc. Instructions for Continued Airworthiness Report AA-01162 on
Flitestep / Floatstep kit
'PERFORM ANNUAL INSPECTION ON HIGH VISIBILITY CREW DOOR KIT
26 Performed Annual inspection in accordance with Aeronautical Accessories, Inc.
instructions for Continued Airworthiness Report AA-01072 on High visibility crew
rtnnr Int
'PERFORM ANNUAL INSPECTION PRE-FLIGHT STEP / HANDLE
27 Performed Annual inspection in accordance with Aeronautical Accessories, Inc.
Instructions for Continued Airworthiness Report AA-00123 on Pre-flight step /
handle
'PERFORM ANNUAL INSPECTION ON FLODING MAINTENANCE STEP
28 Performed Annual inspection in accordance with Aeronautical Accessories, Inc.
Instructions for Continued Airworthiness Report AA-0126 on Folding maintenance
IPERFORMM 300 HOUR / ANNNUAL INSPECTION ON CROSSTUBES
29 Performed 300 hour / Annual inspection in accordance with Aeronautical
Accessories, Inc. instructions for Continued Airworthiness Report AA-00061 on
IPERF kiM4OUR / 6 MONTH INSPECTION ON SKID TUBES
30 Performed 100 hour / 6 month inspection in accordance with Aeronautical
Accessories, Inc. Instructions for Continued Airworthiness Report AA-01141 on Skid
tubes
'PERFORM ANNUAL INSPECTION ON TAIL ROTOR PEDAL LOCKOUT KIT
31 Performed Annual inspection in accordance with Aeronautical Accessories, Inc.
instructions for Continued Airworthiness Report AA-99032 on Tail rotor pedal
Inrkniit kit
'PERFORM ROUTINE INSPECTION IN ACCORDANCE WITH BRISTOL AEROSPACE LIMITED INSTRUCTIONS
32 Performed routine inspection in accordance with Bristol Aerospace Limited
Instructions for Continued Airworthiness Report ER 95008
'PERFORM 150 HOUR AND 300 HOUR / 12 MONTH ENGINE INSPECTIONS
uor and7 8
pe3000hroautiro/n
and12month engine inspections in accordance oRromllesdRo1y5Oceh2o5
c4 33 Maintenance Manual Section 72-00-00 With
Table 606. Operational and leak checks performed satisfactorily. [o
IPERF RM 600 H0UR/12 MONTH SERVICING REQUIREMENTS
34 Performed 600 hour / 12 month servicing requirements on Engine oil and CEFA
filter systems. Serviced engine oil system with oil; Mobil 254. Replaced CEFA oil
filter with new item p/n; 23066697. Servicing, filter replacement, operational
checks, and leak checks performed under Item No. 33
EFTA01120078
'COMPLY WITH FAA AD2011-15-51 EFFECTIVE NOVEMBER 14TH, 2011
35 Complied with FAA AD2011.15-51 Effective November 14th, 2011 (Hydraulic servo
assemblies) and BHT ASB407-11-96 Revision B Dated August 29th, 2011 (Clevis
Assembly - hydraulic servo assemblies, Part number 206.076.062-105 and 206-076-
062-107) in accordance with AD and ASB Instructions.
COMPLY WITH BHT ASB407-11-94 DATED FEBRUARY 8TH, 2011
36 Complied with BHT ASB407-11.94 Dated February 8th, 2011 (Main rotor mast 407-040-
038.101, -105, -109, -111, -111R, -111T, or -11111, Inspection of) in accordance with
ASP Instructions. Operational and leak check performed satisfactorily. Next due
compliance in 12 months.
(EME GENCY FLOATATION SYSTEM RESERVOIRS DUE RETIREMENT
37 Replaced emergency float system reservoirs with new items p/n; 1271762 s/n; 4353
and 4348 DOM; September 2011. Replaced fwd clamp for left hand reservoir with
new Item. Serviced reservoirs to; 3025 psi at 30 °C. Leak checks performed
satisfactorily. Work performed in accordance with BHT-407-MMS-1
'FORWARD RIGHT HAND FLOAT BAG COVER TORN
38 Replaced Forward Right hand float bag cover with new item p/n; 206-050-247-131 in
accordance with BHT-407-MMS-1
'CORROSION NOTED IN AREA OF OIL COOLER DRAIN
39 Performed repair of oil cooler deck drain in accordance with BHT-ALL-SPM and BHT-
ALL-SRM. Protective finish re-applied.
'AIRCRAFT MAIN BATTERY FAILS CAPACITY CHECK THREE 13) TIMES. REQUEST REPLACEMENT
40 Replaced aircraft main battery with new item p/n; RG-407 s/n; 40484086 in
accordance with BHT-407-MM Chapter 96 and Concorde Installation instructions.
Operational check performed satisfactorily.
'STARTER GENERATOR BRUSHES WORN
Replaced starter generator brushes with new items p/n; M2002-1 (x4) in accordance 41 with BHT-407-CR&0-V Chapter 96. Operational check performed satisfactorily.
'PITCH SHOCK CORDS EXCESSIVELY STRETCHED
42 Replaced pitch control spring shock cords with new items p/n; 407-001-116-101 (x2)
in accordance with BHT-407-MM Chapter 67
(TAIL ROTOR PITCH HORNS CORRODED BEYOND PERMISSIBLE LIMITATIONS
43 Replaced tail rotor pitch horns with new items p/n; 406-012-108-107 (x2) in
accordance with BI-IT-407-MM Chapters 64 and 67.
MAIN ROTOR BRAKE LININGS AND BOLTS WORN / DAMAGED. TO BE REPLACED
44 Replaced rotor brake linings and guide bolts with new items p/n; D0314-1 (x4) and
p/n; D0164-1 (x4) respectively in accordance with BHT-407-CR&O-V Chapter 63. Leak
and operational checks performed satisfactorily.
EFTA01120079
'AIR CONDITIONING DRIVE BELT WORN EXCESSIVELY
45 Replaced air conditioning system drive belt with new item p/n; 7270 in accordance
with Air Comm Corporation Service Manual 407EC-200M-2. Operational check
performed satisfactorily. Belt tension check required after 2 hours of operation.
'CORROSION ON LEFT HAND AUXILIARY FINLET ABOVE POSITION LIGHT
46 J.,Replaced left hand auxiliary fin due to excessive corrosion with new item p/n; 407-
023.003.105 s/n; BP258 in accordance with BHT-407-MM Chapter 53. Operational
checks performed satisfactorily.
'PAR CLE SEPARATOR CORRODED ON UPPER LEFT HAND SIDE
47 Mechanically removed corrosion to particle separator in accordance with BEIT-ALL-
SPM. Protective finish re-applied.
'ENGINE COWLING CORRODED ON UPPER SURFACE
48 Mechanically removed surface corrosion from affected area of engine cowling
exhaust cover panel in accordance with BHT-ALL-SPM. Protective finish re-applied.
'UPPER AND LOWER WIRE STRIKE KITS CORRODED
49 Mechanically removed corrosion on upper and lower wire strike blades in
accordance with BHT-ALL-SPM. Protective finish re-applied.
'ENGINE ACCESSORY GEARBOX CASING CORRODED AT 12 ° CLOCK POSITION
50 Performed repair to engine accessory gearbox at 12 o'clock position in accordance with Rolls-Royce 250-C47 Series Overhaul Manual Section 72-60-00
'LEFT HAND BOOST PUMP SWITCH INOPERATIVE
51 Replaced left hand fuel boot pump switch with new item p/n; 407-362-013-103 in
accordance with BHT-407-MM Chapters 28 and 96. Operational and leak checks
performed satisfactorily.
'COMPLY WITH BHT-ASB407-07-79 REV A DATED JUNE 7TH, 2011
52 Complied with BHT ASB407.07.79 Rev A Dated June 7th, 2011 (Freewheel aft seal 209-
340-265-103, Installation procedures improvement of and oil dam ring 406-040-547-
103, one time verification) in accordance with ASB Instructions. Operational and
leak checks performed satisfactorily.
"OPERATOR REQUESTS REPLACEMENT OF NUTPLATES (X2) ON PARTICLE SEPARATOR COWLING FOR EJECTOR COVER PLATES
53 Replaced nutpiates for particle separator exhaust cover plates with new items p/n;
SL211-3.1 (x2) in accordance with BHT-407-MM Chapter 71.
'PERFORM 1-5 FLIGHT HOUR SPECIAL INSPECTION ON M/R HUB MAST NUT AND M/R HUB LOWER CONE
54 Performed 1 - 5 flight hour special inspection in accordance with BI-IT-407-MM
Table 5-3 on Main rotor hub mast nut and Main rotor hub lower cone. No
movement noted.
EFTA01120080
'PERFORM 2 HOUR OF OPERATION TENSION CHECK ON AIR CONDITIONING SYSTEM DRIVE BELT
55 Performed 2 hours of operation tension check in accordance with Air Comm
Corporation Service Manual 407EC-200M-2 on Air conditioning system drive belt.
Total Parts and Outside Services $46,928.95
I
Consumables S250.00
Freight Charges 5905.00
Discount -$2,227.40
Sub-Total
TOTAL S45,856.55 0
$78,311.1O S32,454.55
EFTA01120081
📷 Images in this document (10 detected; 6 largest described)
AI-generated factual descriptions of embedded images (llava:13b). These are searchable across the corpus.
[Image 1] The image appears to be a document scan, specifically a table or list with various entries. The text is too small to read clearly, but it seems to be a structured list with columns and rows. There are no visible names, dates, places, or logos that can be discerned from this image. The document type is not identifiable without clearer text.
[Image 2] The image appears to be a photograph of a printed document, specifically a table or list with various entries. The text is too small to read clearly, but it seems to be a list of items or tasks with checkboxes next to each item. The document is printed on a piece of paper, and there are no visible names, dates, places, or logos that can be discerned from this image. The style of the document is ty
[Image 3] The image shows a document with a table of items or tasks, each with a checkbox next to it. The items are listed in a column on the left side of the document, and there are checkboxes next to each item. The document appears to be a form or a list of items to be checked off. There are no visible names, dates, places, or logos that can be described. The text is too small to read the specific details
[Image 4] The image appears to be a document with a table or list of items or tasks. The table has columns with headings such as "Task," "Date," "Time," and "Status." There are rows with entries that seem to be related to some sort of project or tasks, but the specific details are not clear due to the resolution and angle of the photograph. The document is likely a project management or task tracking sheet.
[Image 5] The image shows a document with a table of text, which appears to be a form or a list with various columns and rows. The text is too small to read clearly, and the content of the document is not discernible from this image. The document has a structured layout with headings and possibly checkboxes or other marking options, but the specific details are not legible.
[Image 6] The image shows a document that appears to be a form or a checklist with various sections and checkboxes. The form includes fields for "Date," "Time," "Name," "Title," "Address," "Phone," "Email," and "Comments." There are also checkboxes for "Yes" or "No" under headings such as "I have read and understand the terms and conditions," "I have read and understand the privacy policy," and "I have read