Transportation System Plan 2018-2038
Medford · Page 270 of 398 · Adopted 2018-12-06
Table 13-3 Continued
Transportation System Improvements
Medford UGB – Medium-Range (2009-2013)
Funding A gency Project
ID No. Location Improvements Medford Othe r Cost
Medford Tier 1 Improvements – M edium Range (2009-2013) Cont.
473 Crater Lake Ave, Delta
Waters to Ow en Drive Widen to three lanes w ith bike lanes
and sidew alks $640,000
509 Barnett at N. Phoenix Widen and add W BR lane and
second EBL lane $900,000
514 Crater Lake at Delta
Waters Add EBL and W BL turn lanes and
protect movements. Add EBR lane $1,620,000
520 Main at Columbus Add NBL and SBL lanes and protect
movements. Extend second W B
lane further w est. Add SBR lane. $1,350,000
Sub-tota l Conge stion $5,010,000
Springbrook, Cedar
Links to Delta W aters Widen to three lanes w ith curb,
gutter, bike lanes and sidew alks $1,250,000
464 th to Main Remove parking and re-stripe w ith
bike lanes $5,000
494 Highland, Barnett Rd to
Siskiy ou Blvd Widen to three lanes w ith bike lanes
and sidew alks
527 At transit stops $300,000
Sub-total Alternative Modes $2,835,000
531 2070 signal controller upgrades $400,000
538 Arterial and collector
streets as needed $200,000
Sub-total High Priority TSM/Economic Development $600,000
475 Coker Butte Rd, Crater
Lake Hw y to east of
Crater Lake Ave $2,050,000
476 Owen Drive (formerly
Elliot Rd), Hw y 62 to e/o
Crater Lake Avenue Realign Crater Lake Avenue to
provide separation from Highw ay 62
(Cardinal becomes right in/right out
and Elliot intersection is closed) $2,050,000
Stanford, Coal Mine Rd
to Cherry Lane Construct new three lane road w ith
bike lanes and sidew alks $5,330,000
533 McAndrew s Rd Bridge
at Bear Creek Repair bridge (assume 80% federal
share/20% city share – city share
show n)
$1,000,000
534 10th Street Bridge at
Bear Creek Repair bridge (assume 80% federal
share/20% city share – city share
show n)
$1,000,000
536 Garfield, Holly to Kings
Highw ay Widen to provide curb, gutter, bike
lanes and sidew alk $1,602,000
Sub-tota l Othe r Proje cts $13,032,000
Medford Medium-Range Costs - $24,002,000
Available Funding - $24,000,000♦ ♦
♦
♦
♦
446 ♦
Cottage, 12♦
♦ $1,280,000
Improvements at transit stops (see
Table 7-5) ♦ ♦
Arterial or collector
locations as needed ♦
Install IT S equipment to facilitate
traffic flow and enhance sy stem
communications ♦
Move Coker Butte Rd north and
realign Crater Lake Ave ♦
484 ♦
♦ ♦
♦
♦
♦
♦
Medford Transportatio n System Plan 13-25 Plan Goals and Implementation