Transportation System Plan 2018-2038

Medford · Page 270 of 398 · Adopted 2018-12-06

Table 13-3 Continued Transportation System Improvements Medford UGB – Medium-Range (2009-2013) Funding A gency Project ID No. Location Improvements Medford Othe r Cost Medford Tier 1 Improvements – M edium Range (2009-2013) Cont. 473 Crater Lake Ave, Delta Waters to Ow en Drive Widen to three lanes w ith bike lanes and sidew alks $640,000 509 Barnett at N. Phoenix Widen and add W BR lane and second EBL lane $900,000 514 Crater Lake at Delta Waters Add EBL and W BL turn lanes and protect movements. Add EBR lane $1,620,000 520 Main at Columbus Add NBL and SBL lanes and protect movements. Extend second W B lane further w est. Add SBR lane. $1,350,000 Sub-tota l Conge stion $5,010,000 Springbrook, Cedar Links to Delta W aters Widen to three lanes w ith curb, gutter, bike lanes and sidew alks $1,250,000 464 th to Main Remove parking and re-stripe w ith bike lanes $5,000 494 Highland, Barnett Rd to Siskiy ou Blvd Widen to three lanes w ith bike lanes and sidew alks 527 At transit stops $300,000 Sub-total Alternative Modes $2,835,000 531 2070 signal controller upgrades $400,000 538 Arterial and collector streets as needed $200,000 Sub-total High Priority TSM/Economic Development $600,000 475 Coker Butte Rd, Crater Lake Hw y to east of Crater Lake Ave $2,050,000 476 Owen Drive (formerly Elliot Rd), Hw y 62 to e/o Crater Lake Avenue Realign Crater Lake Avenue to provide separation from Highw ay 62 (Cardinal becomes right in/right out and Elliot intersection is closed) $2,050,000 Stanford, Coal Mine Rd to Cherry Lane Construct new three lane road w ith bike lanes and sidew alks $5,330,000 533 McAndrew s Rd Bridge at Bear Creek Repair bridge (assume 80% federal share/20% city share – city share show n) $1,000,000 534 10th Street Bridge at Bear Creek Repair bridge (assume 80% federal share/20% city share – city share show n) $1,000,000 536 Garfield, Holly to Kings Highw ay Widen to provide curb, gutter, bike lanes and sidew alk $1,602,000 Sub-tota l Othe r Proje cts $13,032,000 Medford Medium-Range Costs - $24,002,000 Available Funding - $24,000,000♦ ♦ ♦ ♦ ♦ 446 ♦ Cottage, 12♦ ♦ $1,280,000 Improvements at transit stops (see Table 7-5) ♦ ♦ Arterial or collector locations as needed ♦ Install IT S equipment to facilitate traffic flow and enhance sy stem communications ♦ Move Coker Butte Rd north and realign Crater Lake Ave ♦ 484 ♦ ♦ ♦ ♦ ♦ ♦ ♦ Medford Transportatio n System Plan 13-25 Plan Goals and Implementation
Ask AI what this page says about a topic: