Zorro Ranch Projects / Tasks List 4/4/01
Zorro Ranch Projects / Tasks List 4/4/01
PROJ.
SORT ASSIGN. DATE & DESCRIPTION STATUS COMP.
TO DATE
JE 2/27 Talk to Ricardo about the roof tile designs for
landscape beds 3/31 Per GM - GM sent Ricardo fax.
JE discontinued the services of Ricardo
JE meeting with new designer
JE 3/30 Grading at Main house and the new road design JE to decide if the grading is correct and to
approve the way the road forks on the way
to the guest lodge
JE 3/29 Finish the Bowl Garden planting 3/29 Eden would like to plant the remainder
of plants in the bowl garden. The cost will
be $564.00. Approved 4/2 per JE
4/2 informed
JE 3/29 Petroglyph rocks moved to the main house 3/30 One rock has been brought up and
placed in the old dog yard. JE to let us
know the size, location and how many
rocks he would like.
4/2 Jeff to find larger rocks. The one rock
we have should go next to the chess set.
JE 3/30 Paddock area and stables at Main House Doug has provided sketches, how would
you like to proceed?
3/30 There has been no progress
JE Construct North Terrace at Main House Monarch is taking out the wa11s3/14
Memo from Mil sent to JE 3/19 re: paving
3/22 waiting for instructions
2/23 JE approved the $5,183.00 quote for
SORT KEY
JE- Mr. Epstein GM- Ms. Maxwell SM- DI- Decorating Issues Fe- Future Construction Issues 11Th House Manual
EFTA00578213
Zorro Ranch Projects / Tasks List 4/4/01
SORT ASSIGN.
TO DATE & DESCRIPTION STATUS PROJ.
COMP.
DATE
concrete. We are waiting for the 200 pieces
of stone to arrive before they can lay the
concrete. Stone should arrive in 2 weeks
April 7?
3/31 JE would like to keep the flowerbeds.
to get. to irrigate and plant
ground cover. will be out 4/7.
4/2 Bradbury has stopped work due to non-
payment.
JE 3/29 Seed the remainder of areas at Main House 3/29 Seeding can begin after May 15'h.
Cost $37,200.00
3/30 Quote sent SeedingMH.doc
4/2 to get second quote per JE
JE 3/30 What should happen with the ponderosa pine
gravel and lights? 3/31 Jeff to build dog fence around the
ponderosas.
4/2 GM left message for JE approval for
$3000.00 line locator
4/2 ,fioved line locator
4/4 ordered line locater, it should
arrive 4/9 and Jeff can begin
JE 2/27 Replace all outside globe light fixtures 3/31 Advised by GM that JE asked GM to
get in touch with Ricardo but now that
Ricardo is no longer consulting she does not
think they will get the information. GM has
4-5 large catalogs in New York for JE to
look at next week.
SORT KEY
JE- Mr. Epstein GM- Ms. Maxwell SM- DI- Decorating Issues FC- Future Construction Issues HM- House Manual 2
EFTA00578214
Zorro Ranch Projects / Tasks List 4/4/01
PROJ.
SORT ASSIGN. DATE & DESCRIPTION STATUS COMP.
TO DATE
JE
JE Jeff 2/27 Purchase light fixture in UL ceiling it should tilt
and shine on easel Jeff purchased 3/10.
3/30 JE to approve light fixture
4/2 Jeff to purchase more fixtures for
approval.
Jeff 2/27 Purchase flood lights over terrace, MB balcony,
back wall at library Jeff purchased 3/10
Jeff will ex lain installation procedure to JE
3/31 to get quote
4/2 and 4/4 Message left for Service
Electric
JE Mike
Jeff 3/30 In the upper library: the paintings on either side
of the library entrance needs to have lights on the
bottom 4/2 to have electrician wire
properly
JE 2/27 Purchase 52 inch picture light of the girl in the
princess staircase 3/30 2-23 inch lights have been put up for
JE approval on 3/30 visit.
JE 3/30 The living room gallery painting should have
copper colored fixtures 4/2 talked to Rich and he is
ordering 4 — 40" lights in bronze
Rich will call with delivery date
JE 3/31 The desert scene painting should have lights on
the top and bottom in the bronze color. 4/2 talked to Rich and he is
ordering 2 — 30" bronze lights
Rich will call with delivery date
JE 3/31 The living room painting needs the same type of
light fixture but in black and should have a halogen
bulb. 4/2 talked to Rich and he is
ordering a black 14" fixture.
He is checking to see if a halogen bulb can
SORT KEY
JE- Mr. Epstein GM- Ms. Maxwell SM- DI- Decorating Issues FC- Future Construction Issues HM- House Manual 3
EFTA00578215
Zorro Ranch Projects / Tasks List 4/4/01
PROJ.
SORT ASSIGN. DATE & DESCRIPTION STATUS COMP.
TO DATE
JE be used that fixture
4/2 Per Rich - they do not make halogen
lights
3/5 Landscape lights for Main House All lights have been ordered. They will take
approximately 20 days from order date to
arrive. Expected April 4. left
message for electrician to call 3/19
Message left 3/26
3/28 Electrician Scheduled for April 5th
4/2 Jeff picking up lights
4/4 Electrician had knee surgery and will
not begin until 4/11 Jeff
JE 3/5 Loggia spot lights not the correct size they need
to be replaced with lower profile lights called Service Electric on 3/12 and 3/29
3/15
Purchased new lights 3/24 Called Service
Electric 3/26 waiting for return call
Service Electric is coming out 3/28
Service Electric is here 3/29
Picture
4/2 JE to approve the fixtures that have
been installed on 3/30 visit
JE 2/27 Purchase picture light for the painting of the girl
in the main stair hall. Order 4-30 inch lights per GM 3/30 2-40 inch picture lights have arrived
and are in .lace for JE approval.
4/2 talked to Rich and he is
ordering 2 more 40 inch gold lights
SORT KEY
JE- Mr. Epstein GM- Ms. Maxwell SM- DI- Decorating Issues FC- Future Construction Issues HM- House Manual 4
EFTA00578216
Zorro Ranch Projects / Tasks List 4/4/01
PROJ.
SORT ASSIGN. DATE & DESCRIPTION STATUS COMP.
TO DATE
Rich will call with delivery date
JE 3/31 Mikes priority list MIKES PRIORTY LIST.doc updated 4/2
JE 3/30 Movie Theatre 3/30 Doug has provided sketches, how
would you like to proceed?
JE The phone lines have been repaired. Do you notice a difference?
JE Where should the telescope be located? JE to decide location.
JE Lean too and water troft should be painted Token
brown 3/28 Sample on lean too for JE approval
JE
i 3/24 Paint the balustrade the same color as the main
house 3/27 Painters have put the first coat of paint
to make it look presentable. They will
return after visit if approved The cost will
be approximately $5,000.00.
Picture
3/30 The Italian painters are scheduled for
May. Should we hold off on painting and
wait until the painters arrive in May?
Please advise.
3/31 Leave the balustrade the existing color
and wait for painters in May, per JE
SORT KEY
JE- Mr. Epstein GM- Ms. Maxwell SM- DI- Decorating Issues IT- Future Construction Issues House Manual 5
EFTA00578217
Zorro Ranch Projects / Tasks List 4/4/01
PROJ.
SORT ASSIGN. DATE & DESCRIPTION STATUS COMP.
TO DATE
JE 2/27 Purchase rugs for the east corridor across from
dining room 4 1/2 ft wide x ?
JE 2/27 Purchase Estancia furniture
JE
JE
JE Entry pillars for the Main House 3/30 Ricardo has sketched a design, how
would you like to proceed?
Pool room mattresses 3/30 JE to decide on fabric
4/2 The mattresses have been made and are
waitiriiri Albuquerque to be covered.
Find snow melt that contains OJ 3/30 has located a product that is
made out of corn that will not harm stone.
4/2 JE appLoved
4/2 ordered
4/15 Should arrive at ranch
JE 2/27 There should be something that sits on the top of
the heads in the hall near GM office 3/31 JE to have a look at the heads, we
have placed candles, pots, and horses per
GM
4/1 12 1/2 inch candles should be purchased
per JE
JE 2/27 Mechanical room door is warped 3/23 Mike is repairing the door front 3/20
3/23
complete
JE Adam 4/2 JE to decide where the outdoor grill should be
located. Adam to purchase
SORT KEY
JE- Mr. Epstein GM- Ms. Maxwell SM- D1- Decorating Issues FT- Future Construction Issues Int- House Manual 6
EFTA00578218
Zorro Ranch Projects / Tasks List 4/4/01
PROJ.
SORT ASSIGN. DATE & DESCRIPTION STATUS COMP.
TO DATE
JE Jeff 2/27 When the painting of the Spanish nude with
black hair arrives it is to be hung in front of the
telescope. Send picture to JE first Picture sent to JE 3/21 per his request.
Picture 3/22 I
Complete
J fi .Jeff 2/27 Purchase brown utility shed for MH A utility shed is needed to store water
softener, outdoor tools, dollies, and other
maintenance items.
There is an area staked out for JE approval.
We can purchase a pre fab building for
$7,000 or we can have Mike custom make a
building. The price would run about $4,000
depending on the design and materials used.
3/31 Mike to build per JE - send estimate
and sketch
JE Jeff
Mike 2/27 The knob on the exercise room door should be
turned the opposite direction 3/15 Jeff to change door handle
3/22 Door handle has been changed. JE to
approve on 3/30 visit 3/23
JE Mike
Jeff 3/8 Hang the cross in the upper library 3/22 Mike is going to look for the studs to
see if the cross can be centered.
3/28 E-Mail with hanging options was sent
3/28 We would like to wait for JE arrival
before we hang the cross it is more involved
than originally thought.
Picture
3/30 JE says that the cross is to sit on a base
and then a chain hung from the top of the
SORT KEY
JE- Mr. Epstein GM- Ms. Maxwell SM- DI- Decorating Issues FC- Future Construction Issues HM- House Manual 7
EFTA00578219
Zorro Ranch Projects / Tasks List 4/4/01
PROJ.
SORT ASSIGN. DATE & DESCRIPTION STATUS COMP.
TO DATE
cross and both arms. It should hang about 6
inches from the wall.
4/3 Chain was ordered will be in 4/9. Mike
returns from vacation 4/16 and will hang
CMS
JE Mike 2/27 sketch shelves for the massage room and send to
JE Sketch will be given to JE on his visit 3/30
3/31 JE approved shelve sketch
JE
JE 3/31 The heads in the living room gallery may need
to be lit. JE to confirm. 4/2 talked to Rich and he is
ordering 4- 8" lights so JE can decide.
3/13 Zorro Ranch water status Memo 3/12/01
3/7 MBI is pressure testing the lines they
should be complete 4/7. Once pressure
testing is complete, MBI will give us a
quote to put well 3&4 on line. Should Have
quote by 4/15
3/30 Gary as been traveling so we have not
received any information on desalination.
is going to use her contacts at the
university to get information on
desalinization.
Please advise if you know of anyone that
GM should call to obtain more information.
ave GM the number 4/2
4/3 called and spoke to Gene at
Ionic. He is sending info. on his company.
SORT KEY
JE- Mr. Epstein GM- Ms. Maxwell SM- DI- Decorating Issues FC- Future Construction Issues HM- House Manual 8
EFTA00578220
Zorro Ranch Projects / Tasks List 4/4/01
PROJ.
SORT ASSIGN. DATE & DESCRIPTION STATUS COMP.
TO DATE
JE
JE
JE
JE
JE 4/4 is going to meet with MBI on
4/5 to go over results of pressure testing.
3/21 The garages it the shop area at ranch central are
in poor shape, to get quote. JE to decide if they should be painted, if so
what color? Cost $875.00
JE approved 3/31. They should be the same
color as house.
2/25 Get estimate to repair roads Estimate sent to GM and Eric 3/13
E-mail from 3/21 not doing the roads
per JE
3/29 GM has asked us to explore other
options.
3/29 Call Larry to investigate road
equipment options to maintain roads in
usable condition.
3/30 Lany is going to look into rollers
3/23 Desert Scene painting from 3/26 Mike to hang.desert painting. Picture
4/2 Should be lowered 5 inches
2/27 Paint the shelves in the garage the same color as
the walls, per JE 3/5 The shelves have been painted. JE to
approve on 3/30 visit 3/26
Ranch Central - the stables should be painted the
same color as the inside As soon as it warms up Bobs paint can
begin
3/22 Samples on barn
4/4 The stain color will never match the
inside of the barn exactly because of the
SORT KEY
JE- Mr. Epstein GM- Ms. Maxwell SM- 01- Decorating Issues IT- Future Construction Issues 1O1- House Manual 9
EFTA00578221
Zorro Ranch Projects / Tasks List 4/4/01
PROJ.
SORT ASSIGN. DATE & DESCRIPTION STATUS COMP.
TO DATE
7 texture.
GM 2/27 Ask Pinto about the painting design for the
balustrade has sent a memo to Pinto 2/27
Memo 3/5
left message 3/7 for GM to talk to
Pinto in Europe
Memo to GM 3/19
Memo sent from GM 3/21
3/23 JE would like the balustrade painted
the same color as the house.
3/28 Requested quote from Bobs.
4/2 Waiting for painters to come in May per
JE
GM 2/27 Purchase new rug for pool gym hallway 41 x 6 3/22 GM Ordered Zebra Rug 3 weeks ago
from ABC
3/23 should arrive 3/30 er
4/4 called M and she is checking
on delis
GM Zorro pottery 3/30 M is checking on shipping date
4/4 Should arrive in 2 weeks per
GM Make new easel crank that is larger GM to try to locate original crank
GM 3/23 Mangle ironer training at the MH 3/23 The company does not give training
because it is meant for table linens not
SORT KEY
JE- Mr. Epstein GM- Ms. Maxwell SM- D1- Decorating Issues IT- Future Construction Issues HM- House Manual 10
EFTA00578222
Zorro Ranch Projects / Tasks List 4/4/01
PROJ.
SORT ASSIGN. DATE & DESCRIPTION STATUS COMP.
TO DATE
sheets. The girls will practice.
GM 2/27 Purchase rug for library bathroom 7f1 45inches Arrived and placed 3/15 pictures sent 3/15
Picture 3/15
complete
GM 2/27 Purchase 15x15 rug for exercise room Arrived and placed 3/15
Picture 3/15
complete
GM
2/27 Purchase two more carpets for the main hall
downstairs they should duplicate the one that is
existing but with brighter colors 3/17 We have placed 3 rugs in this area.
3/17 Pictures have been sent for GM
approval.
Approved and in place 3/20
3/21 pictures sent to . Pictures 3/20
complete
3/31 The rugs are not correct per JE
4/2 GM to provide return info.
4/2 GM to purchase correct rugs?
GM Need extra sheets for the guest bedrooms at the main
house (yellow and blue rooms) 3/29
complete
GM 2/27 Take digital .hotos of the furniture shipment
that arrives from Shipment arrived 3/7
Digital photos sent to GM 3/7 to ask for
placement instructions
Photos send 3/17 3/30
complete
GM 2/27 The guest hall needs more photographs 3/30 Will arrive in 2 weeks-April 12th per
GM 4/12
SORT KEY
JE- Mr. Epstein GM- Ms. Maxwell SM- DI- Decorating Issues EC- Future Construction Issues House Manual 1 I
EFTA00578223
Zorro Ranch Projects / Tasks List 4/4/01
PROJ.
SORT ASSIGN. DATE & DESCRIPTION STATUS COMP.
TO DATE
GM GM to send black and white pictures for frames in
upper library Photo dimensions 22 x 15 % inches
3/30 Should arrive in 3 weeks-4/I9 per GM 4/19
GM 2/27 Larger photos are need for the garage 3/30 Should arrive in 3 weeks per GM 4/19
GM 3/31 Replace glass in UL painting per GM 4/4 Which painting needs glass is
not sure.
GM 4/2 Library shelf dimensions:
4 Shelves at: Width 361/2 x H 71/2 x D 12''A
12 Shelves at: Width 35 'A x H7 % x D12 'A
2 Shelves at: Width 55 'A x H7'/ x D12 'A
DI
DI
DI Pinto Curtains for the arches in the hallway in front of the
living room Dimensions sent to Pinto 3/21
3/30 has been shipped per GM
Pinto 3/30 Curtains for the pool room doors 3/30 Fabric has been shipped, to
have curtains made per GM
Pinto Replacement plate for estancia wall 3/30 has been shipped per GM 4/12
DI Pinto Light fixture to replace 2 in JE and GM master bdrm
hall 3/30 has been shipped per GM 4/12
Mike Pole barn enclosure We can only work on the pole barn in the
mornings because the wind picks up in the
afternoon.
SORT KEY
JE- Mr. Epstein GM- Ms. Maxwell SM- DI- Decorating Issues FC- Future Construction Issues HM- House Manual 12
EFTA00578224
Zorro Ranch Projects / Tasks List 4/4/01
SORT ASSIGN.
TO DATE & DESCRIPTION STATUS PROJ.
COMP.
DATE
3/21 Mike has % the siding on
3/30 Mike has' of the siding up
Pictures
3/30 Electrician to put sockets behind paintings in the
UL 4/2 left message with Service
Electric.
4/4 Message
Seal the log cabin 4/2 Bob's paint will begin as soon as
weather permits 4/10
David 3/15 Remove remainder of the cactus piles on the
ranch 3/30 David will begin mid April 6/1
Deidre 3/15 Purchase emergency kits for each vehicle ordering 3/28
Will arrive 4/12
Deidre 3/31 Painting in UL of the alley should be cleaned 4La is making calls to find someone
that will clean paintings
HM Tamera and Jeff should be in the house when JE GM
arrive Advised Tamera and Jeff 4/2
HM All the lights in the main house should be on
throughout the day. Advised Tamera and Jeff 3/31
HM Duke should be in the house when they arrive Advised Tamera and Jeff 3/30
SORT KEY
JE- Mr. Epstein GM- Ms. Maxwell SM- DI- Decorating Issues IT- Future Construction Issues House Manual 13
EFTA00578225
Zorro Ranch Projects / Tasks List 4/4/01
PROJ.
SORT ASSIGN. DATE & DESCRIPTION STATUS COMP.
TO DATE
7 HM 3/12 Advised Jeff not to take dogs during a visit
Add to household manual 3/15/
complete
HM Advise Tamera that there needs to be water and food
for Max at all times. Add details to house hold
manual 3/15
complete
Jeff The stakes for the MH drive should be 24 inches and
have flat tops. Around the curves they should get
closer together. They should have whiter square
reflectors Jeff will begin 4/1
4/2 Jeff will begin after ponderosa pine
fence is approved
Jeff 3/28 Jeff to power wash the diamonds in the front
motor court
Jeff The two masks should go on the plane to 65th street 4/2 Complete 4/2
complete
Jeff 3/31 The statue in the garage belongs on the mantel
in the dining room. The plates are to be hung on the
fireplace. Pictures sent to JE when complete 4/4 Jeff working on.
Jeff Jeff to measure the pool doors at the main house for
Gary Measured and faxed to Gary 3/13 3/13
Complete
Jeff CD player is being repaired Picked up 3/13 3/13
complete
Jeff 2/27 When the large chess set arrives it belongs in the
north garden Arrived 3/8 will be placed 3/16 3/16
complete
SORT KEY
JE- Mr. Epstein GM- Ms. Maxwell SM- DI- Decorating Issues FC- Future Construction Issues HM- House Manual 14
EFTA00578226
Zorro Ranch Projects / Tasks List 4/4/01
PROJ.
SORT ASSIGN. DATE & DESCRIPTION STATUS COMP.
TO DATE
Jeff 3/28The stack of wood near the microwave dish
needs to be relocated for the visit Advised Jeff 3/27 3/28
3/29
complete
Larry Larry is ordering TV for breakfast room TV arrived 3/7 3/8
complete
3/14 Take down the TV screen in the bunkhouse
living rrn and put into storage 3/30 to begin after Pole barn 4/4
complete
3/14 Hang ranch blueprints in garage 4/4
complete
4/2 Talk to re:line locator 4/4
complete
Talk to re: seed prices for MH 4/4 is getting prices
Clutch on the water truck is broken Truck taken to be repaired should return
3/23 3/17
com . lete
Manoltio
Larry 2/28 Larry to purchase John Deer Gator for the ranch 3/28 to see if we can purchase one
in N.M.
4/4 Eric will send a check to NM
Mike Mike to make bases for library vestibule tables
Mike 2/27 make 2 10 ft benches out of the timbers for the
loggia 4/2 Mike is working on the benches
SORT KEY
JE- Mr. Epstein GM- Ms. Maxwell SM- DI- Decorating Issues FC- Future Construction Issues HM- House Manual 15
EFTA00578227
Zorro Ranch Projects / Tasks List 4/4/01
SORT ASSIGN.
TO DATE & DESCRIPTION STATUS PROJ.
COMP.
DATE
Mike Red doors into tables
Mike Sand and seal tables and benches for the main house
Mike Guest lodge — repair crawl space enclosure
Mike Chicken coop to be moved to area near stables
Mike Screen doors to be repaired at bunkhouse,
house and office
Mike Ventilation at pump pit for ranch central
Mike Repair French doors at Bunkhouse
Mike Estancia pews Mike received JE instructions 3/14
4/2 Mike will begin after his vacation 4/16
Mike Close in Sterilizer
Mike The guest lodge sliding glass door does not lock
SORT KEY
JE- Mr. Epstein GM- Ms. Maxwell SM- DI- Decorating Issues FC- Future Construction Issues MI- House Manual 16
EFTA00578228
Zorro Ranch Projects / Tasks List 4/4/01
PROJ.
SORT ASSIGN. DATE & DESCRIPTION STATUS COMP.
TO DATE
Mike The window in the log cabin is separating it should
be caulked.
Mike 3/30 The tables at the MH should be sanded and
sealed with a boat wax. Too many splinters per JE
Mike Mike to secure paintings so they do not tilt
Mike Build Motor court gates at MH Gates have been built will be hung 3/20
Mike is working on the pole barn — weather
is good so gates on hold..
Pictures 3/20
complete
Mike 2/27 Cover hole in wall under the yellow bedroom
sink at MH 3/20
complete
Mike 2/27 Change cords on the light in the library
vestibule to a black one 3/5 Service Electric changed one cord Mike
to change the second
3/30 Mike can repair once the frame is
repaired, should be complete 4/10
4/4 Picking up today 4/15
Mike Order steam room door sweeps Mike has installed the sag but the still
arenot the correct size. is working on
locating sweeps 3/19
3/21 Piece being shipped from Denver
3/28 Digital pictures sent to
3/30 Should arrive 4/15 4/15
SORT KEY
JE- Mr. Epstein GM- Ms. Maxwell SM- DI- Decorating Issues FC- Future Construction Issues HM- House Manual 17
EFTA00578229
Zorro Ranch Projects / Tasks List 4/4/01
PROJ.
SORT ASSIGN. DATE & DESCRIPTION STATUS COMP.
TO DATE
3/12 Train Wolfhounds and Duke 3/31 Dogs will begin training April 23rd
3/30 to purchase a new color printer for GM 4/2 Mark is sending GM computer
office. Talk to Mark about the type she has in Palm
Beach
3/30 to purchase tie backs and brackets for the
breakfast mom curtains 4/2 to meet with 4/5
2/26 Get a price on the butternut carpet sample for
the bunkhouse will be out to measure bunkhouse to
give an estimate 2/26
Will have prices 3/27 for GM approval
3/31 GM approved nature wool carpet
sample for large ranch house and
bunkhouse. Expected installation 4/25
Repair transmitting station for wells. (Controls the
water level in the tank) 3/20 Val Comm to give a proposal to repair
or re . lace transmitters
4/5 called to inquire about quote,
left messa e
Replace Pool Room Doors has sent dimensions to Gary. Gary
has been traveling but will get quote the
week of 4/1
4/4 Message left for Gary
GM portable phone in office Find out how to answer the phone
4/4 Phone is working
SORT KEY
JE- Mr. Epstein GM- Ms. Maxwell SM- DI- Decorating Issues EC- Future Construction Issues 11Th House Manual IS
EFTA00578230
Zorro Ranch Projects / Tasks List 4/4/01
PROJ.
SORT ASSIGN. DATE & DESCRIPTION STATUS COMP.
TO DATE
3/30 The tables in the estancia should be tiled 4/2 Vernon tile will out at the end of April
to work on fountain and tables — depends on
weather
Call Ionic in Mass. And give GM the info
Re: desalinization . Message left for GM 4/2 4/2 GM would like to call
4/4 They are sending info
3/31 The area beyond the north terrace should be
seeded and graded 4/2 to find a second quote
3/31 GM computer to be moved to her upstairs office
and another computer with a flat screen put in the
place of it. Mark should load downstairs computer
same way but with passwords. 4/2 Marc sending computer
Jeff
urns to be sent back to NY when delivered to Shipped 3/6 to 71g street 3/6
complete the ranch
2/27 Have the courtyard tree lights repaired Fixed 3/10 — Transformer was out 3/10
complete
Blue Mobile home to be moved to gravel pit Electric disconnected 3/13
Phone disconnected 3/13 3/14
Complete
2/27 Give Jeff note book for JE walk throughs 3/15
complete
Paint large ranch house 3/15 the house is half painted weather
permitting should be complete 3/20 3/20
complete
SORT KEY
JE- Mr. Epstein GM- Ms. Maxwell SM- DI- Decorating Issues Fe- Future Construction Issues House Manual 19
EFTA00578231
Zorro Ranch Projects / Tasks List 4/4/01
PROJ.
SORT ASSIGN. DATE & DESCRIPTION STATUS COMP.
TO DATE
7 2/27 Purchase alarm clocks for guest bedrooms MH
and guest lodge Total of 6 4 have been purchased still need 2 more
(Blue rm and 1 for guest lodge) 3/22
Complete
3/15 Repair diamonds in front motor court at Masons are working on the repairs 3/15
Pictures sent to JE, GM, SM 3/28
Picture 3/22
complete MH
Assemble balustrade at main house They are caulking the balustrade 3/14 will
take 2 weeks to finish weather permitting 3/27
complete
Have Western Systems come out to install sound
system when it arrives for Breakfast rm Sound system arrived 3/22
3/23 Western Systems will be out Friday
3/30 to install
Has been installed but the remote is not
working so Western Systems is trying to
troubleshoot 3/28
3/28 New Remote has arrived Mike is
programming 3/28
complete
Main House phone lines have interference and poor
reception Val Comm and Sawyers are trouble
shooting problems. 3/28 Sawyers is Fed
Exing a new CPU card.
3/28 Val-com and Sawyers are
reprogramming the system
3/29 Complete. They had to reprogram the
entire system Tom said there may be a few
"bugs" over the next few days. The phone
lines seem clear.]
3/31 Val Com to check lines 4/2 3/29/01
complete
SORT KEY
JE- Mr. Epstein GM- Ms. Maxwell SM- DI- Decorating Issues Fe- Future Construction Issues House Manual 20
EFTA00578232
Zorro Ranch Projects / Tasks List 4/4/01
PROJ.
SORT ASSIGN. DATE & DESCRIPTION STATUS COMP.
TO DATE
7 4/2 Val —Comm is checking on phone lines
3/27 Elevator lights are not working 3/29 Service Electric has repaired 3/29/01
complete
2/28 Fix the crumbling column in the estancia arranged for Les Files to come out in 3/29
complete April — it needs to warm up.
Adrian is re airin 3/28 Picture
2/27 Frame the island pictures Pictures taken to Absolute Framing on 3/8
Expect completion 3/29 3/29
2/27 Have someone repair green fountain tiles Vernon tiles will come out in April to repair
tiles. It needs to warm up.
3/31 Date has been changed because of
weather 4/10
4/25
Tamera 3/31 Add Velcro to the pictures in staff bdrm MH 4/4 Tamera is working on it
Tamera 2/27 Check telephone in exercise room The house is not wired for a telephone in
the massage room - plate to be installed
over circuit and Bobs paint to touch up 3/9
complete
SORT KEY
JE- Mr. Epstein GM- Ms. Maxwell SM- Di- Decorating Issues IT- Future Construction Issues HM- House Manual 21
EFTA00578233
Zorro Ranch Projects / Tasks List 4/4/01
PROJ.
SORT ASSIGN. DATE & DESCRIPTION STATUS COMP.
TO DATE
7
SORT KEY
JE- Mr. Epstein GM- Ms. Maxwell SM- DI- Decorating Issues FC- Future Construction Issues HM- House Manual 22
EFTA00578234
Zorro Ranch Projects / Tasks List 4/4/01
PROJ.
SORT ASSIGN. DATE & DESCRIPTION STATUS COMP.
TO DATE
SORT KEY
JE- Mr. Epstein GM- Ms. Maxwell SM- DI- Decorating Issues FC- Future Construction Issues HM- House Manual 23
EFTA00578235
📷 Images in this document (23 detected; 6 largest described)
AI-generated factual descriptions of embedded images (llava:13b). These are searchable across the corpus.
[Image 1] The image shows a document that appears to be a task list or a project management document. It is titled "ZORRO RANCH PROJECTS TASKS LIST 4/1/01." The document lists various tasks with dates, descriptions, and status indicators such as "COMPLETED" or "IN PROGRESS." There are also notes indicating the completion of certain tasks. The document is structured in a table format with columns for "SHORT
[Image 2] The image shows a document titled "Zorro Ranch Projects Tasks List" with a date of April 1, 2001. The document appears to be a list of tasks or projects with associated dates and descriptions. The tasks are organized in a table format with columns for "Task ID," "Task Description," "Start Date," "End Date," and "Status." The visible tasks include items such as "Purchase light bulbs," "Install new
[Image 3] The image shows a document titled "Zorro Ranch Projects Task List" dated April 1, 2001. The document appears to be a list of tasks or items to be addressed, possibly related to a project or a set of instructions. It includes columns for "Task ID," "Task Description," "Task Status," and "Task Due Date." There are several entries listed, each with a unique task ID, a brief description, and a due dat
[Image 4] The image shows a document titled "Zorro Ranch Projects Task List" dated April 1, 2001. The document appears to be a list of tasks or items to be addressed, possibly related to a project or a set of instructions. The list includes several items with corresponding numbers and descriptions, such as "A. Check the status of the new well," "B. Check the status of the new water system," and "C. Check th
[Image 5] The image shows a document titled "Zorro Ranch Projects Tasks List" dated April 1, 2001. The document appears to be a list of tasks or projects with associated dates and descriptions. The text is partially obscured by a red rectangle, indicating that some information is being withheld. The visible text includes project numbers, dates, and brief descriptions such as "The garage door shop," "Event S
[Image 6] The image shows a document titled "Zorro Ranch Projects Task List" with a date of April 1, 2001. The document is a list of tasks with corresponding dates and descriptions. It includes items such as "Install new lighting fixtures," "Install new electrical outlets," and "Install new electrical wiring." The tasks are organized in a table format with columns for "Task," "Date," and "Description." The