When considering a secondary standard of v/c ratio less than 1.00, the num ber of intersections requiring
mitigation based on forecast 2023 p.m. peak hour volum es increases to 20 under both the LOS D and
LOS E scenarios. For the second-highest hour, the num ber of intersections requiring m itigation rem ains
at 10. Table 5-2 includes a sum mary of the locati ons where the projected volum e-to-capacity ratio of
1.00 could be exceeded.
Table 5-1
Summary of 2023 PM Peak Period LOS Strategies
Needs Mitigation w ith
1 Hour Standar d Needs Mitigation w ith
2nd Hour Standar d
Location LOS LOS D LOS E LOS LOS D
Number of Congested Intersections (1)
Downtown M edford
4th at Central (1) A Yes Yes A Yes
Yes
No
Yes
Yes
4th at Riverside F Yes Yes E Yes
State Highway Intersections
Highw ay 99 at South Stage E Yes No (3) C No (3)
Highw ay 62 at Poplar/Bullock F Yes Yes D No (3)
Highw ay 62 at Hw y 99/Hw y 238 E Yes No (3) D No (3)
Highw ay 62 at Delta Waters F Yes Yes F
Highw ay 62 at Vilas E Yes No (3) D No (3)
Highw ay 238 at Sage F Yes Yes E Yes
South of Jackson Street
Barnett at Black Oak E Yes No D
Barnett at N. Phoenix E Yes No D No
Highland at Siskiyou F Yes Yes E Yes
Hillcrest at N. Phoenix F Yes Yes F Yes
Jackson at Crater Lake F Yes Yes F Yes
Main at Columbus F Yes Yes E
Main at Ross F Yes Yes E Yes
North of Jackson Street
Biddle at McAndrew s E No E Yes
Crater Lake at Delta Waters F Yes Yes F Yes
Congested intersections (2) 17 17 17
Intersections that w ould be fix ed to meet
alternative LOS standard 17 11 11
Intersections that w ould be degraded from
today’s 1-hour LOS D standard that w ould
not be fix ed None 6
5
Note: LOS means level of service. Analy sis results are based on the identified alter native LOS standard. PM peak
hour (1 hour) LOS D column r epresents the ex isting standard.
(1) Simulation show s that the permitted left-turn phase on the w estbound approach is not adequately served thus
causing extended queues that block upstream intersections. It is assumed that an exclusive left-turn lane w ould
be provided on this approach under all LOS standards considered.
(2) Based on today ’s LOS D st andard that reflects the public’s current ex pectations about acceptable levels of delay .
(3) Mitigation conclusions in this table are based stri ctly on LOS. Based on ODOT ’s v/c standards for state
highw ays these intersections w ould require mitigation.
Medford Transportation System Plan 5-6 Street Plan