TRIME-FM - Earth Observing Laboratory

Survival, Water, Medical Field Manuals

Military Manuals

Document text

TRIME-FM 


User Manual 
i a ee p 














- 
TRIME-FM 
` 





i 


x 


IMKO 


MICROMODULTECHNIK F GMBH 


Thank you for buying IMKO. 


Should you have any queries please don't hesitate to contact your local distributor or address directly 
to: 


IMKO Micromodultechnik GmbH 


Im Stoeck 2 

D-76275 Ettlingen 

Germany 

Phone: +49-7246-5921-0 
Fax: +49-7246-90856 
e-mail: [email protected] 
internet: http://www.imko.de 


as of April 15", 2001 


Table of contents 


1 TRIME-FM2 /-FM3 Field Measurement Device (Version P2 or P3) 3 
1.1 Functional Description 3 
1.1.1 Manual Operation 3 

1.1.2 Probe Connection 3 

1.1.3 Basic Alignment 3 

1.1.4 Display Functions / Error Messages 3 

1.1.5 Battery Operation 4 

1.1.6 Battery Charger 4 

1.1.7 External Power Supply 4 

1.1.8 Data Logger Operation 4 

1.1.9 PC-Connection via RS232 4 
1.1.10 Technical Data 5 

1.2 Probe Dimensions 6 
1.3 Preparation Rods 7 
1.4 Mounting of Spare Rods with O-ring Seals 8 

2 The TRIME-T3 Tube Access Probe 9 
2.1 Introduction 9 
2.2 Measuring Field 9 
2.3 Measuring experiences 10 
2.4 Summary 11 
Access Tubes and Augers 12 
Instructions for Access Tube Installation 13 

4.1 Fixing of the rubber bung 13 
4.2 Inserting T3 into the TECANAT tube 14 

5 Basic Alignment with the Calibration Set 15 
5.1 What is abasic alignment? 15 
5.1.1 | What are the benefits of the calibration set for the user? 15 

5.2 How to make the basic alignment? 16 
5.2.1... Preparation of the glass beads 16 
5.2.2 Basic alignment procedure 16 
EMV/EMI Precaution 18 

7 Instructions for Wiring 19 


7.1 Water tight connectors and cable confection for use with the environmental measurement 
system ENVIS 20 


8 Operating instructions ACS-series 21 


1 TRIME-FM2 /-FM3 Field Measurement Device 
(Version P2 or P3) 


1.1 Functional Description 


The TRIME-FM is a portable moisture measurement instrument, which has been developed for mobile 
field use. It can additionally be supplied with an external power supply. It is connectable to a data 
logger or a PC for automated data logging. 


1.1.1 Manual Operation 


The manual operation is very easy. Pressing the START-button switches on the TRIME-FM. Pressing 
the button once again, starts the measurement. The message “Measuring...“ disappears after about 10 
seconds and the measured values of the water content and the TDR level are displayed on the first two 
lines. The TDR level can be used to assess the electrical conductivity of the soil or material. The 
instrument switches off about three minutes after the last operation, in order to save battery power. 


1.1.2 Probe Connection 


There is a build-in non-volatile memory (EEPROM) inside the probe connector, where all calibration 
data is stored, e. g. cable length, probe geometry, and calibration coefficients. Therefore several 
probes can be used with the same TRIME-FM. It is possible to connect probes with different cable 
lengths and different calibration data according to the device type P2 or P3. The device type P3 allows 
only the usage of P3-probes and P2-probes can only be connected to P2-devices. Probes can only be 
used at the TRIME-FM, which they were (basic) calibrated with. To prevent confusion, each probe has 
a label with the serial number of the device, which it was calibrated with. 


To screw the probe connector on is only necessary if the instrument is exposed to the weather. For 
manual measurements with several probes, it is recommended not to screw on the coupling ring, in 
order to be easy on the thread. 


The insertion of the probes must be carried out very carefully in order to prevent air pockets around the 
rods or the access tube, if the tube probe is used. Therefore the insertion of the rod probes with the 
preparation rods is only recommended, if it is not possible to stick them in manually. Repeated 
insertion in the same holes is not recommended, too. The access tubes should be inserted with our 
auger equipment. Since the highest measuring sensitivity is directly around the rods or the access 
tube, the TRIME-FM would measure too low values, if there was an air gap. In water saturated soils 
the measured values would be too high. 


The probe rods must be inserted in the soil completely, because the probe measures along the whole 
length of the rods. 
1.1.3 Basic Alignment 


The basic alignment can be done without any connection to a PC and without the calibration program 
SMCAL. The TRIME-FM is set to the calibration mode by plugging the calibration connector. Please 
refer to the chapter “Basic alignment with the Calibration Set". 


A calibration for a specific material cannot be established by using the calibration connector. 


1.1.4 Display Functions / Error Messages 
The LC-display of the TRIME-FM has four lines with 20 characters each. 


Almost all messages, which can be displayed, are changeable, that means they can be translated to 
the desired language. The modification of the texts can be done by the program TRIMETXT. 


Generally, the third line is used to display status and error messages. It indicates, whether measuring 
is active or the battery is just being charged or discharged. Occurred errors are indicated with error 
number and address. 


Error numbers between 1 and 29 are internal errors, which are displayed without additional text. 


TDR may be defective | TDR electronic or probe cable defective 


31 TDR level not found TDR level searching lasted too long, may occur with bad signal quality 
due to conductive soil or material 


1.1.5 Battery Operation 





The internal chargeable battery has a capacity of 600 mAh, which allows about 300 measurements. 
This is only an approximate value and dependent on a lot of influences, like ambient temperature, 
pauses between the measurements, measured material and age of the battery. The measuring 
operation should be terminated, as soon as the error message “Battery is empty“ appears. 


If the battery capacity is not sufficient or battery operation is not desired, at all, an external battery or 
power supply may be connected via the RS232 connector. 
Attention: Charging is only allowed with the supplied ACS charger! 


1.1.6 Battery Charger 


The micro controlled charging method of the ACS charger guarantees an optimised battery lifetime. 


1. Regarding the battery lifetime the “discharging* mode is most favourable. It is started by pressing 
the yellow button. However, it is not harmful for the battery to use the “charging“ mode if the 
charging shall be carried out fast, i. e. in up to 4 hours. The “discharging* mode lasts between 6 
and 7 hours. 


The charger can remain connected as long as one likes. The battery can not be damaged by it. 


Please refer to the charger operating instructions on page 21. 


1.1.7 External Power Supply 


An external power supply (9..15V/300mA) can be connected via the RS232-cable. In this case the 
internal battery is disconnected and the instrument is supplied by the external power only. It doesn't 
switch off then, but remains on as along as the external voltage is connected. Therefore the data 
logger operation requires an external power supply. 


It is even possible to connect an external battery if the capacity of the internal battery is not sufficient. 


1.1.8 Data Logger Operation 


The TRIME-FM comes with an analogue output of 0..1V in order to make data logging with external 
devices possible. For this data logger operation the TRIME-FM should measure automatically. The 
cyclic measuring mode (mode C) can be set by the program TRIMESET, whereas the cycle time can 
be chosen. 


1.1.9 PC-Connection via RS232 


The TRIME-FM can be connected to a PC via the RS232 connector and the appropriate cable, in order 
to carry out data logging, changing the operating mode, or calibration. As long as the PC is connected 
the power-off automatic is disabled to prevent switching off. It is to be considered that the internal 
battery is discharged as long as the PC is connected. 


1.1.10 


Power supply: 
Supply current: 


Technical Data 


Resolution: 

Repeating accuracy: 
Measurement range 
Temperature range: 
Temperature caused value drift: 
Standard interface: 


Calibration: 


Case: 


7V..15V-DC, 600 mA/h battery capacity 

8mA standby 

200mA while 10..15sec. measuring time 

0,1% 

+0,3% 

0-100% 

-15°C...50°C, expanded temperature ranges on request! 
max. +0,5% 

analogue output 0..1V or 0(4)..20mA, RS232/V24, 
IMP232 MICRONET 

calibrated for mineral soils, 

but individually adaptable per software 
weatherproof, robust aluminium die-cast (IP65) 


The measuring accuracy and -range as well as the tolerable range of bulk electrical conductivity 


depends on the corresponding probe. 

























AGISTURE: 21,4% 
TOR-LEVEL: 64 
STATUS: 
BATTERY: 


Connector for 

- analogue cable 
- Calibration plug 
- battery charger 


Pin 1: Reserved 

Pin 2: Reserved 

Pin 3: Analog-Out 0..1V 
Pin 4: Analog-Out-0V 
Pin 5: SelfCal. 

Pin 6: R/T (IMP-Bus) 
Pin 7: COM (IMP-Bus) 


60 ol 


TRIME-FM 


front view 





MICROM ODS LTZCIINIK | GME 


Connectable probes for TRIME-FM2 


Coax cable 
Probe Probe Probe Probe 
P2G P2Z P2 P2D 
TTV 





Probe connector 


Connectable probes for TRIME-FM3 


= | Connector for 
id - external power supply Probe Probe Probe Tube Probe 
oto) | - RS232/V24 P3 P3Z P3S T3 
front view | Pin 1: +U (9V..15V-DC) 
| max. 250mA 
Pin 2: RxD 
|| Pin 3: 
ah \ 
Battery 
charger 
Å £ 
Sy 
of 
Sa 
i 
oO, 
I 
T 
A 








roi 
PR 





external 








battery 





AC-banana plugs Wz 








CaS 
































l box 






































AC-Connector 


MILL MM ILL 
IEE MILIEU IL TÅ MUT 
LIE IIE MMMM IL IL IL 
DUMM HH HH HM AIL ILL) 

















1.2 


2-Rod 
Probe 
P2Z 


u 
— 


Q 
CO 





160 





o 


Rod diameter: 6mm 


3-Rod 
Probe 
P3Z 


Oo 


— 





160 





o 


100 — 


Tanner 
arrangement 


Probe Dimensions 


2-Rod 
Probe 
P2G 





88 | 


40 





6 


Rod diameter: 6mm 


3-Rod 
Probe P3 


30 





160 











All pins can be replaced 


15 


115 


2-Rod Miniatur 
Probe Probe 
P2 P2D 
With screw 


2 


32— for optional 
tube extension 








oO 
LO + 
To) 
oO 
ooo 
LO CO rr 
Oo 
Different length: 50, 80, 100mm 


Rod diameter: 2,4mm 


Rod diameter: 3,5mm 


3-Rod 
Probe P3S 


30 


© 
wz 








—— 110 


© Pe 


Rod diameter: 3,5mm 





Ww for tube 


æg] extension 
— A 


1.3 Preparation Rods 





For the protection of the rod tips it is necessary to use the preparation rods for probe P2, P2Z, P2G 
and P3. A defect and blank rod is sensitive against electrostatic charge and can destroy the electronic! 


1.4 Mounting of Spare Rods with O-ring Seals 





4) put silicon grease to the threads of the rods 
(new spare rod are greased at works) 





5) screw the rods into the probe body 








3) push the seals to the basis of the borings 
where the threads begin 


IMKOy/ 


MICROMODULTECHNIK ¥ GMBH 


2 The TRIME-T3 Tube Access Probe 


2.1 Introduction 


The measuring of soil water content with Time Domain Reflectometry is now a well established 
method. However water content profiling is not possible with conventional TDR rod probes. The TRIME 
tube probe was developed for this reason. 


Since 1994 the TRIME-T3 has found numerous applications in earth and environmental sciences, 
fulfilling even the most exacting requirements. 
2.2 Measuring Field 


The effective penetration depth of the probe is about 15 cm with the highest sensitivity in the 
immediate vicinity of the access tube and decreases exponentially with distance. Figure 3 shows the 
electric field distribution of the probe and the approximate measuring volume. 


p 


<a Z p> 


effective measurement volume 





i 


Q 





1 
® 


1 














LJ equipotential lines aluminum plates 


Figure 1: Electric field distribution of the TRIME probe and approximate measuring volume. 


The elliptical measuring volume enables a higher representation to be achieved by several 
measurements rotating the probe after each measurement and calculating the mean value. 


The following experiment illustrates the high penetration depth of the measuring field: 


In a bucket of 50 cm diameter filled with water saturated glass beads a moisture of 44 vol.-% is 
measured. Measuring in a smaller bucket (see Fig. 3) would result in essentially lower measuring 
values due to an amount of air within the measured volume. 


saturated 

glass beads 

with water content 
of 40 % by vol. 


= 


smaller bucket 
reducing the 
measurement field 





measurement field 


plastic bucket 


Figure 2: Influence of a too small measuring volume on water content determination. 


IMKO y/ 


MICROMODULTECHNIK F GMBH 


Note that the necessity of a close contact between access tube and material is vital for reliable 
measurements and that the tubes should be installed by our recommended method. 


e For example at an assumed water content of 15 vol. % an air gap of 1 mm around the whole length 
of the tube would result in an underestimation of 1 - 2 vol. %. 


e Atawater content of 25 vol. % the error would be 5 vol.-%. 
e At very high water contents (50 vol. %) errors may reach 10 vol. %. 


e Inthe case of a water filled gap under conditions of saturation the gap error would be much smaller. 


— Problems may arise, however, in very inhomogeneous soils and when drilling under very dry 
conditions. For these soils other drilling methods are recommended (e. g. pre-boring with an 
Edelman auger, washing mud into the cavity around the tube). Losses in accuracy must then be 
accepted, and measurements immediately after installation are not recommended. 


— Problems can also arise in swelling and shrinking soils, since cracks develop especially along the 
access tubes. 
2.3 Measuring experiences 


The new TRIME technique was thoroughly tested in the field and compared both to neutron probe 
measurements and thermo gravimetrically determined values. 


Gravim. Water Content [Vol.-%] 





0 10 20 30 40 50 
TRIME Water Content [Vol.-%] 


Figure 3: Comparison of TRIME measurements and gravimetric water content determination for a clayey soil. 


Figures 5 and 6 show a comparison of water content determinations for a loess and for a heavy clay, 
made with a neutron probe (Wallingford), the TRIME-T3 probe, and the gravimetric method. In contrast 
to the neutron probe, which is not suitable for measurements near the surface due to radiation losses 
to the atmosphere, TRIME has no problem at all to measure directly at the soil surface. 


10 


IMKO y/ 


MICROMODULTECHNIK ¥ GMBH 


Water Content [Vol.-%] 


Neutron probe 





5 TRIME probe 
È Gravimetric 
Figure 4: Comparison of neutron probe, TRIME-T3 and gravimetric method for water content 


determinations in a loess soil. 


Water Content [Vol.-%] 
10 20 30 40 50 60 


depth [cm] 





Figure 5 : Comparison of neutron probe and TRIME-T3 for water content determinations an illitic clay. 


Some materials, especially very clayey soils and soils with high organic contents, can afford material 
specific calibrations due to their different dielectric behaviour. 


A limiting factor in TDR measuring is the bulk soil electrical conductivity. For the TRIME-T3 tube probe, 
bulk soil electrical conductivity should not exceed 1 dS/m. Note that bulk soil electrical conductivity is a 
combination of the pore water electrical conductivity and the surface conductivity of the soil matrix. Due 
to the tortuous nature of the conductivity path in the soil (soil type dependent), the bulk soil conductivity 
is much lower than the electrical conductivity of the pore water and it is dependent on water content. 


2.4 Summary 


The TRIME tube probe is a promising new tool for determining water content profiles with the TDR 
method. Fast, routine and non destructive measurements of water content without the use of 
hazardous radioactive materials are possible. A measuring accuracy of + 2 vol.-% is possible, provided 
that soil and access tube are in close contact and bulk soil electrical conductivity doesn't exceed 
1 dS/m. 


11 


IMKO y/ 


MICROMODULTECHNIK F GMBH 


3 Access Tubes and Augers 


The penetration depth of the measurement field of the 44mm TRIME tube-access-probe is up to 
150mm into the soil. The measurement sensitivity is the highest near the access tube and decreases 
exponentially into the medium. Therefore the insertion method of the access tube is very important. 


Small version 





nl, para without soil 
S anchors for , 
a access tubes Pre-boring Fixing 
Be UDE with 1m length with an of the 
Ramming head < BARK FR Edelman- rubber 
with clamp device ee — i auger bung 
— | 
X a BE > 
TECANAT a Pa 
Auger access — ae F 
equipment for Se 
the direct setting 
of the access | | 
tubes into x 
homogeneous I~ Support 
soils. pillar 


with clamp 
device 








ancho 
| Internal 
NEN SS steel guide i 
and P a 
= ° protection 
a > tube [am] 
` 
> o ik . le 
evice 
D i BØR: OP 9 af for 
> d rubber 
o 2 ° A oS bung 
¢ 7 i 
T = Steel cutting shoe z * ee Q O ze 


of access tube 


Pre-boring of bore holes with standard augers destroy the soil texture, because it is difficult t0 come to 
a good and close contact of the access tube inside the soil. With the described auger equipment it is 
possible to set the access tubes directly into homogenous soils without pre-boring. In very stony soils it 
is not possible to use this method. Therefore it could be possible to use an Edelman-Auger for pre- 
boring and closing the air gaps with mud. Changes in soil structure, and a delay time (up to 4 weeks) 
before it is possible to come to precise measurement values must then be accepted. 


The IMKO auger equipment consists of: access tube support pillar with three soil anchors, ramming 
head with clamp device, screw auger with handle, clamp device for the rubber bung, and an internal 
steel guide/protection tube. Deliverable is a small version without soil anchors for setting of glass fibre 
tubes with 1m length. 

A steel cutting shoe is glued into the access tube. The screw auger, that moves easily within the guide 
tube is used to drill out soil to about 0,1m below the cutting shoe. Depending on soil homogeneity, the 
tube can be hammered 5..10cm into the soil. This cycle is repeated until the tube is fully installed. The 
internal protection tube is then removed and the access tube can be sealed by a rubber bung. 


12 


IMKOy/ 


MICROMODULTECHNIK ¥ GMBH 


4 Instructions for Access Tube Installation 


The following instructions should be taken account of: 






Ramming Head 


Fixation- with Clamp Device 


Screw 




















Pull for best 
position 
Plastic 
Inlet 
Internal Steel 
Guide and 
TECANAT Protection Tube 
Access Tube 
0,6m 1m or 


2m long os 














Steel Cutting Shoe 
of Access Tube 





4.1 Fixing of the rubber bung 


The ramming head, the TECANAT 
access tube and the internal steel guide 
and protection tube are one unit. 

The internal protection tube has to lie on 
the cutting shoe of the access tube, 
before it can be fixed with a screw to the 
ramming head. This fixation is 
necessary to secure the shoe against 
being squeezed out by the returning 
force of the hammer-blow. 

The access tube, however, is fixed to 
the ramming head by the clamp device. 
Both fixation screw and clamp device 
should be controlled during the 
installation process and be re-adjusted 
with the adjustable levers if necessary. 
The screw auger, that moves easily 
within the guide tube is used to drill out 
soil to about 0,1m below the cutting 
shoe. Depending on soil homogeneity, 
the tube is then hammered 5-10 cm into 
the soil with a plastic hammer (with open 
support pillar clamps!). The guide tube is 
not used for making the hole in the first 
instance because this could result in soil 
compaction around the hole, which 
would lead to higher measurement 
values. 


The access tube support pillar with three 
ground anchors avoids vibrations that 
would cause air gaps. Then the clamp of 
the support pillar must be closed and the 
soil can be removed with the screw 
auger. When the tube reach the support 
pillar, it must be removed and the 
access tube can be inserted to the final 
depth without the support pillar. 


The rubber bung can be pushed into the access tube with the screw- adapter and the handle (the 
screw-adapter can be replaced instead of the screw auger) and can be fixed at the bottom of the 
access tube with two turns of the handle. If pushing down the rubber bung turns out to be difficult, just 
apply some talcum powder on the rubber bung sides and into the access tube. 


A plastic collar should be mounted around the tube to prevent water from running down the tube wall 


and a plastic cap to protect the tube against rain. 


13 


MICROMODULTECHNIK | GMBH 


4.2 Inserting T3 into the TECANAT tube 


When you are going to work with your TRIME-T3 tube access probe: 
Press the spring mounted wave-guides to the probe body when you insert the T3 probe into the tube! 
Thereby you avoid ripping off the spring mounted wave-guides. 


able 
ook 




















K— 0 
S - (dp) 
OD 
os Ben 
k— A. 
”) 
TRIME-FM3 or TRIME-IPH Se SENER == 
TECANAT plastic tube 
T 
3 Pa 
Vee N en = 
A `~ 
7 N 7 2 ee 
a t- 
z ` m~ ae 
(> 





Please note 


Should you use new T3 probes (eight wave-guiding plates instead of two) in old GFK tubes, we advice 
to carefully chamfer the inner top side of the GFK tube. Thereby you avoid ripping off the spring 
mounted wave-guides. 


Please note 


With the T3 comes three aluminium rods, which can be screwed together. They can be used to 
orientate the T3 probe in the borehole. 


IMKOy/ 


MICROMODULTECHNIK ¥ GMBH 


5 Basic Alignment with the Calibration Set 


Coax cable 








TRIME 
Probe 
ae water 
ER dry glass saturated 
beads 
glass beads 
Calibration 
Connector 
5.1 What is a basic alignment? 


The basic alignment serves to compensate the cable length and tolerances of the probe 
mechanics (thickness of the rod coating, rod length, etc.). After two measurements, one in dry 
and one in water saturated glass beads, the calibration data is calculated and stored in the 
TRIME probe’s connector. 


Every TRIME probe must be calibrated before it can supply proper measurement results. It is 
very important that the probe is calibrated with the device it belongs to. This calibration is 
regularly done by IMKO before the delivery of new probes. 


Please note that probes can only be used with the TRIME device they were calibrated with! 


5.1.1 What are the benefits of the calibration set for the user? 


With the calibration set you can easily calibrate probes on your TRIME instrument by yourself. 
The calibration set offers the following advantages to you: 


1. If defective probe rods must be changed you are able to make the required basic 
alignment by yourself. 


You can calibrate probes purchased later with your TRIME-instrument by yourself. 


If you have two or more instruments you can change the configuration of instruments 
and probes anytime by a new calibration of the appropriate probes to the specific 
instruments. 


You would have to send instruments and probes to us in any of the above cases where basic 
alignment is required if you have no calibration set. IMKO will charge calibration costs. Moreover 
you will save the forwarding charges and you will not have to interrupt your measuring campaign, 
if you calibrate by yourself. 


However, the calibration set allows only to make a basic alignment of the TRIME probes. You 
can not change the standard calibration for specific materials with it. For this purpose a 
measurement data set must be created with this specific material. In order to calculate the 
calibration data for this data set and to download it into the TRIME-probe you need the 
calibration program SMCAL. 


IMKO y/ 


MICROMODULTECHNIK ¥ GMBH 


5.2 How to make the basic alignment? 


5.2.1 Preparation of the glass beads 


First, the glass beads, which are supplied with the calibration set, have to be prepared. The 
preparation of the dry glass beads is uncritical: Fill up one of the containers until the rods of the 
probe could completely be inserted. To achieve a constant density, knock the container several 
times against the ground. After a long usage of the glass beads the density increases. Therefore 
they should be poured out into another bucket and poured back to achieve the original density. 


The preparation of the water saturated glass beads is more critical, because water dissolves 
Na2O and K;O from glass. This causes a rising pH-value and an increased electrical 
conductivity. This property is most intensive with new glass beads. Therefore the glass beads 
should be washed intensively with tap water in a large container (e.g. 10 litre bucket). Fill a 
bucket with water, stir the beads under water and then pour out the water. This procedure should 
be done at least five times, each time with fresh water. Ifthe glass beads have been in use for a 
longer time, three times is enough. 


Now the second calibration container has to be filled with water in order to be able to fill in the 
glass beads without remaining air-bubbles. An additional precaution to remove air-bubbles is to 
stir slightly while filling in the glass beads. The container must now be knocked against the 
ground some times to achieve a constant density. The surplus water must be poured out until the 
thickness of the water film above the glass beads is below 2mm. 


The water saturated glass beads should be in a temperature range between 20°C and 25°. 


Please note that the electrical conductivity of the water saturated glass beads medium 
increases already after a few days storage. Therefore the glass beads must be washed again 
before the next calibration. 


5.2.2 Basic alignment procedure 


The basic alignment can be done with both the calibration connector (only TRIME-FM) and the 
calibration program SMCAL (please read the information about the basic alignment with SMCAL in the file 
README. TXT in the subdirectory BASICCAL of the SMCAL-disk). 


Only the procedure with the calibration connector is described in the following: 


Before starting the essential calibration, connect the probe to the TRIME-FM and press the 
START button to switch on the instrument. After this „dummy measurement“ is finished, you can 
plug in the calibration connector at the side of the TRIME-FM. The display shows the first 
reference value of dry glass beads for the appropriate probe (e.g. 2,8%). The probe cable must 
now be unwound and spread out in a way that the cable doesn't touch itself. Moreover, it must 
have a distance to metal objects (e.g. metal table-top) of at least 10cm. The probe must now be 
stuck vertically into the dry glass beads. Both, container and TRIME instruments, shouldn't touch 
metal objects, too! Now, knock laterally to the container to achieve that the glass beads fit 
closely to the probe rods. Then start the first measurement by pressing the START button. 


After the measurement is finished, the second reference value is displayed (e.g. 43,8%). The 
probe has now to be stuck into the water-saturated glass beads. As described above please take 
care that the cable is not in contact with metal objects and itself. The probe rods must be 
completely and vertically inserted into the glass beads. The cable must not put force on the 
probe. Knock slightly laterally to the container for a close fitting of the glass beads to the probe 
rods. Now start the second measurement by pressing the START button. 


After the measurement time has expired and the calibration is completed and the next probe can 
be calibrated. If you want to terminate the calibration work, remove the calibration connector! 


To check the calibration success, measure in dry and saturated glass beads and verify the 
results with the reference values. The calibration would have to be repeated, if the deviations are 
too great. 


16 


JE 


IMKO 


MICROMODULTECHNIK F GMBH 


STEP LIST BASIC ALIGNMENT 


Connect the probe (P3 etc.!) to the TRIME-FM. 
Press button for switching on the TRIME-FM. Display shows: 


TRIME-System 
Software Version 2.3 
SN XXXX 


(=serial number of the TRIME-FM) 


Connect the calibration connector at the 7/pin flange connector of the 
TRIME-FM. Display shows: 


BASIC CALIBRATION 
Ldry glass beads 
Reference 2.9Vol % 


Put the P3 probe into your dry glass beads. (read “Preparation of the 
glass beads”p.16) 


Press button for starting the measurement 
Display Shows 1”: 


BASIC CALIBRATION 
Ldry glass beads 
Checking TDR Cir cuit 


Display shows 2”: 
BASIC CALIBRATION 
L dry glass beads 


Measuring... 
Display shows 3*°: 


BASIC CALIBRATION 
2.sat.glass beads 
Reference 43,/Vol % 


Put the P3 probe into your saturated glass beads (Read the description 
of the TRIME-FM user manual too!) 


Press button for starting the measurement 
Display shows 1°: 


BASIC CALIBRATION 
2.sat.glass beads 
Checking TDR Cir cuit 


Display shows 2% 
BASIC CALIBRATION 
2.sat.glass beads 


Measuring... 
Display shows 3”: 


BASIC CALIBRATION 
Ldry glass beads 
Okay, next probe! 
Reference 2.9Vol % 


Probe is calibrated. 


You can connect the next P3 probe for calibration (begin with step CJ) 
You finished calibration work? Then unplug the calibration connector! 


17 


IMKO y/ 


MICROMODULTECHNIK F GMBH 


6 EMV/EMI Precaution 


EMV/EMI precaution by means of ferrite filters ensures better disturbance suppression. Ferrite filters 
are clipped to both ends of the probe cable. They are important for an improved measurement 


accuracy. 





EMV/EMI- 
Ferrit Filter 
q ~a 
snap snap 
here here 
ZCAT-2035 
rod probe 


tube 
probe 


18 


snap 


here 
A EM 
Ferrit Filter 


id ZCAT-1518 
a= | 









TRIME-FM 


@ Measuring 


®© Start 


SZ rmerm 
Analog- BAR ersion 

f IMKO 
er 71 ON 


ZCAT-2035 U 


RS232-cable 


IMKO y/ 


Instructions for Wiring 


In diesem Bereich i Buchseneinsatz Geundenne 
einfetten ! į female insert | coupling ring 


In this area place 
a thin coat of grease ! | ! 






Hülse mit Feder | 
Shell with spring | 


i 
Dichtring | T 
gasket 4 


Laie 





aa : 
me rl Druckring Druckschraube 






= ‘iL 
= ve a E i | 
a | | Ka” k L = thrust coilar pressing screw 
| HERRE , | — i | 
| il j nz | S Dichtring 
a FPE Í | 1 a | gasket 
Fi Druckring j Piching — "T I | 
7 thrust coilar | gasket —— i i 
Druckschraub am É j 
ruckschraube — i 
pressing screw rr i L 
El 





An den schwarz markierten 
Bereichen den Siliconkleber so 
dick auftragen, daß Dichtring 
und Kabel wasserdicht verklebt 
sind. 


At the black marked areas 
apply silicon glue so thick 
O-Ring that the gasket and the 


{| Gewindering 


coupling mng : cable are sticked together 
and are waterproofed. 


19 


IMKO y/ 


MICROMODULTECHNIK F GMBH 


7.1 Water tight connectors and cable confection for use with the 
environmental measurement system ENVIS 
Dear Customer, 


water tightness of the sensor modules (IP65) and the connectors (IP67) can only be guaranteed by 
observing the following: 








1. Incase of carrying out the cabling of the distribution modules by yourself, please make sure 
that the cable seals fit tightly. Only cables with a sheath diameter of 5 to 8mm should be used. 
In case of smaller diameters water may enter the connector, the distribution box or the 
measurement device and may alter measurements or even destroy the equipment. IMKO 
supplies special seals. 


2. All unused connectors have to be protected by blind covers. IMKO supplies all equipment 
respectively all open connecting terminals protected by blind covers. Additional ones can be 
obtained by IMKO. 


3. When installing the connectors, special attention has to be paid to the connectors being 
threaded with care. The threads have to be aligned correctly to ensure efficient tightness. In 
addition, the connector should only be hand-screwed, i.e. without use of tools (e.g. pliers). 


A thin coating of grease should be applied to the threads of the threaded ring and to the 
connector socket in order to ensure easy removal even after long periods of use. 


20 


MICROMODULTECHNIK | GMBH 


8 Operating instructions ACS-series 


Use of the charger 


Automatic charger / discharger for 4-10 cells nickel-cadmium and nickel-metalhydrid battery packs 
(4,8-12,0 V) with a capacity of 500-5000 mAh (ACS 410p traveller 800-9.000 mAh). 


Features 


e Micro controller controlled charging 

Test phase at the beginning of the charging in order to recognize and indicate defect battery 

packs 

Short circuit detection and electronic protection against reversed battery 

Battery condition at the beginning of the charging is of no importance for the battery packs 

Supervision of the charging condition by a micro controller during the whole charging time 

safety stages like voltage gradient supervision and -delta U switch off as well as a safety timer 

are integrated 

e possibility of discharging of the battery packs before use by pressing the button; after that, 
automatic switching over to the charging 

e automatic switching over to trickle charge 

e state indication through illuminated display 


LEDs 


Illuminated display red (1): the flashing of the red illuminated display can have different meanings: 
1. it signs the perfect contact of the battery packs during the test phase (about 10 seconds). 
2. it signs that the battery pack is not connected properly with regard to the pole 
3. it signs the defect battery pack or unsuitable amount of cells 
4. it signs the discharging after pressing the PRESS button 
Permanent light signs the charging of the battery packs. 
Illuminated display green (2): battery pack fully charged, trickle charge 





Operating elements 


Discharging button (3): the discharging is started by pressing the PRESS button (for about two 
seconds). 


Attention 
Only charge rechargeable Ni-Cd / Ni-MH battery packs. | 
By using other batteries there is BEIAK LAMM E=] mess (eka 





Caution 


Keep your charger in a dry place (indoor use only). The charger should be disconnected from the 
mains when not in use. Do not plug in the charger in case of damaged cabinet or power plug 


21 


MICROMODULTECHNIK | GMBH 


Operation 


The charger starts charging automatically as soon as a battery pack is installed and the charger is 
plugged in. Usually, the battery packs are brought into contact by the plugs which are enclosed the 
supply. If the red LED after the test phase (about 10 seconds) still keeps flashing, check the polarity of 
the battery pack. Please gather the changing of the polarity (+/-) of the battery pack out of illustration 
No. 5. If the red LED is flashing again after the test phase and does not switch over to permanent light 
for charging, either the battery pack is defect or the battery pack might also not have the right number 
of cells (less than 4 cells (4,8V) or more than 10 cells (12,0 V)). The test phase is followed by the 
charging procedure (red LED is permanent on). After the charging procedure, the charger switches 
automatically over to trickle charge (green LED is flashing; red LED is off). The starting of the 
discharging procedure occurs by pressing ( about 2 seconds) the button for discharging (3). However, 
this discharging procedure should only take place after the test phase. After discharging, which can in 
individual cases last for several hours, the charger automatically switches over to charging. 


Use in motor vehicles and trucks ( only ACS 410 mobile) 


The ACS 410 mobile can be plugged into a 12-32 V DC outlet. If you use it on DC you have to connect 
the provided DC cable to the cigarette lighter. 

Note!! In passenger cars (12-16 V DC) only 4 to 6 cells battery packs (4.8-7.2 V) can be charged. In 
trucks (24-32 V DC) you can charge 4 to 10 cells battery packs (4.8-12 V). 


Environmental reference 


Rechargeable batteries are not to be disposed in domestic waste. Surrender used batteries to your 
dealer or rather to the battery collecting point 


22