Siskiyou redesign contract awarded 3

Ashland Daily Tidings (Ashland, OR — Wayback)

2002-11-10

Document text

--> --> Siskiyou redesign contract awarded Ashland Daily Tidings The final engineering design for the Siskiyou Boulevard redesign project has been awarded to Beaverton-based W&H Pacific, which estimated the design cost at $269,647. W&H will create drawings and specifications as it evaluates the recommendation from the recently completed Siskiyou Boulevard conceptual plan which suggests reducing travel lanes from five lanes to three lanes on the boulevard between Ashland Street and Walker Avenue. The group will look at changes to traffic flows on Gresham Street, Third Street, Lithia Way and the Main Street intersection. Priorities include traffic engineering and safety, pedestrian safety and landscaping. Construction is slated for spring 2002. Email your... Technical questions & comments to: WebMaster Daily Tidings editorial comments & questions to: Editor Visit our other Oregon Newspapers... | Albany Democrat-Herald | Ashland Daily Tidings | Corvallis Gazette-Times | | Lebanon Express | Newport News-Times | Springfield News | Cottage Grove Sentinel | Ashland Daily Tidings 1661 Siskiyou Blvd. Ashland, OR 97520 Telephone 541-482-3456 © Copyright 2001 Lee Northwest Publishing