Table 13-2 Continued
Transportation System Improvements
Medford UGB – Short-Range (2004-2008)
Funding A gency Project
ID No. Location Improvements Medford Othe r Cost
Medford Tier 1 Improvements – Short Range (2004-2008) Cont.
421 Jackson at Sunrise Install new traffic signal $225,000
426 4th at Oakdale Install new traffic signal
(MURA/City ) $225,000
428 Springbrook at Spring Install new traffic signal $225,000
431 Barnett at Golfview Install new traffic signal $225,000
440 Other identified infill
locations City sidew alk improvements (see
Table 10-11 for projects) $500,000
463 Hillcrest, N. Phoenix to
Highcrest Add sidew alks $120,000
477 Hillcrest Rd at Pierce Install new traffic signal $175,000
505 4th at Central Install W BL; convert W B approach
to left, left, thru (City /MURA) $440,000
506 4th at Riverside Extend NBR lane (City /MURA) $450,000
Highland Drive at Keene
Way/Barneburg Road $5,000
518 High crash rate locations Safety improvement projects as
needed (see T able 5-10)
522 McAndrew s at Riverside Restripe W B approach to thru,
thru/right, right and modify signal $30,000
525 Main St at Barneburg $175,000
529 Other identified infill
locations City bicycle lane improvements
(see T able 10-5 for projects) $500,000
530 Arterial or collector
locations as needed Install new or upgrade existing
traffic signals $250,000
Sub-total Safety $3,795,000
418 Barnett at Riverside Add third northbound through lane $750,000
513 Biddle at Stevens Add right-turn overlap on W B
approach $15,000
515 Crater Lake at Jackson Add left-turn lanes on all
approaches and protect
movements $1,690,000
517 Hwy 62 at Delta W aters Add second W BL lane, second
EBT lane and EBR lane – ODOT
share (not included in total) ($1,090,000)
517 Hwy 62 at Delta W aters Add second W BL lane, second
EBT lane and EBR lane – Medford
share $400,000
Sub-tota l Conge stion $2,855,000
443 Biddle, Midw ay to
Morrow Restripe for bike lanes $10,000
445 Cherry Lane, N Phoenix
Rd to Hillcrest Widen to three lanes w ith bike
lanes and sidew alks (North
Phoenix Road to 500 feet w est of
Stanford Avenue)
$1,000,000
527 At transit stops Improvements at transit stops (see
Table 7-5) ♦
♦ ♦
♦
♦
♦ ♦
♦
♦
♦ ♦
♦ ♦
516 Install all-w ay stop (potential
roundabout due to odd approach
alignment) ♦
♦ $250,000
♦
Install new traffic signal ♦
♦ ♦
♦ ♦
♦
♦
♦
♦
♦
♦
♦
♦ ♦ $300,000