Transportation System Plan 2018-2038

Medford · Page 154 of 398 · Adopted 2018-12-06

Table 5-8 Continued Summary of Street System Capacity and Operations Improvements Project No. Location Improv ement Sourc e of Improv ement Medford Street Improvements Continued 494 Highland, Barnett Rd to Siskiy ou Blvd Widen to three lanes w ith bike lanes and sidew alks RTP (Tier 2) 495 Coker Butte Rd, Lear to Haul Rd Construct new five lane road w ith bike lanes and sidew alks RTP (Tier 2) 496 Stew art Ave, Lozier Ln to Dixie Widen to five lanes w ith bike lanes and sidew alks RTP (Tier 2) 497 Highland, Siskiy ou Blvd to Keene W ay Widen to four lanes w ith curb, gutter, bike lanes and sidew alks RTP (Tier 2) 505 4th at Central Install WBL; convert WB approach to left, left, thru LOS Study 506 4th at Riverside Extend NBR lane LOS Study 507 10th at Central Remove parking at intersection and restripe to accommodate third through lane LOS Study 508 Lear W ay, Commerce to 1000’ north Construct new three lane road w ith bike lanes and sidew alks TSP 509 Barnett at N. Phoenix Widen and add WBR lane and second EBL lane LOS Study 510 Biddle at Jackson Add WBR turn lane LOS Study 511 Biddle at Law nsdale Add SBL lane and w iden Bullock to accommodate the added lane LOS Study 512 Biddle at McAndrew s Add EBR l ane and third W BL lane. LOS Study 513 Biddle at Stevens Add right-tur n overlap on W B approach LOS Study 514 Crater Lake at Delta W aters Add EBL and W BL turn lanes and protect movements. Add EBR turn lane. LOS Study 515 Crater Lake at Jackson Add le ft-turn lanes on all approaches and protect movements LOS Study 517 Highw ay 62 at Delta W aters Add second W BL turn lane, second EBT lane and EBR turn lane LOS Study 518 High Crash Rate Locations Safety Improvement projects as needed (see Table 5-10 TSP 519 Hillcrest at N. Phoenix Add EBR turn lane and provide signal overlap LOS Study 520 Main at Columbus Add NBL and SBL and protect movements. Extend second W B lane further w est. Add SBR lane. LOS Study 521 McAndrew s at Columbus Add second SBL lane (on McAndrew s) LOS Study 522 McAndrew s at Riverside Restripe W B approach to T H, TH+RT, RT and modify signal LOS Study 523 McAndrew s at Roy al Add se cond NBL lane from Roy al onto McAndrew s LOS Study 524 McAndrew s at Springbrook Add SBR turn lane LOS Study 527 At transit stops Improvements at transit stops to enhance safety and access TSP 528 Truck route locations Install truck routing signs TSP 529 Other identified infill lo cations City bicycle lane improvements (see T able 10-5 for projects) TSP 533 McAndrew s Rd Bridge at Bear Creek Repair bridge (assume 80% federal share/20% city share – city share show n) TSP 534 10th Street Bridge at Bear Creek Repair bridge (assume 80% federal share/20% city share – city share show n) TSP 535 Barnett Road Extension e/o N Phoenix Road Construct new five lane arterial w ith sidew alks and bike lanes SE Medford Plan 536 Garfield, Holly to Kings Highw ay Widen to provide curb, gutter, bike lanes and sidew alks TSP Medford Transportation Syst em Plan 5-30 Street Plan
Ask AI what this page says about a topic: