From: Stephanie Remington
From: Stephanie Remington
Sent: Sunday, January 27, 2019 2:59 PM
To:
Cc: Richard Kahn
Subject: Re: Progress Report (01/21/19 - 01/27/19)
Will find out
On Sun, Jan 27, 2019 at 9:52 AM J <[email protected]> wrote:
we have an small ro on gsj= i would like to know why it does not work ?I!
On Sun, Jan 27, 2019 at 2:35 PM Stephanie Remington wrote:
Thank you. Will address all.
Stephanie Remington
LSJE, LLC
=/div>
On Sun, 27 Jan 2019 at 08:51,1 <[email protected] <mailto:jeevacation@gmail=com» wrote:
gsj road=not a prioirity LSJ always a priority when i am not ther= gsj can be focused when i am on
island. . =C24> the rattling in air was in flagpole not chillax. . =C24> easy to give time off when i am on isl=nd. . that
should be considered. . .=C24> trades and timing seem to be out of whack *)=A0, sea grapes an example . when
the wall was delayed=C24> so the sea grapes should hve been. . transpl=aint turpentine trees. . barge needed ,
4,=A0 PRIORITY is main house area. .4>=A0 fix broken tiles. at parking. . cabanas. fhinsed and =nnfrastruce
refreshed derusted etc.
I have read the observat=ns and think there are many good points. . =C24> we will put togther a policy
book . lu=ches for all . a good idea. .
stc s=oudl have a walking talkie m every manager p=trick steph kyle . should have phones that are
charged and work.
we need to upgraade the internet and wifi. 4>=A0 this is not on the list but must be !
our boat= are not doing well so we should find a new replaacment
</=iv>
I want to see photos of work !! no r=ason five palm windows have not been ordered. this was five
we=ks ago. . espcelly sinve the direction was to replace EX=CTLY what was there
EFTA_R1_01843739
EFTA02627884
power to five palms. ? =il in generators gsj. . planting around tree , new soil =ext to tiki. . electrify
shade strucuture? =C24, steps just needed some black strips two inch wide =n their edges. . total mess . - . . pour
peb=le beach. . stage jeffers material? an= set dates
enginnering builidngs both temp on Isj and perm=nent on gsj. get temp structure to hou=e things on
gsj xmas cove. . . if necesary b=ilid with the containers. . and tents between . pu=ting conatiners on gsj , might
provide shelter and place to wo=k..
i will lay out sable palms when i arrive. = p new sofa for staff cottage. replace outdo=r Turn used
insdie for steph and patrick. - furn for mikes cot=age? . . need to give bran instrutctions fro shade house= .. tiki floors
for kitchen , NEED TO SEE proposalsQ=A0 ASAP it has been over a months since being prmatreuly destroyed. =br>
barge fenders for AYH. .
On Sun, Jan 27, 2019 at 1:23 PM Stephanie Remington rote:
Please note:=C2I,
Th=s is a summary of the week's focus, not a comprehension of all projects.
All Divisions. </=pan>Finish cleaning out all=division work spaces.
Carpentry.<=span> — Chillax bath soffit. Investigate knock — a/c (no =nock could be heard),
assess gate latch, fix kitchen door (better but needs more work), begin awning—=II FP Pool. Begin demo and order
materials — LSJ nursery retaining wall. Begin =nstall tiki ceiling — L51.
Electrical.=span style="color:black"> Rough-=n lights — LSJ Tiki. Electrical and completed install —
FP Pool awning. I know they were completing other plumbin= and electrical projects per Kyle or Mike. Need update on
those projects.
Paint division floor. Ambulance to GSJ for AC Maintenance. Emptied/covered large furniture
Cabana 4 (AC repairs involve cutting cement board — dusty work). Estimate w/ welder — su=port beams. Sheridan to G51
w Anna and St Thomas for parts and supplies — much to do w a=bulance maintenance per JE. Checked GSJ generator and
added oil.
Heavy Equipment. Move multiple barge loads. </=pan>Trench — Palms. Move and plant palms.
RO fiber trench fill (ongoing). Assist w move of counterto= rack. Assist landscaping w collapsed statue — nursery. Meant
to do =oncrete at RO Plant but labor and heavy equipment to G51 for road project.
2
EFTA_R1_01843740
EFTA02627885
Housekeeping.</=> Clean out RO Plant, Electrica=, Carpentry, Blue Beach, MC. Shampoo stained
rug from CostUless per Karyna (stain is discolored from previous attempts a= stain removal thus its original placement in
CostUless, will dispose).
. Cle=n overgrowth — tunnel roof. Fix collapsed statue — Nursery. F=nish prep of footings for
concrete pour — Pebble Beach. Move and plant palms. Be=in planting Bryan's Plants. Demo mirrors — chillax bath and
master bath=to prep for new install. Collect stones and line GSJ roa=s. Nicholas was painting shelves for rust but
incomplete b/c pulled w three other landscapers/masons=for priority of GSJ Road project.
Marine.=/span> Nautica back to BVI =ainters for repair, not to be used for crew runs, sell.
Sport's — new tubes. Little C to go in=for repairs next. Ferry service will continue. Search continues — new barge
and=crew boat. Patrick coordinated barge runs w Boscoe in Mike's absence.<=span>
=Complete painting of GSJ dock including adding sanded layer. Complete paint — GSJ tiki deck.
Paint Landscap=ng division. Begin paint- Painting division. Patched tunnel roof w filler over division spaces. <=span>
Pools. Assist Gemini as =eeded. Routine maintenance.
Repair Cabana 2. Complete Cabana 4. Ongoing maintenance to other units.
week=/b>:
Boschulte=/span> -<=pan style="color:black" lang="EN-US"> landscaping<=span>
Re=fco —=repairs and maintenance
Gemini - =/span>RO
JPK — GSJ
EB — GSJ
Grand Design - Countertop=
Danny - MC Pool Wall
Many thanks to all for all the hard work. =C24t.
3
EFTA_R1_01843741
EFTA02627886
</=ont>
Monday (Jan 21) - LSJE re=ognized federal holiday (MLK) - no workers
• Some crew pul=ed for GSJ road priority, slowed projects here but still accomplished
quite a bit and I believe road =roject is complete.
Mike was on vacation this week. Will be back Monday.
• Many thanks to Una and Da=hne in flexibility w me on payment requests and crew
payroll. Alerted by S=iley that Premium is almost out. This could be the reason the Premium pump=is taking a while to
begin pumping. Need to order first thing Monday.Q=A0
Daphne will assist w water order to GSJ (thank you)
Mike to coordinate trash removal first thing this coming week as well.=C24>
New cell and two iPads received (thank you).
</=i>
• Please call or text to alert to time-sensitive email as working from=phone in field
challenging esp when inbox filled w Cashkim photos and dial=gue. Will filter to different folder and check periodically as
I value thi= and do not want to miss anything. WhatsApp (Karyna uses this also) would =ork well for this kind of dialogue.
• Copying other division/p=oject leads so can add information I might have missed.
=lease note new work cell number: 340.514.4446.
Striving =o complete proposal for LSJE policy, re: staff/crew.
<=>Observations, Re: Operations
• Mission. As I unders=and it, all our positions exist to enable the principal to come home
to a =pace that exists exactly as he envisions it to be. He doesn't care abo=t process, only end results. Every project must
be prioritized toward this=outcome so he can have peace and quiet so he can think.
" "O=ganizational Drag." This is the common dynamic among compani=s where systems
of operation hinder the company's top performers' =roductivity. These areas need to be identified and addressed.
* G=als. Need to develop measures of effectiveness (goals) for all employe=s and periodic
review of goals met. This will help press us toward the mis=ion and the principal will be able to see quantitative and
qualitative res=Its.
• Incentive programs. Rather than clocking hours (which =ncourages "milking the clock"),
studies show incentives (rewardi=g goals met early with bonuses instead of raises, a catered "thank yo=" lunch, or
maybe a day off or early release if deadlines are m=t early) increase efficiency and productivity, providing more output
per d=IIar for the company.
Work-Life Balance. Across the b=ard studies show that companies gain more product
for their dollar when th=y encourage/require time off. Persons who consistently work more than 50 h=urs per week
accomplish no more than persons who work 35 hours per week. A=direct correlation exists between chronic overtime
4
EFTA_R1_01843742
EFTA02627887
and an inverse rate of =roduction, most often because that individual begins making more mistakes.=There are
anomalies to this rule and we all would like to think we are tha= person, but they are very rare.
• Work Environment.40=A0A direct correlation exists between perception of
support/happiness in w=rk environment and work performance. When people experience hostility/work=place sadism
(satisfaction gained by others' failures), efficiency, pr=ductivity, dependability diminishes. Instead of looking behind to
our fail=res, we need to press our eyes forward to how we will contribute and fill =aps to reach the finish line.
• Clarification. In order to im=rove my role efficiency, an assessment of operations
infrastru=ture would be helpful to me. I need help understanding better what everyon= does so I know how/who to lean
on for support. Would be helpful if I coul= meet with SIC so they can help me understand their role as it relates to =he
island. A short paragraph (preliminary to the meeting if elected) of ea=h person's position title and responsibilities as it
relates to island=operations would be helpful. Perhaps we can develop some flow charts. If d=sired I would be happy to
conduct a visioning meeting so we can set priori=ies, goals, deadlines, and see them through.
Stephanie Remington<=iv>LSJE, LLC
340.514.4446
=please note
The information contained in this communication is
=onfidential, may be attorney-client privileged, may
constitute inside i=formation, and is intended only for
the use of the addressee. It is the=property of
JEE
Unauthorized use, disclosure or copying of this
c=mmunication or any part thereof is strictly prohibited
and may be unlaw=ul. If you have received this
communication in error, please notify us =mmediately by
return e-mail or by e-mail to [email protected] <mailto:[email protected]> , and
destroy t=is communication and all copies thereof,
including all attachments. cop=right -all rights reserved
=C24k please note
The information contained in t=is communication is
confidential, may be attorney-client privileged, ma=
constitute inside information, and is intended only for
the use of =he addressee. It is the property of
JEE
Unauthorized use, disclosure=or copying of this
communication or any part thereof is strictly prohib=ted
and may be unlawful. If you have received this
communication in =rror, please notify us immediately by
5
EFTA_R1_01843743
EFTA02627888
return e-mail or by e-mail to [email protected]=m, and
destroy this communication and all copies thereof,
includ=ng all attachments. copyright -all rights reserved
Stephanie Remington
6
EFTA_R1_01843744
EFTA02627889
📷 Images in this document (6 detected)
AI-generated factual descriptions of embedded images (llava:13b). These are searchable across the corpus.
[Image 1] The image shows a document with text, which appears to be a list of instructions or reminders. The text is organized into bullet points, and the content seems to be related to work or business matters. There are no visible names, dates, places, or logos that can be discerned from the image. The document is not a photograph, and there are no people or objects that can be described. The text is the
[Image 2] The image shows a document with text, which appears to be a letter or a report. The text is written in English and discusses topics such as support, experience, and communication. There are also sections titled "Background Information" and "Conclusion," suggesting a structured format for the document. The text includes references to specific individuals and organizations, but the names and other i
[Image 3] The image appears to be a photograph of a document, specifically a letter or a report. The document contains text, which seems to be related to construction or building matters, as indicated by phrases such as "construction site," "building materials," and "construction project." There are also references to "safety," "inspection," and "compliance." The document includes a date and a recipient's n
[Image 4] The image appears to be a photograph of a printed document, specifically an email or letter. The document contains text that seems to be a conversation or correspondence between two individuals. The visible text includes names, dates, and a reference to a specific project or task. The document is printed on standard letter-sized paper, and the text is aligned to the left. The content of the docume
[Image 5] The image shows a document with text, which appears to be a list or a set of instructions. The text is too small to read clearly, but it seems to be a mix of bullet points and paragraphs. The document is not a photograph, but rather a scan or a digital image of a written text. There are no visible names, dates, places, or logos that can be discerned from this image. The content of the document is
[Image 6] The image appears to be a document scan, specifically a letter. The visible text includes the sender's name at the top, followed by a salutation and the recipient's name. The body of the letter discusses a topic, but the specific content is not fully visible due to the resolution of the image. The document is addressed to a person named "Mrs. Susan Smith." The date and other details are not clearl