Transportation System Plan 2018-2038

Medford · Page 156 of 398 · Adopted 2018-12-06

Table 5-8 Continued Summary of Street System Capacity and Operations Improvements Project No. Location Improv ement Sourc e of Improv ement Medford Street Improvements Continued 562 Eucaly ptus Dr, Sy camore Way, Ellendale Dr, Greenw ood St, Prune St, Harbrooke St, Corona Ave, Roberts Rd, Cherry St, Hillcrest Rd, Lawnsdale Rd, E. Vilas Rd 9th priority - Jurisdictional transfer road resurfacing TSP 563 Orchard Home Dr, Bateman Dr, Cottonw ood Rd, Gilman Rd, N runw ay Dr, Midw ay Rd, Cloudcrest, Harvard Pl, Highcrest Dr, Princeton Way 10th priority - Jurisdictional transfer road resurfacing TSP 564 Stanford Ave, Stardust W ay, Yale Dr, Crew s Rd, Archer Dr, Lowry Ln, Connell Ave, Ellen Ave, Marilee St, S. Stage Rd, Alamar St, Canal St, Meals Dr, Milford Dr,, Midw ay Rd 11th priority - Jurisdictional transfer road resurfacing TSP 565 Rio St, E. Vilas Rd, Pech Rd, Schultz Rd, T able Rock Rd, Annapolis Dr, Cadet Dr Normil T errace 12th priority - Jurisdictional transfer road resurfacing TSP ODOT Improvements 1 Hwy 62/N Medford Interchange Corridor Solutions Construct five lane overpasses, w iden bridge, reconfigure interchange, intersection improvements at Poplar RTP/LOS Study 1 Highw ay 62 at Poplar Intersecti on and signal phasing improvements. Possibly grade separate w ith Highw ay 62 Unit 2 Project LOS Study 3 Construct new interchange RTP 3 S Medford Interchange Southern connection to Center Drive/Garfield Road LOS Study 7 Hwy 238 Unit 2 – Hanley Road and Rossanley Drive Widen to tw o lanes w ith bike lanes and sidew alks (on Rossanley ) RTP 15 Coker Butte Road at Highw ay 62 and Crater Lake Avenue Install new traffic signals RTP/LOS Study 22 New Owen Drive Connection to Hw y 62 (w ith signal) RTP/LOS Study 22 Owen Drive at Highw ay 62 and Crater Lake Avenue New Owen Drive intersection w ith Crater Lake Avenue (w ith bulb-out and signal on Crater Lake Ave) RTP/LOS Study 24 McAndrew s, Biddle to Riverside Reconstruction of overpass to accommodate added lanes (assumed to be part of I-5 seismic retrofit project) RTP 25 Haul Road, Biddle to Delta Waters (Hw y 62 Unit 2) Construct new hour lane road w ith bike lanes and sidew alks RTP 26 Haul Road, Delta W aters to Gregory Rd (hw y 62 Unit 2) Construct new hour lane road w ith bike lanes and sidew alks RTP 27 Crater Lake Avenue, Elliot to Corey Widen to provide curb, gutter, bike lanes and sidew alks RTP 29 Hwy 99/Hw y62/ Hw y238 Grade separat ion or fly over (EA identifies need for further improvements in future) LOS Study 30 Highw ay 99 at South Stage Second NBL lane and SBR lane LOS Study 31 Highw ay 99 at Stew art Add third SB through lane LOS Study Medford Transportation Syst em Plan 5-32 Street Plan
Ask AI what this page says about a topic: