RRP73 - Elysium
RRP73 - Elysium
Appendix B: Case Study #5: Theodor-Heuss-Allee -
Frankfurt, Germany
24 energy and water projects
Heating, Ventilating, and Air
Conditioning Upgrades
Electric Motors and Drives
Water and Sewer
Conservation Systems
Commissioning
Totals
2007 Baseline2
Percent of Baseline Projects'
Retrofit of CRAC with VFD and controls
AHU VFD Retrofit
EcoLab Conveyer Dishwasher (3)
RCx Optimization -
RCx Optimization -
RCx Optimization -
RCx Optimization -
RCx Optimization —
RCx Rescheduling
RCx Rescheduling
RCx Rescheduling Chiller Plant
Exhaust Systems
Filter Optimization
Heating Plant
Humidification (3)
- HVAC System (4)
— Lighting (2)
— Temperature (6) Projects
1
1
3 Energy
Savings
kWh Water
Savings
liters
375,804
583,697
28,602 313
19 5,175,722 1,525
24 6,163,824 1,838
11,207,163
55.00%
Projects in Progress
Does not include following projects not yet completed: Replacement of heating systems, (8) lighting improvements, and
(14) re-commissioning projects Building Data
Single Tenant Commercial Office
331,600 sgft.
Theodor-Heuss-Allee, Frankfurt,
Germany
See fool rote 1 on page 41
Project Data records and energy S water savings provided by CRES year ending 2012. Savings calculation validated by third party. Arup Engineering. Does not include following projects not
yet completed. Replacement of heating systems. (9) lighting improvements. and (14) re-commissioning projects
Utility Data provided from Environmental Management System for year ending 2012. Data verified by third party. ERM Certification and Verification Services
Deutsche Asset RREEF Retrofit Partners. L.P. For U.S. Person Clients of the U.S./Americas Key Client Partners Desk Only
t W.mith Mana;rt- June 2014
CONFIDENTIAL - PURSUANT TO FED. R. CRIM. P. 6(e)
CONFIDENTIAL SDNY_GM_00259006 DB-SDNY-0 112822
EFTA01454604