White City lane changes - December 20, 2005

Mail Tribune (Medford, OR — Wayback)

2005-12-24

Document text

Oregon Road Conditions & Cams Email Story to a Friend December 20, 2005 Paul Gallagher of White City waits for a bus on Antelope Road east of Highway 62. This portion of Antelope was upgraded at a cost of $2.8 million last year. A project to widen a three-mile stretch west of the highway should be completed by October 2006. White City lane changes Antelope Road will be widened to as many as six lanes By DAMIAN MANN Mail Tribune A three-mile stretch of Antelope Road in White City will undergo a $5.1 million transformation over the next year. The county will widen the roadway through an industrial area to as many as six lanes in some sections in the most expensive undertaking since the White City Urban Renewal District was created in 1991. "It’s a huge project," said Dave Abbott, project manager for the Jackson County Economic and Special Development Department. Construction on Antelope Road, which is mostly two lanes now, will be undertaken from approximately 700 feet west of Table Rock Road to approximately 800 feet east of Agate Road. Advertisement The street will be widened to six lanes between Table Rock and Pacific Avenue (including turn lanes) and five lanes between Pacific and Seventh Street. The roadway will have four lanes from Seventh to Agate, and narrow down to three lanes east of Agate. Two new traffic lights will be installed at Agate and Table Rock. Existing ditches on either side of the roadway will be filled in and a new storm drain system will be installed. Last year, urban renewal upgraded a portion of Antelope to the east of Highway 62 at a cost of $2.8 million to make the road feel more like a boulevard with meandering sidewalks. So far, the county has spent $46 million on improvements in White City since the urban renewal district was created. The money was collected from property taxes throughout the county. While the project is primarily designed to ease traffic flow through this industrial area, next year will bring delays and slower traffic speeds as the area is turned into a construction zone. Abbott said one lane will be open almost all of the time the project is under way. The contractor, LTM Inc., will be required to maintain two open lanes of traffic during rush hours of 7 to 9 a.m. and 3 to 5 p.m. The project, which began at the end of November, should be completed by Halloween 2006. Bob Smith, spokesperson for Boise Cascade, which owns a plant in White City, said he welcomes the improvements on a route that has seen more traffic because of residential development. "Any improvement to the roadway to ease congestion when hauling product will be beneficial for us," he said. Reach reporter Damian Mann at 776-4476, or e-mail White City lane changes ">[email protected] . Mail Tribune Home  | Local News  | Sports  | Business  | Obituaries  | Life | Opinion AP News | Archives  |  Site Map  | Community  | Classified   Copyright © 1997-2005 Mail Tribune, Inc. All rights reserved. Privacy Policy | Terms & Conditions | Website Feedback www.bingo.com Home Security Systems Trunks, Footlocker dvd-r Distance Education Computer Security Ztech Media Hosting Sports Equipment Student Loans Online Pharmacy tcg student loan consolidation Online Casino Reviews Myspace Home Equity Loans Windermere Van Vleet Deep Muscle Stimulator Discount Hotel Reservations Southern Oregon Loans Online Casino News Online Bingo Entertainment Guide Salvia Divinorum Online Casino Advertisement s