RRP73 - Elysium
RRP73 - Elysium
Typical Elements of a Retrofit Project
Retrofit projects involve replacing or upgrading an existing building's energy
equipment and systems with new, more energy efficient, equipment and systems.
A typical retrofit includes four principal components:
New Equipment
New Controls
Integrated Design
Active Energy
Management
Deutsche Asset Description
Repair, replace and/or upgrade key energy consuming
equipment that drives lower energy consumption for the
same output Examples
. Heating, ventilation, and air-conditioning (HVAC)
upgrades
• High efficiency boilers and furnaces
. High efficiency lighting
• Heat recovery devices
A system applied to equipment that reduces energy Lighting sensors
usage by ensuring equipment is only running when - Variable speed drives on motors and pumps
needed . New building automation and HVAC controls
An engineering approach that addresses the combined Combining upgraded energy efficient equipment, air
impact of multiple replacements/upgrades of both sealing, moisture management, controlled ventilation,
equipment and control systems insulation, and solar control
Installation of software that continue to monitor and
manage the performance of the upgraded systems and
inform the relevant people when faults are identified ▪ Detect/predict building faults
. Identify further savings opportunities
• Report on energy usage outside of contractual limits
RREEF Retrofit Partners. L.P. For U.S. Person Clients of the U.S./Americas Key Client Partners Desk Only
t W.≥alth Manaci.,y, June 2014
CONFIDENTIAL - PURSUANT TO FED. R. CRIM. P. 6(e) DB-SDNY-0112789
CONFIDENTIAL SDNY_GM_00258973
EFTA01454586