Transportation System Plan 2018-2038

Medford · Page 157 of 398 · Adopted 2018-12-06

Table 5-8 Continued Summary of Street System Capacity and Operations Improvements Project No. Location Improv ement Sourc e of Improv ement Jackson County Tier 1 Improvements 200 Table Rock Road/Pine to Biddle to W ilson Widen to five lanes w ith bike lanes and sidew alks RTP 204 Sage Road, Posse to Ehrman Way Widen to three lanes w ith sidew alks and bike lanes. Intersection improvements at Hw y 238. RTP/LOS Study 207 Oak Grove Rd, Medford UGB to Hw y 238 Widen to tw o & three lanes w ith bike lanes and sidew alks RTP Widen to three lanes w ith bike lanes and sidew alks Foothill Rd, McAndrew s to Delta Waters 217 Lozier Lane, Stew art to Jacksonville Hw y Widen to three lanes w ith bike lanes and sidew alks RTP 218 N Ross Lane, McAndrew s Rd to Rossanley Rd RTP 223 Widen to three lanes w ith bike lanes and sidew alks RTP 224 Kings Hw y, South Stage Rd to Stew art Ave Widen to three lanes w ith bike lanes and sidew alks RTP 227 Vilas Rd, Haul Rd to Crater Lake Ave, Hw y 62 at Vilas Widen to five lanes w ith bike lanes and sidew alks, Realign Crater Lake Avenue to increase spacing from Highw ay 62 and signalize intersection RTP/LOS Study 228 Table Rock Rd, Bear Creek to Pine St/Biddle Rd Widen to three lanes w ith bike lanes and sidew alks RTP 229 Beall Lane, F ront St. (Hw y 99) to Merriman Rd Widen to three lanes w ith bike lanes and sidew alks RTP 230 Stew art Ave, Hull Rd to Lozier Lane Widen to three lanes w ith bike lanes and sidew alks RTP 260 Hwy 238 at Sage Rd Add NBR and SBR lanes. Add second W BL lane and w iden Sage to accommodate the added lane. LOS Study 264 Main at Ross Add second EBL lane and w iden Ross to accommodate the added lane. Add W BR lane. LOS Study 265 Highw ay 62 at Vilas Road Add second east and w estbound through lanes LOS Study Source: 2001-2023 Rogue Valley Regional T ransportation Plan , 2002 and LOS Study , JRH T ransportation Engineering, 2003. Bridge Improvements Based on the list of structurally deficient bridges in the Medford UGB that were identified in Chapter 3 and further discussed above, the following im provem ents are identified in Table 5-9. Table 5-9 Bridge Improvements Bridge ID Jurisdiction Highw ay Mile Point Crosses Comment s 08752 City 10th Street 1.20 Bear Creek 07610 City McAndrew s Road 1.87 Bear Creek 07160 City Barnett Road 1.15 Bear Cr eek Repair part of S. Medford interchange project 08677N ODOT I-5 27.09 Bear Creek Repair part of S. Medford interchange project 08677S ODOT I-5 27.09 Bear Creek Repair part of S. Medford interchange project 08332 ODOT I-5 28.66 Medford Viaduct Repair/retrofit in 2003 03660 ODOT Highw ay 99 8.03 Crooked Creek Medford Transportation Syst em Plan 5-33 Street Plan
Ask AI what this page says about a topic: