MO 5507/7/7
MO 5507/7/7
VIP Priorities:
• MC Gazebos sylvester
• MC Service gates w/10ft Colums (danny plus carpenter) it
• All service gates. New wood needed (Tunnel, Engineering & Heli)
• Jeffers roads — D am—
• Five palms bid & Franks electric? ..,
• Flagpole bid?
• Engineering doors P.0 • Steel buildings ,
• Paul Gandy cables swithces trench bid
• ro trench
• cement for hell gsj? .
• pebble beach seocnnd floor,
• grotto..
• gym. floors. layout.
• Internet. etc.
• gsj dock house. ce,
• jet ski docks..
• trees.?
See page 2
6/9/2019 8:30am White Table Notes
CONFIDENTIAL SDNY_GM_00332640
EFTA 00205366
EFTA01309340
Little Saint James
CONFIDENTIAL SDNYGM_00332641
EFTA_00205367
EFTA01309341
6/9/2019 8:30am White Table Notes
-Do not install GYM Doors
-Sylvester & Maurice to find help if needed
-Five Palms Completion date needed 7:30am 6/10/19 j
-Danny MC Columns for New Driveway. Gates should look like flagpole pool side gate.
-Gerry will do all Trash Runs at 3pm going forward everyday
-Anna to call Jeffers asap (Need answers 6/10/2019)
-What are black tubing on RIO Bld. (Need answers 7:30am 6/10/2019)
-Engineering Doors (Need answers 6/10/2019)
-Hire Outside Contractors for Big Projects & Building
-Pictures needed of every project from start to finish
-Phil arriving end of June
-Tiki Kitchen Counter top (Find local vendor for purchase) Conan
-Order Fly bags
-Close all Cabana doors if no guests. Cabana doors with "No view" should stay
closed
-Install Washers & Dryers in housekeeping first thing 7:30am 6/10/19
-Fix Master Bedroom Steam shower
-7:45am Michael & Jules 6/10/2019
-Michael first thing in the morning 6/10/19 cans for at GSJ Helipad.
-Bubbler (Barge) 4 Cement trucks from HM for GSJ Helipad
-Trenching Bid needed asap (Time Sensitive)
-Jules to work at Grotto
-Order Heavy Duty Wall bracket to hold 82" Samsung TV
-Dupson to spray Main Compound (Caterpillar infestation)
CONFIDENTIAL SDNY_GM_00332642
EFTA_00205368
EFTA01309342
VIP Priorities:
MC Gazbos....syNestet
MC Service gates w/10ft Colums (danny plus carpenter)
All service gates. New wood needed (Tunnel, Engineering & Hell)
Jeffers roads
Five palms bid & Franks electric?
Flagpole bid?
Engineering doors .
Steel buildings ,
Paul Gandy cables swithces trench bid A it
ro trench
cement for heli gsj? .
pebble beach seocnnd floor,
grotto..
gym. floors. layout..
internet. etc.
gsj dock house.
jet ski docks..
trees.?
<-1
lot)
CONFIDENTIAL SONv_GM_003326.43
EFTA_00205369
EFTA01309343
New LSJ-GSJ Mandatory Punchlist 5-17-19
2 3 4 smartsheet
an MANDATORY
LSJ/GSJ Punchlist Put:basing, Shipments & Visiting Vendors
SDNY_GM_00332644
Mold Remediation Schedule: Mobilize equipment to Tropical FL 615, sail
1 LSJ/GSJ Daphne & Anna Seth Ettinger - Restore
& More LLC 6/7 - EDA on SIT 6/11. Clear, pickup equipment 6/12 - Seth and crew
(2-3) arrive 6/12 - remediation begins 6/13. (5) areas on GSJ 1. Mike's
Room, 2. Living Room, 3. Office,4. Twin Bedroom. 5. Master Bedroom. _J
2 LSJ MC Kitchen Karyna & JE Banquette (2) areas on LSJ 7. Kitchen 2. Theater. Should be added - 3. Gym.
Project ON HOLD until the decorators come, per JE. Will review with
decorators for different ideas. 1--
3 Master Bedroom Karyna JE Pillow Should know more after our trip on June 3rd.
4 Emergency Room Anna & J E EKG Machine Order EKG Machine. JE to advise.
5 Theater Room Anna & JE Blackout Curtains Purchase Black blackout fabric for the curtains. No light should
penetrate from anywhere, Including the door openings. Awaiting quote
from TJ "Home Theater Marker' for Black/Blackout Curtains same
custom measurements as existing panels. Anna's confirmed New
measurements:12 Panels of 9ft Long (108in)
6 Housekeeping Anna Washers 4 Panels of 11ft Sin Long (135in), AJI 12 Panels are 4ft Wide (48in).WII
need 16 Panels in Black wlBlackout backing (5130).
Order 2 Samsung Washers: on STT 5/28 - cleared, off-loaded, awaiting
pickup for transport to LSJ. O
7 Housekeeping Anna Dryers Order 2 Samsung Dryers: on STT 5/28 - cleared, off-loaded. awaiting
pickup for transport to LSJ. 0
8 Gym Anna Flooded Gym flooded on 5/30. all equipment moved to R/0 Storage on 5/30.
Floor removal began 5/31/2019.
9 Sam's Place Anna Furniture Order Living room furniture & Kitchen Table
10 LSJ/GSJ Anna & Daphne Solar Lights Solar lights from China - departed from China 5/21 - 45 days to MA -
EDA FL 7/3.
11 LSJ/GSJ Anna & Daphne Sun Umbrellas Order 15 Cream Colored Sun Umbrellas. JE will choose.
12 Theater Room Anna & Daphne Drapes/Curtains Wrinkle out the Drapes/ Curtains in the Theater
13 LSJ Salt Pond Anna Fountain Light Order lighting for the Saltpond water fountain. Arnving to the Palm
Beach house on 5/30. Arriving on plane 6/3
14 LSJ Helipad Anna Medical Kit Purchase Medical items for Helipad Office
15 Chillax Room Anna Chillax Deep Clean Chillax room. Smells funny
Exported on Juno 9.2019 9 33 34 PM BOT Paw. 1 oi 18
EFTA_00205370
EFTA01309344
Intt!aUca) Date Order Date Projected Arrval sty: Date Ten Cemple.tor Dote Coraplet'on Date Dale
5/6/2019
5/17/2019
5117/2020
5/17/2021 6/1212019 6/13/2019
5/17/2022
5117/2019 5/17/2019 5/28/2019
5/17/2019 5/17/2019 928/2019
5/21/2019
5/17/2019
12/13/2018 12/20/2018 7/27/2019
5/17/2019
6/5/2019 5/25/2019
5/16/2020 5/23/2018 613/2019
5/16/2020 5/23/2018 6/3/2019
614/2019
Exported on .Arne 9.2019 9:33:34 PM BOT 6/4/2019
6/412019
Pape 20118
SONY _ GM_00332645
EFTA 0020537I
EFTA01309345
Who Items Heli pad and tunnel gates are installed and ready for wood skin.
17 Welder Michael & Custom
Welding - Terrance Philip Welding engineering and jurassic gates are due to be brought out to LSJ on
Wed., the 12th and installed. the wood skins will start as a carpenter
becomes available, likely mid week next week.
18 Five Palms Sylvester 8 Boniface Large Windows The two side windows are installed, just needing finish plaster. The
large opening door panels are being built.
19 Grotto Peter Elle
20 New Road Michael & Jeffers Road Project
21 LSJ Generator Room Michael & Contractors Hurricane Shutters Ismail scheduled to deliver and begin install by 5/31; will work around
weather. The installation will take around 10-14 work days.
22 GSJ Cottage Michael & Contractors Expert Builders Completion Date ? (6-8 weeks)
23 GSJ Helipad Peter Elie Helipad Forms and lighting installation complete by 5125. Concrete pour TBD.
JE advise *H" to be Bigger. JE to review 6/5
24 LSJ Tunnel Michael & Bill Terry Skin it Re-Skin the Tunnel. Quote from Allied. Waiting on Buck Steel.
Recommend going with Allied.
25 Wreckshop Michael & Bill Terry 40x60 JB reviewed and approved drawings 5/22. MG approval and sign off of
the plans will be sent to Buck Steel 5124.
26 HM Storage Michael & Contractors 00x60 Bld. ? Allied has provided estimate. Waiting on Buck Steel. Recommend going
with Allied. C
27 LSJ Fuel Room Reefco Vents Install Vents in Fuel storage room. Dave reduced initial quote by 4500;
ordered 5O4; EDA on STT by June 15th and will then schedule install.
28 Engineering Michael & Contractors Doors Install Engineering doors. John Bedminster has estimate fonhcoming.
29 GSJ Staff Cottage Jeffrey Boschulte Permits Staff Cottage - 5127 J8 submitted the CZM Minor Permit Application
Forms for the GSJ Cottage to EK and DKI to review the portions
already filled out; JB noted the portions he needs assistance filling
out/signing, along with a checklist of the items still needed to complete
the application. 5/28 EK completed the permit application, requested
the IRB tax clearance and property tax clearance letter, and asked JE
to sign as noted. EK win notify JB once tax clearance letters back; JB
off-island until 6/2 - on his return will submit the drawings and maps etc
to EK, who will submit the completed application on behalf of the owner. 0
30 GSJ Barn Jeffrey Boschulte Permits Permits: Bam - JB awaiting selection of supplier and specs.
31 GSJ Terrace Jeffrey Boschulte Permit Build 75 foot round terrace.
32 GSJ Pool Extension Jeffrey Boschulte Permit Extend current pool to 80 feet from 15 feet.
33 Waterfall (Tiki or Juggly
Park) Peter Elie Slab
34 Gym Michael & Contractors Doors Bid coming from John Bedminster
35 Flagpole Pool Michael & Contractors Shade Structure Waiting for three bids: John Bedminster, EB, Mr. Gumbs
36 Flagpole Pool Michael & Contractors Freezer JE advised not to order a freezer.
Exported on June 9 2019 9 33 34 PM 801 Page 3 01 18
SDNY GM 00332646 _ _
EFTA_00205372
EFTA01309346
, ,
t Projected Naval Tarrative • Cofaalelloa InitiaVon Dafe Order Date Still Datec Hate ' • • • .
05/28/19
05/21/19 5/24/2019
5/28/19
5/31/19 6/21/19
8/1/19
5/17/2019
5/17/2019
5/17/2019
5/17/2019
5/17/2019
5/17/2019
5/17/2019
5/17/2019
5/17/2019
5/17/2019
5/17/2019
5/17/2019
Expated on June 9. 2019 9:33:34 PM 801" Page 4 0118 <
F-
z Lu
z 101
SONY GM00332647 _ _
EFTA_00205373
EFTA01309347
'er r-rn I
No. Area Who Items Descnption
is 37 LSJ Tiki Hut Michael & Contractors Freezer Order Freezer for Tiki hut kitchen: on STT 5/28 - cleared, off-loaded,
awaiting pickup for transport to LSJ.
38 Dock GSJ Amy Dempsey Permits Under CZM review for permitting: 1. Temporary Barge ramp (GSJ
North), 2. Christmas Cove Service Dock, 3. GSJ Southern Dock
•• 39 Dock LSJ Amy Dempsey Permits The permit for the LSJ WAVE ATTENUATOR and Dock is currently
under review by CZM.
i. ao Christmas Cove
Moorings Patrick Moorings Request moorings for Christmas Cove
41 Old Generators Michael & Bill Terry Old Generators Sell old Generators: Bill Terry to coordinate sale of the old generators.
Rich to speak with BIN.
42 Flagpole Pool Michael & Contractors Shade Structure Shade structure is replacing need for awning.
43 Five Palms Franks Electric Electrical work to be done at Five Palms
44 Five Palms Peter Elie Concrete Need more direction from JE. He was not pleased with current layout.
45 48 GSJ RIO
GSJ New Dock Michael & Contractors
Michael & Jules 2nd R/0 Intake
Dock Expansion Bob Peterson coming 5/23 FL-
JE said stop work on 5/21
47 48 49 GSJ New Dock
LSJ/GSJ Cables
Permit Michael & Jules
Michael & Paul "Global
Tech"
Amy Dempsey Water Sport Ramp
Underwater Cable
Underwater Cable JE said stop work on 5/21
Nico Shaner and Paul Gandy arrive Sunday. June 2. AA Flight 1391
2:57PM. depart Tuesday. June 4, AA Flight 943 2:41PM. Monday 6/3
review the existing facilities, discuss the recent/previous improvements,
plans for both sides and thoughts on the project approach, etc.
ACOE has reviewed the permits; their comments were addressed by
LSJE: permit expected to be issued in the next 30-45 days. uu C u_
50 Heavy Machinery
Trencher Michael 3 estimates have been submitted to Rich. Mr. Pemberton (STX) owns
and operates a trenching company. Mr. Pemberton would like to
conduct a site visit to review the project prior to submitting a bid. He can
be available week of 6/3. His rental includes the trenching equipment
and an operator. 0
51 LSJ Library Michael Roofing & Trim
52 LSJ Tiki Hut Michael Kitchen Order Conan countertop for Tiki Hut Kitchen
53 LSJ MB Bath Shower Tiles Awaiting quote from John Bedminster, this project Involves new shower
hardware, plumbing, and tile work
54 LSJ Main Compound Sylvester & James Gazebo Build 2 Gazebos at the MC. Mockup design given to Sylvester by JE. 4ft
on each side of the centered 3ft wide door.
55 Tunnel Entrance Sylvester & James Tunnel Gate Materials needed to skin the gate frame
se LSJ Helipad Sylvester & James Heli Service Gate Materials needed to skin the gate frame
57 LSJ Dock Mike & Brian Bates Water Sport Dock Box Build Dock Box with Bench similar to Yacht interior. Brian working on
this. Should have better idea 5/31 of completion date.
Exported on June 9. 2019 9 33 34 PM 6O1 Page 5 or 18
SDNY_GM_00332648
EFTA01309348
5/10/2019 928/2019 pi.:74.0niu 'a Ty IEWSW
5128119
5/23/19
6/5/19
6/5/19
5/15/2019
5/17/2019
5/17/2019
5/17/2019
Extolled on June 9.2019 9:3134 PM BOT
Page 601 18 <
110
0
SONY GM00332649 _ _
EFTA_00205375
EFTA01309349
IS IS IZISISIRISISI2. 1IS IS IS
70 71 72 73 74 75 76 77 78 79 80 81 GSJ lld Terrace
LSJ/GSJ Tiki sheds
Barn ?
GSJ Terrace
Sam's Place
Holy Shlt Point
LSJ TlkiHut
Cabana 1
Flagpole Pool
GSJ GSJ Guest BR
GSJ Pool
Tiki Terrace
LSJ Dock
Tunnel Christmas Cove
Sam's Pleas
Main Compound
GSJ Entrance
Grotto Main Compound
Emergency Room
LSJ Island
GSJ Island Brian Bates
Brian Bates
Danny & Keshaun
Brian & Ron
Maurice & Boniface
Maurice Sylvester Maurice Sylvester 7
TJ & Oriole
TJ & Oriole
TJ & Oriole
TJ & Oriole
TJ & Oriole
TJ & Oriole
TJ & Oriole
TJ & Oriole
Maurice or Sylvester
Jermaine & Liston
Jermaine & Liston
Jermaine & Liston Wooden Furniture
Thatch Barn
Chandelier Bedroom Structure Coral Stone
Shower Tile
Kickplate Tiki Bar
Carpet
Wooden Steps
Brown Paint
Polyurethane Roof
Structure Bedroom
Theater Roof
Staircase Steps Ceiling Chest is complete. Lighting to be installed by 5125.
Order thatch to be installed after Hurricane Season. (70) roes ordered,
on STT 5122. Cleared. awaiting pick up from Tropical Shipping STT.
Supplier to be awarded
Repair Ceiling. Lighting socket needed
Build Dock structure same as LSJ
Maurice began tile work today 5/31.
Shower floor is not draining properly in Cabana 1
Install Kickplate
Fix Cabinet & Drawers
Cut Carpet to size. Carpet to long. Need to be centered under both
beds Demo and rebuild new steps. Steps to match existing stairs at the MC
Deck to be stained
Polyurethane Boardwalk
In progress. Repair holes on tunnel roof
Material to arrive 5/28; work to start 5128.
Paint after repairs are made
Top Coat
Paint steps in epoxy grey
Paint steps in white
Stain ceiling above the White Table Nernst WIFI
Fax Pending setup of Efax account
Emergency PA System Island wide system for intruders
Emergency PA System Island wide system for intruders
82 ChIllax Jermaine & Liston er TV Order 82" TV for Chinas Room and proper wall mount —5/29/19 •
Pricesmart will have the 82* Samsung in stock
83 Chillax
Exported on Juno 9.2019 9.33 34 PM BOT Jermaine & Liston Order a Heavy Duty Wall Bracket to hold the 821 Samsung TV in the
82" TV Wall mount Chillax Page 7o' 18 CD 0
SONY GM 00332650 _ _
EFTA_00205376
EFTA01309350
Initiation Date Order Date Projected Arrival Start Date Date Tentative Completion
Completion Date Date
5/25/19 5/17/2019
5/17/2019
5/17/2019
5/17/2019
6/5/2019
5/17/2019
5/17/2019
6/5/2019
6/5/2019
6/5/2019
5/17/2019
6/6/2019
5/17/2019
5/17/2019
5/17/2019
5/17/2019
5/17/2019
5/17/2019
5/17/2019
5/1712019
6/5/2019
5117/19
5/17/19
5/17/19 5/22/2019
5/23/19
5/23/19 5/24/19
5/16/19 5/23/19 6/9/19 6/7/19
6/9/2019
Exported on June a 2019 9:33:34 PM BOT Page 8 or 18 <
0
SONY GM00332651 _ _
EFTA_00205377
EFTA01309351
No. Area Who Items Description Completion date. 15-29-19 MI WM, Access Points and switches and
84 New WIN Swim Jerrnaine & Liston LSJ/GSJ WIFE currently waiting on 5 addition switches to handle the distribution of
existing phone services] 15-29-191 GSJ Will is In progress this week]
Camera setup at Chnstmas Cove— Pending Mike to order Yeti Solar
Jermaine & Liston Units and Panels as per email 5/24/19 (5r29/19 GSJ DOck Nest
86 GSJ Cameras Camera is active) Rio & suriesdne !aciaserelliME
Order Pump for Cistern 1 for LSJ to complete system. Tyler (JCH)
88 LSJ astern 1 Michael & JCH Cistern Pump placed the order for the pump 5/24. Production time is 6 weela - the
factory confirmed that to Tyler 5/28. EDA to production completion 7/5.
87 GSJ WO Michael & Gemini
Seawater Systems RIO Container EDA to Tropical FL 7/12. EDA on SIT 7/21 _J
On Island on GSJ
88 GSJ RIO parts Michael & Gemini
Seawater Systems RIO Parts On Island H
89 R/O Water Michael & Smiley Water Testing 5/24 Anna emailed last test results (3/2017).
Lighting & Electrical
90 Cabanas 1-4 Danny & Keshawn Dimmers Install Dimmers C
91 Flagpole Pool Danny & Keshawn Dimmers Dimmers not working properly
92 MC New Planter Danny & Keshawn MC Planter & Palm
Tree Lighting In progress
Add Lighting to Water Fountain. Ordered 5/23; scheduled to amve at
93 Tild Waterfall Anna, Danny & Keshawn Pond Fountain the PB house on Thursday 5/30. Can be shipped by Carluz once
package arrives at the house, or on the plane. 0
94 Flagpole Pool Danny & Keshawn Kitchen Run wires and plugs properly. Make hole in cabinets if needed. Plugs
and wires should not be seen
95 GSJ Peters Point Danny & Keshawn Solar Lights/Other Lighting facing Peters Point for Safety
96 Cabana 1 Danny & Keshawn Rope Light Test in place. JE advise that we order more. Brighter than what's
installed at the moment.
97 Master Bedroom Danny & Keshawn Wall Sconce Wall sconce does not come on around the Master. Timer to be set
6:30pm -yam ?
98 GYM Michael & Liston Equipment & Audio Wiring need to be done for GYM Equipment & Audio
99 Chilies Danny & Keshawn Phone Plug Replace or fix phoneflntemet plug in Chinas
100 Sam's Place Danny & Keshaun Bedroom Repair Ceiling. Lighting socket needed
Plumbing & Fteeto
101 GSJ Master BR Michael & Charlie Master Bath No Hot water
Exported on June 9.2019 9.33:34 PM BOT Page 901 18
SDNY_GM_00332652
EFTA_00205378
EFTA01309352
4810811011,12.983, tatter CothiilaUcni
• - • •
5/17/19 5/23/19
5/22/19 6/4/19 6/11/19 5/23/19
5/17/2019 5/24/2019 7/21/2019
5/172019
5/17/2019
5/17/2019
5/17/2019
5/17/2019
5/17/2019 5/23/2019
5/17/2019
5/17/2019
5/17/2019
5/17/2019
6/4/2019
6/4/2019
6/5/2019
5/17/2019
Exported on June 9. 2019 9:33:34 PM DOT Page 10 0119 <
z
SONY _ GM_00332653
EFTA_00205379
EFTA01309353
No. Ann Who Items Description Replace air handler for the Library. Dave ordered 5/27; current lead
102 Library Reefco Air Handler time 7-8 weeks plus transit time (4-5 days). Production completion date
plus transit time 7/26/2019. Dave to continue checking on the progress.
103 IT Server Room Reefco NC Unit Temp a/c installed. Board ordered. Waiting on schedule.
105 Cabana 1-4 Air
Conditioning Unit Reeko NC Unit Shipping next week and hopes to have by May 31st. Goal is to install
week of June 3rd. PM already on routine schedule for Cabana 4.
106 GSJ Reefco NC Unit PM already on routine schedule. Bedroom. Kitchen & Living Room
107 LSJ Laundry Reefer, NC Unit Housekeeping NC is not working
108 LSJ Landscaping Cnstobal & Fabian Irrigation Install irrigation for new palms
109 GSJ Stones Danny & Renol Stones Stones from GSJ to LSJ to create and fix all Stone walls
Chemicals & Order Pesticides & Fertilizer for all plants and palms: Dupson reviewed
inventory - requested only fertilizer and landscaping equipment.
110 LSJ / GSJ Landscaping Dupson & Daphne Landscaping Equipment Lawnmower Headquarters quote for Stihi and Silky equipment
approved 5/29 and order placed. SiteOne Landscape Supply for Seed
Starter 3 Mulch and 20-20-20 Fertilizer ordered 6/3. EDA to ship out to
Tropical FL 6/7.
111 Island Wide Landscapers Orange Vines Remove all Orange Vines from plants on Island. Main Compound &
Island wide. Orange vines will kill the plants
112 LSJ Main Compound Danny & Philimon Pillars Build 10h. Pillars by the MC new planter
Wrackahop & Heavy Machinery Operators
Expone0 on June 9. 2019 9 33 34 MA BOT Page 11 x1180
SDNY_GM_00332654
EFTA01309354
fiistrattoana fl a CdoP ret:on.CDMAte09r3 Clate ‘"Cat
5/17/2019
5/17/2019
5/17/2019
5/17/2019
6/4/2019
5/17/2019
5/17/2019
5/17/2019
6/5/2019
6/5/2019
Exported on Jane 9.2019 9:33:34 PM DOT
Page 12 of 18 <
z z
SONY GM_00332655 _
EFTA_0020538 I
EFTA01309355
oooo NpOO rtt
No. Area %/lino Items Descriptor%
113 HM Equipment Tap & Dale Quadsig
114 HM Equipment Tap & Dale Fuel Truck / Flatbed
115 HM Equipment Tap & Dale Electric Carts
116 HM Equipment Tap & Dale ProGator
117 HM Equipment Tap & Dale Roller
118 Old Heavy Machinery Tap & Jules Removal
119 GSJ Engineering Shed Jules & Buck Berm
120 JE Bike Tap Bike Handle
121 GSJ Hydroseeder Tap Hydroseeder
122 Polaris Tap Bike
123 GSJ Jules Trenching
124 LSJ TIld Hut Jules or Peter Tiki Parking
125 Wrecicshop Rychie Office
126 GSJ Water Front Patrick & Randy Sail Boat
127 Christmas Cove Patnck & Randy Boat debris We are working On the Quadskl, 1st - The ECU was not communicating
with the computer - we found an issue with a wire pulled out, now we
are communicating. The Initial tests on the Chassis wire harness and
components (Fan, Blowers Throttle Nipper, bilge ) are all working
properly. The Next thing we need to establish is the condition of the Clutch.
Your Mechanic mentioned he removed the Clutch cover, there are still
loose bolts that establish it has been worked on. There's no water time
and little land use - The clutch should not be worn out? The machine is
having the fluids replaced and get Is started to evaluate why your
mechanic was looking at the clutch!Along with a Battery -Exhaust
Muffler Rubber mount is broken in Half -The Muffler is loose connecting
to exhaust pipe - seal is damaged
RH side - Upper Sprocket seal/Cap Is missing - Tire Hub cap Is
missing -
Handle Bar assembly - Has been recalled - I sent that request in
Immediately - part are her to update the machine - No Charge to
customer -
The Air Intake Hose to Engine - was being squished flat - The hose is
mounted in the wrong location -The Fuel Tank seal Is Missing - rubber
seal for fuel pump assy -If things go well the machine could be done by
end of next week - If the clutch needs work add probably another week!
This information will all be on a report - Before we repair we will be
making contact for approval
Turn Fuel truck into Flatbed
The (3) 2019 Polaris Ranger EV units amved at vendor 5/23. Will be
sent for undercoating (Rust proofing process) 5/31.
John Deere does not manufacture electric progators.
Arrived on STT 5/22. Cleared, off-loaded, awaiting transport to LSJ.
MG will schedule barge to pick up directly from Tropical Shipping STT.
awaiting Barge
Create Berm to block LSJ view across from the R./0 Containers
Replace Bike handle
Axle to be purchased asap
Valve needed for Polaris bike
Trenching Area & Description needed
Create Parking & Driveway at LSJ Tiki Hut. JE to advise 6/5
Clean office immediately 6/5
Mete Barge & Weer Sports Mai
Remove damaged sail boat
Remove boat debris
Export?,] ea ]0' 23 33 PI! P.C)T Page 13 0118 _J <:_- C U_ O
SDNY_GM_00332656
EFTA01309356
42/2019 5/17/2019 5/17/2019 5/10/2019 6/11/2019
5/17/2019 5/17/2019 6/6/2019 6/6/2019 6/6/2019 6/52019 5/17/2019 6/4/2019 5/17/2019 5/17/2019 Exported on June 9.2019 9:33:34 PM BOT Page 14 of 18 _I < H z L. u 0 EC_ z 0 0
SONY GM_00332657 _
EFTA 00205353
EFTA01309357
No. nee Who Sterns
128 New Crew Boat Patrick & Randy Crew Boat
129 AYH / Big N Boscoe & David Fenders
130 - AYH/B10N Boscoe & David Cleats
131 AYHBIg N Boscoe & Robert Lemire Blankets
132 PR/ Blg N RelStni. & David PR Repairs
133 PR/ Big N Boscoe & David Nana
134 Nautica Boat - NC,
Tubes, StnJeture Carlos. Patrick & Randy NC
135 Sport's Boat Patrick & Randy
136 GYM Kevin, Garth, & Mike GYM
137 JE Dwell Carlos & Caribbean Auto
Mart aC
138 LSJ Suburban Carlos & Cliffs Auto
Repairs Accident DeBenetton Install Fenders: (4) fenders purchased from Blue Ocean Tackle Inc.
5/24. Production lead time is 10 weeks. EDA to production completion
8/2. Install Cleats at AYH Barge slip Cleats arrived with JEE plane 6/3
Metcalf: Blanket install on the exhaust is 90% complete. The overboard
discharge thru the hull must be made to match the system and two of
the flange blankets were too short and are being re-manufactured.
Weather permitting, still possibly Monday 6/10 for STT return.
The hydraulic engineers are due to inspect the boat 6/4. Should have a
diagnosis by 6/5. Weather permitting, still possibly Monday 6/10. Work
continues on the intake strainers and new cutouts in the hull were made
to support the new Flanders and pipe that was found to be necessary.
Corrosion ate the last ones. Paint is being applied in the favorable
weather. Per Boscoe 6/5 • I'm sorry, I don't have an answer as yet* He's
waiting on Bobby & Boddy's Contractor to give him answers on the
hydraulic. He will continue to call Bobby. Barge arrival home could be
between June 100-15th
Take Nana to Offshore to get the Engines Checked
Nautica delivered 5/16/19. Fiberglass modifications in progress on
starboard side. Jesus will start cutting tubes off on Saturday 6/8 to be
shipped off. requested estimate for bow thruster replacement (cg $3400
before shipping(just need okay from JEE and Rich to proceed.) this
project can be completed while boat is at Offshore by Island Rigging.
6/4 offshore scheduled maintenance replace both timing belts. sports
dropped off 830am.... 6/4 work completed at 130pm picked up by PC
6/4 Cleaning, Organizing & DEMO
Demo Flooring in the GYM Vetildee
Dealership diagnosed a leaking hose in the air conditioning system.
Hose ordered 5/29: EDA on STT 5 business days (6/5). A complete
service was performed on the Denali and the rear brake pads changed.
Carlos will schedule the hose install once the part arrives.
Insurance Coverage & Repairs to be made. Carlos awaiting estimate
from Cliff's Auto Repair - by 5131. Carts will take the vehicle to
Guardian 5/30 for adjuster's Inspection.
Pools & Power Wisho
Exported on Juno 9.2019 9,33:34 PM 8OT Page 15 of 18 C U-O
SDNY_GM_00332658
EFTA01309358
EFTA 002053R5
Irrtia:;ci Date Cite- Date Picjectei it'r:vat start not° entritivc, Corrp)et:c
Date Coriple:rCr, Da.',e Date
5/17/2019 5/17/2019 5/24/19
5/17/2019 .
4/23/2019 6/5/2019 5/17/2019 6/3/2019 5/17/2019 812/2019 6/10/2019
6/10/2019
05/18/19 06/20/19
6/4/19 6/4119 6/4/19
Expected on June 9, 2019 9:33:34 PM 807 Page 16 el 18 0 u_ 0
EFTA01309359
ea&
loes 1,(wx4, civz-`z
ko,4 kom larecb.c.fe scopr..T„
®50 solo., ticakts 61", 653 Yb...c)--
2) atAA-toits
pakk. LILL,
4,„„,,, .14,4;k kx.1 ()Lk& (eats.
hewa,,, I kooks )ors
rYlrriC
Lle...iii.,,;(katr.,__ , io.hi loca111
axe paiy4 14.4,.,;it ,1116)....ract. elt.o.A.;.,s,) ?).,...1-104,— e,v, Rko...t,, di, -F
ait tax s6Je5...,
ror Gcm "To-oloveow
-51 -Settt,,;(e.NA4/, ‘
-171414 (t) MP( elAtftat' 16)(14
V-11[41. eitoki %I/4GS,
v- &kpd- Yak - bx& wi,u)oos - la142801...
L ens - da.
;Dol.( W.* 4;t4VALC, 4V 614?
rnort-'k2IIS
3 11,..4, qrl.oe.6- t. S3 VItAri PAry,
our
0;) No.ket.. dts;
- Lbw ,45T".cey....,2}D Pla
DuL itzul
ricor roc-62 ,
curet 4A)
54,1,se Coralto
I, 'FP CaSJ
\ic.,.3 Dive. &64yruhrik
ip( sra./
-
AIVIEI~ to Gs.5 Cdtp, 64+0 t'nwaye)
.AA4.10 ,4k+r. ivdta, 6,S.S
'Pt OfCIVIA" .
4,10,A It( RA 5110 ,56- t C4\ ali"
CONFIDENTIAL SDNY_GM_00332660
EFTA_00205386
EFTA01309360
name
date project
Rederit I a A `,///z(-?e,tks
tasks
_..
Tx 1 -kaa ,
(,3si
0 •4•Neas-..L.
O(Q,..r•scc,_ , sSySr
Lsn- •
!
-••••• 4,•••••• S. - •
--1••• 142.-
• ,
12,6e
n
•••••••
LJRW ,
CAA:,
If ers
•-ra • nue,C, f
CONFIDENTIAL SDNY_GM_0033266,
EFTA_00203387
EFTA01309361
name
date
tasks project
?re.seir'r F,1
CONFIDENTIAL SONY_GM_00332662
EFTA 01205388
EFTA01309362
SIM Bailaii______ MIMI= TRA
ENGINEERING • EQUIPMENT kills Sheridan Caribbean Motod
__Ilkcien
ENGINEERING - EQUIPMENT Broken tractors Sheridan Caribbean Motoring
MARINE. BOATS Broken boats Randy/Patrick Offshore Marine
MARINE Nadia - rotten wood on floor and mkiship entrance Carlos Mil Painters
MARINE - HAVOC* Utde C- needs nine engines Rarely/Pabick Offshore Marine
GS1 - SOLAR FARM Dad Soar batteries Mike Glidden Pro Solar
No Quonset hut Starting lith January. Max AS weeks barring no
GS1• BACK OF THE HOUSE DPNR issues Expert Builders 2/15/2019
No RO Buikling/Generator bunker: Need an Architect for —ff.
plumbIng/dectrical drawings for RO system design. This we
G51- BACK OF THE HOUSE causes changes to layout inside budding drawn. Kyle
GS1Staff Cottage and Bedroom Addition: Tile is being laid, siding
GU- STAFF COTTAGE Ito start roof Instillation in progress window door Install Kyle 1PK Development 2/U2019
LS1- GROTTO Stairs and Grotto Sun Louvers: EB pricing received. Was Mid to
put them off and sun louver company wig do this? El an still do
this If green light Is given. It will be 2 weeks iron. start date. Kyle Builders
III • FIVE PALMS Five Palms Windows and Doors Reviewing Pit bid on 7th
January. Eli has missing scope off verbal, so sent detailed scope
for odds". Kyle 1PK Development/Expert Builders
151- FIVE PALMS Five Palms dome Kyle Samson Builders
L51• FIVE PALMS Ave Palms *Harks' Mike Glidden
LSI- GYM Gym doors to he nmilaced ,Kyle EGS
(Si- RO RO still not working property: Seawater Intake pump 151 Mike Gidden Gent Seawater Systems
1.51-MECHANICAL BUILDING ;wintering doorsstlft not even dervered — Kele Tayki 'Cotton II Ridley
(Si- ELECTRICAL Rusted Lights Mike Gidden
LSI • LANDSCAPING No solar lets Anna Innovei
dons CRS
151-MAINCOMPOUND Cabana 3 Inoperablm The back up and pipes repaired. Awaking
arched dates olds, Mooring compeer (2 weeks horn arrival of
Rood% company(. Kyle JPK DevelopmentASIE
LSI - MAIN COMPOUND
LS/- MAIN COMPOUND Cabana de redo? Kyle JPK Development?
Ogles bath Kyle
1.51- MAIN COMPOUND Cabana and albs Floor= MP has been contacted. PK and AHF
to dscuss pricing for Insurance. Kyle PK/AHF
LS1- MAIN COMPOUND Chain Tray Ceiling Kyle
LS1-TIC HOUSE lid Idtchentille samples awaiting approval, kitchen demi:Mettle
Is next step, then cabinets. etc. MR ISLE 1/25/2019
Gil -71K1 HOUSE Big Mk Brian to finish deck 2 days, roof starting (leaves 3.5
weeks for roof Install and finishes Kyle Brian Bates 1/31/2019
LS1- OFFICE PAVILION Office Pavilion roof material not ordered: Awaiting BWC Sub-
proposal. Pokey on site 7th January 9am to review. (4.5 weeks
each roof). BWC on site 7th January 11 am to review. Kyle PK/Augustus Hemy/BWC uu 0 w
SDNY_GM_00332663
EFTA01309363
W- MAIN COMPOUND MGR roof material not ordered: Awaiting BWC Sub-proposal.
Pokey on site 7th January 9am to review. (4.5 weeks each roof).
EIWC on site 7th January 11 am to review. Kyle AL/Augustus Henry/BWC
LSI - MAIN COMPOUND Cabana 4 rook Awaiting BWC Sub-ProPosal. Pokey on site 7th
January 9am to review. MS weeks each roof). BWC on site 7th
January 11 am to review. Kyle SPIC/Augustus Nenry/BWC
ENGINEERING-EQUIPMENT Dump truck Shaklee
ENGINEERING • EQUIPMENT Fuel truck Sheridan
ENGINEERING-EQUIPMENT Flatbed Sheridan
ENGINEERING. EQUIPMENT Trendier Sheldon
GSI • GENERATORS Generators not yet online Mike Geddes
GO -SEPTIC Septic not yet connected Mils Glidden San Jan eolailla
GM • RO RO dawned end cannery 2019 Mike Glkiden Gemini Seawater Systens
GO - RO Pumps: interconnectinliddeg.Perear end end conduks,
power to the seawater pump station and the andawIng of the
container. Mike Glidden Gent Seawater Systems
W -TERMINAL FROM'' Pumps not working Mae Glidden
LW - TECHNOLOGY No Nibble WWI or Internet Outsourced Jennies VITA/2Guysigert)7
GM - TECHNOUDGT No Reliable WWI or hitt Mt Outsourced illinaille IVIMAGUYS (Ear)?
LSJ - PEBBLE BEACH Pebble beach not poured:To begin next week on rebar footing
and pour for FM. Then stone wall and roof schedule dependent
on wall. 8 weeks tentative finish. K/440DNYTNN WE 3/8/2019
W• ROADS Roads not started: Jeffers 2 Roads -Jeffers to confirm schedule.
Tentative start date 14th January— lifters in discussion with
lawyers cot:edit. Kye Eason Jeffers
LSI- MAINCOMPOUND Master shower Oft
(Si. LANDSCAPING Palm trees- need start data EMPean Meyer's Turf& landscape Nursery
Lel - *DMUS Staffing VIER
LSI- FLAGPOLE POOL CouMertopc Nide:lien company to came down Kyle
(Si- MAIN COMPOUND Cabanas 1-4 Vanities III. kitchen company towns doss Kyle
GS!- STAFF0317AG( Furniture for Staff Cottage JE/Tarles
W- MAIN COMIVUWO Wardrcbes for ii Cabanas and Carpets for Oaks JOKaryna Stark Carpet
MICHELLE'S TRANSPORT Big N repels Roscoe Marina Del Rey PR
W- MKNANICAL BUILDING Engineering building fixed Kyle
Gil- MECHANICAL BUILDING Enertmaing building new one but Kyle Med Steel
ENGINEERING-EQUIPMENT Carts Sheridan Palmetto Motorsports
(Si - lANDSCATING Landscape equipment Denson
LSJ - IANDSCAPING Forster and apropos Dotson Site One LandsCajat
GO - COCKS Docks constructks Kyle
151 • DOCK Dock • NE Kyle American Expert
LS' • RO Cables to be run: Installation and termination of the fiber op&
:cable between the RO plant and the seawater pump station. Mike Glidden Gemini Seawater Systems _J p 11.1 CD O 0
SDNY_GM_00332664
EFTA01309364
Conduit Bank LSJ - Seawater and fiber • started: WAPA Switches
LSI - ELECTRICAL to be purchased Mike Glidden
1.51- MAIN COMPOUND Stone Wall to be built Schedule and budget established -starting
10th January Kyle 'Danny 3/29/2019 151- MAIN COMPOUND MaM COMpound pool awnings to be put up_ Kyle Sylvester
Abort° be run Mice Glidden
MARINE /at skh Rendy/fratdck Shaklee
MARINE Boat fliers RandY/Patrkk South Pori* Trailers
Water trailers Mike Glidden AR Attadmiants
151- MAIN COMPOUND Shower dles to be redone Kyle PK Development
LSI- IANDSCAPING Pergola waterfall to be poured and shelter built : Need to
establish layout of post, then our sbb (with post haw-outs) -
erect post and Kyk
LSI - LANDSCAPING Nursery steps to be Axed KyM INC
LSI • MAIN COMPOUND Cabanas curtelns Alberto Pinto 1/18/20/5IS1 - MAIN COMPOUND Kitchen banquette Custom Canvas 151• MAIN COMPOUND Cabanas Bed Netting Oatom Canvas <
CD
u_
0
SDNY GM 00332665 _
EFTA_0020539 I
EFTA01309365
@" 64静 堑!, 扣d~山
CONF一DENTIAL SONY GM 00332666
EElA00205392
EFTA01309366
en NpOO LC
! 11. MEMO
MinagMaltia EIMINEERING•IAUIPMENT
Broken
kills
Sheridan
Cai00nn
Motoring ENGINEERING
-EQUIPMENT
Broken
tractors
Shidden
Caribbean
Motoring MARINE
-BOATS
Broken
boats
Randy/Pa
idc
Offshoot
Marine MARINE
Nougat
• rotten
wood
on
floor
and
nidihipenerance
Curbs
PI
Painters WANE
• NAUTICA
Little
C - needs
new
enignes
Raretrintrick
Onshore
Marine GS1
• SOLAR
FARM
Deed
Solar
batteries
Mike
WM
Pro
Solar GSI
• BACK
Of
THE
HOUSE
No
Quonset
hut
Starting
14th
January.
Max
45
weeks
boning
no DPNR
Issues
Kyle
Expert
Builders
2/13/2019 tifil
• BACK
Of
THE
HOUSE
No
RO
sollealfGenerator
bunker:
Need
an
Architect
for plumbing/Salad
drawings
for
RO
system
design
Th
is
will causes
changes
to
layout
Inside
Mang
drawn-
Kyle GS!
- STAFF
COTTAGE
651
Staff
Cottage
and
Bedroom
Addition:
Tile
is
being
laid,
siding to
start,
roof
last:Nadal
in
progniss,
window
door
install
Kyle
Inc
Development
2/1/
20
13 LSI-GROTTO
Stairs
and
Grotto
Sun
Lateen:
Ell
pricing
received.
Was
told
to put
them
off
and
sun
louver
company
will
do
this?
CB
an
still
do this
if
light
is
(ven.
It
will
be
2 weeks
from
sten
date.
Kyle
Expert
Builders IS)-
FIVE
PALMS
green Five
Palms
Windows
and
Doors:
FtrOewing
OK
bid
on
7th January.
CB
has
missing
scope
off
verbal,
so
sent
detailed
scope for
pal%
Kyle
n
Development/Exnert
Buodors LSI
-FIVE
PAWS
Ave
Palms
dome
Klee
Samson
Builders LSI-
AVE
PALMS
FivePalms
*Ma
— Mike
Glidden LSI
•GYM
Gym
doors
to
be
mixed
Kyle
EGS LSI-
RO
RO
still
not
norldiaarNierir
Senna
Intakeptimp
LSI
Mike
Glidden
Gamed
Seawater
Systems LSI-MECHANICAL
BUILDING
Engineering
doorsill
not
even
dawned
Kyle
Taylor,
Cotton
&
Ridley LW
ELECTRICAL
Rusted
Usher
IMce
Glidden LW
- LUIDSCAPING
No
solarAlits
Anna
Montan
(0IMA) Cabana
3 Inoperable:
Tile
back
up
and
pipes
repaired.
Awaitingarrival
dates
of
the
flooring
company
(1
weeks
from
arrival
ofGoofing
company1.
!Kyle
JPK
Develamentfisfr III
-MAIN
COMPOUND LW
- MAN
COMPOUND
Cabana
the redo?
Kyle
la
Development? LSI
• MINI
COMPOUND
Oenbath
Kyle IS1-
MAIN
COMPOUND
Cabana
and
ChM
floors:
AHf
has
been
contacted.
RIK
and
MN to
discuss
pridng
for
Insurance.
V
°
JPIUMIF IS1
• MAIN
COMPOUND
Chile:Tray
Ceiling
Kyle LSI
-TIM
HOUSE
Old
kitchenlb
samples
mid%
approval,
kitchen
demo
'd,
ilk Is
next
step,
Men
cabinets,
etc.
Kyle
WE
1/15/2019 GE4•TIKI
NOISE
Big
TIM
Brian
to
finish
deck
2 days,
roof
starting
(Imes
33 weeks
for
roof
Instal
and
finishes
Kyle
Brian
Bates
IMAMS ISJ•
OFRCE
PAV1UON
Office
Pavillon
roof
material
not
ordered:
Awaiting
BWC
Sub. Proposal.
Pokey
on
site
7th
January
9am
to
review.
(4.5
weeks each
roof).
BWC
on
site
7th
Januar/liens
to
review.
Kyle
JPKiAugUStut
Henry/BWC
_J z LU C U_ z O
SDNY_GM_00332667
EFTA01309367
LSI
- MAIN
COMPOUND
hiflit
roof
material
not
ordered:
Awaiting
MC
Sub
-proposal. Pokey
on
site
7th
January
9am
to
review.
(4.5
weeks
each
roof). BWC
on
site
7th
January
11
am
to
review.
Kyle
PX/Atewstus
Nsaiy/BWC L.S1-
MAIN
COMPOUND
Cabana
4 roof.
Awaking
!MC
Sub
proposal.
Pokey
on
site
7th January
9am
to
review.
DLS
weeks
each
rail
BWCon
site
7th January
11
am
to
review.
Eta
WIC/Augustus
Fienty/BWC ENGINEERING
-EQUIPMENT
Dump
tract
Sheridan ENGINEERING
-EQUIPMENT
Fuel
buck
Sheridan ENGINEERING
-EQUIPMENT
Flat
bed
madden ENGINEERING
-EQUIPMENT
Wet
Sheridan GS1
• GENERATORS
Generate('
'satin
online
Mike
Walden GSI
- SEPTIC
Sapde
not
yet
connected
Mike
Glidden
San
Jan
Botanic' Gil
- RO
Reg
delivered
end
oflanuary
2019
Mike
Glidden
Gemini
Seawater
Systems GSJI•
RO
Pumpsl
Intercom/a%
0104
newer
and
control
conduit', power
to
the
seawater
pump
Haden
and
the
anchoring
of
the container.
Mike
Glidden
Gemini
Seawater
Systems (S
i -TERMINAL
FACIUTY
Pumps
not
waiting
Mike
Glidden III
-TECHNOLOGY
No
Reliable
YAFI
or
Internet
Outrouroed
/ermine
reiViGtlys
(WI)? GSJ
-TECHNOLOGY
No
Reliable
Varier
Internet
Outwitted
Jennie*
VIWIGull
(Fad)7 LSJ
- PEBBLE
BEACH
Pebble
bad)
not
poured:
To
begin
next
week
on
rebar
footing and
pour
for
FIN.
Then
stone
wall
and
roof
schedule
dependent on
wall
II weeks
tentative
fintslt
ilfTWOLIPsoll
LSJE —
..... LSI
- ROADS
Roads
not
starts*
Jeffers
2 Roads
• offers
to
confirm
sciwdule. Tentative
start
date
lath
January.
Jeffers
in
discussion
with lawyers
on
aedif
•
Kyle
Eason
Jeffs ISJ
• MAIN
COMPOUND
Master
skews
Kyle LSI-
LANDSCAPING
Palatines
- need
start
date
'Dupson
Meyer's
Turf
&
Landscape
Nursery LSI
-ADMIN
Stating
NARA LSI
- RAGPOLE
POOL
Countertops
EL
kitChen
company
to
come
dam
Kyle LSI
- MAIN
COMPOUND
Cabanas
1.4Vanldet
Ft
kitchen
company
to
come
down
We GS1
- STAFF
COTTAGE
Furniture
for
Staff
Cottage
iffil•Pfla 131-
MAIN
COMPOUND
Wardrobes
for
all
Cabanas
and
Carpets
for
CMOs
NAOMI'
Stark
Carpet MICHEILES
TRANSPORT
Bit
N
repairs
Bosco,
Maine
Del
Rey
PR 1S1-
MECHANICAL
BUILDING
Enshwering
building
ibred GS/-
MECHANICAL
BUILDING
Engineering
building
new
one
bulk
Kyle
Miled
Steel ENGINEERING
- EQUIPMENT
Carts
Sheridan
Palmetto
Motorsmns I.Sl•
LANDSCAPING
Landscape
ecruipment
Oupson 1ST
-LANDSCAPING
Ferdlizer
and
q
n
Site
One
Iambs* GS'
- 0005
Docks
annum:don 151
-DOCK
Dock
- IPE
Kyle
Medan
Export 151
-RD
Cables
to
be
run:
Installation
and
termination
of
the
fiber
optic able
between
the
RO
plant
and
the
seawater
pump
station.
Mike
Glidden
Gemini
Seawater
Systems
uu 0 LL
SDNY_GM_00332668
EFTA01309368
LSI-
ELECTRICAL
Conduit
Bank
IS1
- Seawater
and
Fiber
- started:
WAPA
Switches to
be
purchased
Mike
Glidden _ LSI-
MAW
COMPOUND
Stone
WIN
to
be
built
Schedule
and
budget
established
-starting 10th
Janus
ey
Kyle
Danny
3/29/
19 Lll
- MAIN
COMPOUND
Maln
compound
pool
awnings
to
be
put
up
49
Sony fiber
to
baton
Mike
Glidden MARINE
let
skis
Randy/Pat:kit
Sheldon MARINE
Boat
trailers
fteerlY/Patridt
South
Florida
Tillers Water
trailers
Mike
Glidden
AM
Attachments LS•
MAIN
COMPOUND
Shower
Mesta
be
redone
Kyle
JPK
Development LSI-
LANDSCAPING
Pergola
waterfall
to
be
poured
and
shelter
built:
Need
to establish
layout
of
post,
then
our
slab
(MS
post
leave-out:I/
- erect
post
end
Kyle LSI
-1ANDSOSING
Norway
steps
to
be
Reed
Kyle
JPK
Development LSI
- MAIN
COMPOUND
Cabenes
curtains
Alberto
Pinto
1/*/
2019LSI
- MAIN
COMPOUND
ItIbthen
banquette
Custom
Canvas W-
MAIN
COMPOUND
Cabanas
Bed
Netting
01Stigni
Cantle
H z w LL
SDNY_GM_00332669
EF1'A_00205395
EFTA01309369
44 Amex.
At 1\4-.4 AMEX
legs
Vat A' L,23%,
0 56c. 1,0)Flav,
III Yha".12 "3/4'2.
1,-;6y,xy, ,
Mow bcdt
14a,tArt'co-4- lAsiniDoeis
vt-kys -4- "PokciA 1,otco estlxwtas.
va CiAb4alvte, 11O f.)
140ale_s Air Covic);lieners -1-httinseAvel,
r
grL(1,4
CONFIDENTIAL TUl
SONY_GM_00332670
EFTA 00205396
EFTA01309370
Jammu imam 4,A.ApsMMaggagaggIregansgtojs
`Sheradon Caribbean Motoring
ENGINEERING-EQUIPMENT Broken lulls
ENGINEERING-EQUIPMENT Broken tractors Sherklon Caribbean Motoring
MARINE-BOATS Broken boats Randy/Patrick Offshore Marine
MARINE Maude.- rotten wood on floor and midgdp entrance Corks BM Pettey:
MARINE - NAUTICA tilde C- needs new engines Randy/Patrick Offshore Marble
4351- SOLAR FARM Deed Solar Wearies Mike Glidden Pro Sobr
GU - BACKOF NE HOUSE No Quonset hut Starting 14th January. Max AS weeks barring no
OHM Issues Kyle &Pert Builders 2/15/2019
Gil • BACK OF THE HOUSE No RO Doildln8/GeMrator bunker: Need an Architect for
plumbing/electrical drawings for RO system design. TMs will
causes changes to layout Inside Madrid:awn. Kyle
151- STAFF COTTAGE G51 StyeCottage and Bedroom Addition*. Tile is being laid, siding
to start roof Insmilation In progress, window door install Kyle 1PK Development 2/1/20191
1.51-GROTTO Stairs and Grotto Sun Louvers: ES pridng received. Was told to
put them off and sun louver company will do this? Efl can still do
this If green light is given. It will be 2 weeks from start date. Kyle &pert Builders
LS1- FIVE PALMS Five Palms Windows and DOOM Reviewing PK bid on 7th
Annan% ES has missing scopeoff verbal, so sent detailed scope
for acidic Kyle JPK Development/DPert Bulkier;
LL- AVE PALMS Fite Palms dome Kyle Samson Builders
LSI • RVE PALMS Five Palms electrical MIke Glidden
LSI-GYM %radon:a to be aleced lryle • EGS
Ls,-RO RO still not working pronedy: Seawater intake pomp LSI Mike Glidden Gemini Seawater Systems
(51- MECIUNICAL BUIUNNG Enghwering doors still not even delivered Kyle Taylor Cotton & Ridley
IS1 -ELECTRICAL Rusted Lights Mike Glidden
IS/ - LANDSCAPING No solar lights Anna innovadons (CHINA)
111- MAIN COMPOUND Cabana 3 inoperable: Tile back up and pipes repaired. Awaiting
arrival dates of the flooring company ( 2 wade from aMval of
flooring company). Kyle JPK Develmwroent/LSM
IS% • MAIN COMPOUND Cabana tile redo? Kyle JPK Development?
I.5.1 MAIN COMPOUND Chiba bath Kyle
LSJ• MAIN COMPOUND
LS1- MAIN COMPOUND Cabana end Chiba *OM MN has been contacted. We and ANT
to dbans pricing for Insurance. Kyle JPII/NIF
Chiles Trey Ceding Kyle
1.51 - 1110 HOUSE TIN kfldeen: Tile samples awaiting approval, kitchen demo d, tie
is next step, then athinets, etc. Kyle ISA 1/25/2019
G51 • TIKI HOUSE Big Tad: Man to ankh deck 2 days, roof sorting (leaves 35
weeks for roof install and finishes Kyle Brian Bates 1/31/2019
Office Pavilion roof material not ordered: Awaiting BWC Sub-
proposal. Pokey on site 7th January gam to review. (4.5 weeks
each roof). BWC on site 7th January 11 am to review. I Kyle JPK/Augustus Henry/BWC
SONY_GM_003326 71
0 0
EFTA01309371
MBR roof material not ordered: Awaiting BWC Sub-proposai.
Pokey on site 7th January 9am to review. (4.5 weeks each roof).
15$- MAIN COMPOUND BWC on site 7th January 11 am to review. iKyle inamentus ii.m/awc
ISI - MAIN COMPOUND Cabana 4 roof: Malting BWC Sub-proposal. Pokey as site 7th
Januar/9am to review. (43 steels each roof). BWC on ske lth
January 11 am (preview. Kyle UPK/Augustus Henry/BWC
ENGINEERING - EQUIPMENT Dump truck Sheldon
ENGINEERING - EQUIPMENT Fuel truck Sheridan
ENGINEERING-EQUIPMENT Flatbed Sheldon
ENGINEERING-EQUIPMENT Trencher Sherkke
451-GENERATORS Generators not yet online Mike GRdMtt
G51- SEPIK Septic not yet connected lace Glidden San Jan Botanica
651-RO RO delivered end Warman/ 2019 Orne Glidden Gemini Seawater Systems
651 - RO Purlieu *Mercer/recline piping, power and control conduits,
power to the seawater pump station and the anchoring of the
container. Mike Glidden Genki Seawater Systems
(Si -TERMINAL FAcarry hanot wrens Mike Glidden
151-TECHNOLOGY No Reliable WIFI or Internet Outwitted lumens viYA/26urs RAW
65l• TECHNOLOGY NO Reliable WIR or Internet Outtourced Herein. VIYA/2GunNari)7
L51- PEBBLE BEACH Tebbe bath not Peat To bese next weak on rebar fooling
and pow for RN Then Rom wall end roof schedule dependent
on wall. 8 weeks tentative1RWL Iffie/OuPSoll WE 3/11/7019
'SI - ROADS -- Roads not started: Jeffers 2 Roads - Jolters w coneys schedule.
Tentative startdate ?AO Benham Milers in discussion wle
lawyers riellettlt. Kyle Eason laNeN
W- MAIN COMPOUND Master shower Kyle
LII - LANDSCAPING nab, toes- need aft date
L.51 • ADMIN Staffing
I.S1 - FLAGPOLE POOL ./4
Castettafa R.Iltdsen company to come dorm Kyle
LSI- MAIN COMPOUND Cabanas 1-4 Vane's: FL kitchen company to come dawn
GU -STAFF COTTAGE .S4
Furniture for Staff Cottage JE/Kuyna
I.S1 - MAIN COMPOUND Wardrobes focal Cabanas and Carpets for Chile 1E/Karyna Stark Carpet
MICHEUE5 TRANSPORT Ole N repirs BC•10:00 Manna Del Rey PR
Le -MECHANICAL BUILDING Engineering buildingfixed Kyle
GS1 - MECHANICAL BUILDING Engineering building new cee bunt Kyle Allied Steel
ENGINEERING - EQUIPMENT Cans Sheldon Palmetto Motorsports
(Si - LANDSCAPING Lands e*albeTnat Duman
LS/- IANDSCAPING Finlike and spraying Duman Site One landscape
651-DOCKS Docks constructran Kyle
1S1-DOCK Dock -1PE Arnerkan Export
LSI - RO Cables to be run: Installation and termination of the fiber optic
cable between the RO plant and the seawater pump station. Mike Glidden Gemini Seawater Systems
SDNY_GM_00332672
EFTA01309372
ISJ • ELECTRICAL Conduit Bank MI - Seawater and Fiber • started: WAPA Switches
to be purchased Mks Glidden
1.51 • MAIN COMPOUND Stone Wall to be built: Schedule and budget established - stetting
10th January Kyle Danny 3/29/2019
1.51 - MAIN COMPOUND Main be Kyle *Nester
compound pool awnings to put up
Rber to be run Mike Glidden
MARINE Jet slds Rade/Petrldr Sheri:Ion
MARINE goat trailers Randy/PaDick South Ronde Trailer{
Water trailers Mike GlIdclan MR AtIschwants
(Si- MAIN COMPOUND Shower Ulu to be redone Kyle Ja Development
IS- LANDSCAPING Pergola waterfsel tube poured and shelter bunt: Need to
establish layout of post. then our slab Keith post Nave-outs) -
erect postiand Kyle
151 - IANDSCAPING Nunety_steps to be Reed Kyle NIt Development
LSI - MAIN COMPOUND Cabanas curtains Alberto Pinto 1/19/2019
(Si- MAIN COMPOUND Kitchen banquette Custom Carnes
151- MAIN COMPOUND Cabanas Bed Netting Custom Canvas C u_
SDNY_GM_00332673
EFTA01309373
L TMkI N IMAM i wagemateSTART DATE If
ENGINEERING • EQUIPMENT Broken lulls SherIda, Caribbean Motoring
ENGINEERING - EQUIPMENT Broken anon Sheldon Caribbean Motoring
MARINE - BOATS Broken beats ftandy/Patride Offshore Marine
MARINE Neutka - rotten wood on floor and midship entrance Carlos BVI Painters
MARINE- NAUT/CA Utile C - needs new engines Randy/Patrick Offshore Maybe
CV- SOLAR FARM Dead Solar batteries Mike Glidden Pro Solar
GTd - BMX OF THE NOUSE No Quonset hut Starting 14th January, Max 4.5 weeks barring no
DPNR bsues Kyle -
Expert Builders 2/15/2019
GSJ -BACILOF THE HOUSE No RO BuildIng/Generator bunker: Need an Anhltect for
plumbing/electricaldrawings for RO system design. This will
causes changes to layout Inside building drawn. Kyle
GSJ-STAFF COTTAGE G51 Staff Cottage and Bedroom Addidon: Me Is being laid, siding
to start roof installation _htrrogress, window door instal Kyle Development 2/3/1019
L51 -GROTTO Stabs and Grotto Sun Louvers: EB pricing received. Was told to
put them offend sun lower company will do this? Ell an OM do
this If green light is given. It will be 2 weeks from start date- IJpK
Kyle Wert Builders
IS1- FIVE PALMS Five Palms Windows and Doom Reviewing PK bid on 7th
January. Eft has missing scope off verbal, so sentinelled scope
for prking. Kyle JPK Davebpment/Expert Bulk:hes
LS1- FIVE PALMS Five Palms dome Kyle Samson Widen
LSI - AVE PALMS Rae Paints electrkal Mike Glidden
W- GYM Ginn doors tote rsPbsed Kyle EGS
IS/ - RO - - ROstill not world:It p-ripe Seawater intake PumPla Mike Glidden Gemini Seawater Systems
lil- MECHAIIICAL BUILDING Engineering doors al not even delivered Kyle Taylor, Cotton & Ridley
IS) • FIECTRICAL Rusted Ilkda Mike Glidden
I.51- LANDSCAPING No solar lights Ama Innovations (CHINA)
I.S1 • MAIN COMPOUND Chem 3 inoperable: Tile back up and pipes repaired. Awaiting
entail dates of the Roaring company (2 weeks from arrival of
flooring company). Kyle n Development/WE
LSI - MAIN COMPOUND Cabana tie redo? Kyle JPK Development?
LSI • MAIN COMPOUND Cigna bath Kyle
(Si • MAIN COMPOUND Oben* and Odllax NOM AMP has beet contacted. JPK and ANC
t deans trials for Insurance. INANE
I.S1- MAIN COMPOUND _RN
Chill/taw Ceiling Kyle
LSI -TIKI HOUSE ru *sham TIle FlimPles waking approval, kitchen derno'd, le
knee/ step, then cabinets, etc. ITS LSJE 1/25/1019
GSJ -TIM HOUSE Big Mk Brian to ankh deck 2 days, roof starting (leaves 3.5
weeks format Instal and finishes Kyle Brien Bates 1/31/2029
LSI-OFFICE PAVILION Office PaAllon roof material not ordered: Awaiting BWC Sub-
proposal. Pokey on site 7th January
📷 Images in this document (70 detected; 6 largest described)
AI-generated factual descriptions of embedded images (llava:13b). These are searchable across the corpus.
[Image 1] The image shows a handwritten note on a piece of paper. The note contains a list of items or tasks, with some of the text crossed out, suggesting revisions or cancellations. There are also some annotations and corrections made with a pen. The note is titled "CONFIDENTIAL" at the top, indicating that the contents are meant to be kept secret. The handwriting is somewhat difficult to decipher due to
[Image 2] The image shows a document with a table and text. The table has columns with headings such as "Date," "Time," "Name," "Title," "Company," "Phone," "Email," and "Comments." The text at the bottom of the document is highlighted in orange and reads "CONFIDENTIAL." The visible text includes names, dates, and other information that is typically found in a professional or business context. The document
[Image 3] The image shows a document with a table and text. The table has columns with headings such as "Date," "Time," "Name," "Title," and "Description." There are rows of text under each heading, indicating a list of items or events. The document appears to be a schedule or a log of some sort, possibly related to meetings or events. The text is too small to read in detail, but the layout suggests it is a
[Image 4] The image shows a document with a table and text. The table has columns with headings such as "Date," "Time," "Name," "Title," "Company," "Address," "Phone," "Email," and "Comments." The text in the document is partially obscured by a red rectangle with the word "CONFIDENTIAL" written across it. The visible text includes names, dates, and other information typically found in a business or organiza
[Image 5] The image shows a document with a table and text. The table has columns with headings such as "Name," "Date," "Time," "Location," and "Description." The text in the document is redacted, with the word "CONFIDENTIAL" prominently displayed at the top. The visible text is obscured by a redacted line, making it impossible to read the content of the document. The document appears to be a form or report
[Image 6] The image shows a document with a table and text. The table has columns with headings such as "Date," "Time," "Name," "Title," "Company," "Phone," "Email," and "Address." The text at the bottom of the document is labeled "CONFIDENTIAL" and contains a paragraph of text, which is not fully visible due to the angle and resolution of the image. The visible text includes a date and a name, but the spec