Paul Ferreras, PE

EFTA00619838 Dataset 9 6 pages Download original PDF Download as text
Paul Ferreras, PE Structural Engineer March 19, 2013 Director Smith Department of Planning and Natural Resources CEK Airport St. Thomas. USVI 00802 Subject: American Yacht Harbor Emergency Repairs to Columns Red Hook, St. Thomas. USVI Director Smith: I had been notified of a structural problem at the subject premises yesterday. I did make a site visit and observed two columns that had been structurally distressed. I was informed that on Sunday (the previous day) that occupants had been on the upper level and felt a drop in the structure. The upper level was at that point cleared of the occupants and it has not been occupied since that time. I observed at the main level (above the parking garage) that on the rear of the building that 4 inch diameter steel columns support the upper level. Two of these columns have a problem at the base. It appears that water has caused a corrosion issue at the base of the column and reduced the column section to a point that the base has failed and collapsed about 2 inches in height (see attached photo). I have conducted a load analysis on the two columns in question and determined that each of the columns have about 331 square feet of tributary support area from the floor above. The column has about 9 feet of un-braced height. My evaluation is that these columns each support about 29,800 pounds of dead load and 33,100 pounds of live load. My evaluation is based on assumed concrete thickness, floor finishes, approximate steel framing and a live load of 100 pounds per square foot. This evaluation uses assumptions that have not been verified but are to be expected for construction of this pe• The repair procedure (without considering finishes) is as follows and shown on the attached detail: 1) Support the column on each side. 2) Jack the structure back to level (about 2 inches) 3) Cut out the damaged column section from a few inches below the top girder to the base plate on the lower support. 4) Bevel cut the existing column section to remain and weld a new top plate to the existing section. 5)Inspect the lower base plate and either replace or reuse the base plate. 6) Install the new 4 inch diameter, X-Strong steel pipe column by bevel welding the pipe to the top plate and base plate. EFTA00619838 Page March 19, 2013 We are requesting that DPNR provide an emergency repair permit for this work. I have asked that the welder start by obtaining all the necessary materials and fully supporting the column in place. I will ask that the owner come to DPNR to pay whatever permit is necessary for this emergency repair permit. If you have any questions with this submission please contact me. Sincerely, Paul Ferreras, PE Attachments: Disclaimer: It should be noted that the above report is based on a visual observation and that there is no claim, either stated or implied, that all conditions were observed. The opinions and comments in this report are based on visual observation only. Architectural, mechanical. electrical or plumbing conditions are not included and no warranty expressed or implied as to the condition of the structure is intended. The engineer shall not be responsible for the means, methods, procedures, techniques or sequences of construction, nor the safety on the job site, nor shall the engineer be responsible for the Contractors failure to carry out the work in accordance with the contract documents. EFTA00619839 Page 3 March 19, 2013 Photo of Column Base - note corrosion at base and crushed base section. EFTA00619840 slit t5 esid- PAJA.a.41 t aW31.- 51-.•-4 rtonroC , rtErgAr .,`"1. 17i06 Clonal -f • N gt-v£.- CA'r Elovr pot t Cfcat 104,44..poe_ ORM- I Ft ottµ m'Aui FERRERAS. PE Si 1-46“) -44' It - 1"xef *1— V tkhiC. Csicabe. LemAit.( e-tni_Aet_ As SiCcits psi r1/4,a,-) 4 x- Sts-c6 <ss1 77s) fipe_. A 55 ki e,yerr cmg- ReoLtcf_ - eiAlse 5rE£L Tit In-'sce-c- C").“9 EFTA00619841 Paul Ferreras. PE Structural En neer Steel Column RIB • g:1EnOnect1VIRGIN-1)Proixis\AYKREDHOO-ICOLUMN-LEC6 ENERCALC. INCA 913-2013. Build:6.13227. VerS.132.27 Description : Column Replacement Code References Calculations per AISC 360-05, IBC 2006, CBC 2007, ASCE 7-05 Load Combinations Used : ASCE 7-05 General Information Steel Section Name : Analysis Method : Steel Stress Grade Fy : Steel Yield E : Elastic Bending Modulus Load Combination : PIpe4 x-Strong Allowable Strength 35.0 ksi 29,000.0 ksi ASCE 7-05 Applied Loads Column self weight included : 126.684 lbs ' Dead Load Factor AXIAL LOADS ... Axial Load at 9.0 ft, D=29.80, L=33.10 k DESIGN SUMMARY Bending & Shear Check Results PASS Max Axial+Bencing Stress Ratio = Load Combination Location of msui.above base Al maximum location values are ... Pa : Axial Pn / Omega : Allowable Ma•x : Applied Mn•x (Omega :Allowable : Applied Mn•y (Omega :Alowatie PASS Maximum Shear Stress Ratio = Load Combination Location of nuurabove base Ai maximum location values are ... Va : NOS Vn / Omega : Allowable Load Combination Results Maximum Axial • Bending Stress Ratios Load Combination Stress Ratio Status Location D Only 0.453 PASS 0.00 ft +D+L+H 0.954 PASS 0.00 ft +D+Lr+H 0.453 PASS 0.00 ft +D+S+H 0.453 PASS 0.00 ft +D+0.750Lr+0.750L+H 0.829 PASS 0.00 ft +D+0.7501+0.750S+H 0.829 PASS 0.00 ft +D+W+H 0.453 PASS 0.00 ft +D+0.70E+H 0.453 PASS 0.00 ft +8+0.750Is+0.750L+0.750W+H 0.829 PASS 0.00 ft +D+0.750L+0.7505+0.750W+H 0.829 PASS 0.00 ft +D+0.750Lr+0.750L+O.5250E+H 0.829 PASS 0.00 ft +D+0.750L+0.7505+0.5250E+H 0.829 PASS 0.00 ft +0.60D+W+H 0.272 PASS 0.00 ft +0.600+0.70E+H 0.272 PASS 0.00 ft Overall Column Height 9.0 ft Top & Bottom Fixity Top & Bottom Pinned Brace condition for deflection (buckling) along columns : X-X (width) axis : Unbraced Length for X•X Axis budding = 911, K = 1.0 Y-Y (depth) axis: Unbraced Length for NW Axis budding = 9 II, K = 1.0 Service loads entered. Load Factors will be appaed for calculations. 0.9540 : 1 Maximum SERVICE Load Reactions .. +D+L+H Top along X-X 0.0 It Bottom along X-X Top along Y-Y Bottom along Y-Y Maximum SERVICE Load Deflections ... Along Y-Y 0.0 in at for load combination : Along X-X 0.0 in lot load combination : 63.027 k 66.067 k 0.0 k-ft 9.658 k-ft 0.0 k-ft 9.658 k-ft 0.0 :1 0.0 ft 0.0 k 0.0 k 0.0k 0.0k 0.0 k 0.0 k 0.Oft above base at 0.0ft above base Maximum Shear Ratios Stress Raba Status Location 0.000 PASS 0.00 ft 0.000 PASS 0.00 ft 0.000 PASS 0.00 ft 0.000 PASS 0.00 ft 0.000 PASS 0.00 ft 0.000 PASS 0.00 ft 0.000 PASS 0.00 ft 0.000 PASS 0.00 ft 0.000 PASS 0.00 ft 0.000 PASS 0.00 ft 0.000 PASS 0.00 ft 0.000 PASS 0.00 ft 0.000 PASS 0.000 PASS EFTA00619842 Paul Ferreras. PE Structural En neer Steel Column Lic. # : KW-06009109 Licensee : Paul Ferreras, PE Description : Column Replacement .g:IEnpneeiVIRGIN-I)ProOctskAYlfREDHOO-ICOLIJMN-1.EC6 INERCALC. INC. I983-2013. Build:6.13227. VerS.132.27 Maximum Reactions - Unfactored Load Combination D Only L Only Dit X•X AS Reaction @ Base @ Top Y•Y Axis Reaction @ Base @ Top Note: Only non-zero reactions are listed. Axial Reaction @ Base k k k Maximum Deflections for Load Combinations • Unfactored Loads Load Combination D Only L Orly D+L D Only L Orly D+L Max. X•X Deflection 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 5 5' 5' 5' 5' 5' Steel Section Properties : Pipe4 xStrong Depth = 4.500 I I n S n Diameter = 4.500 I R n Wal Thick = 0.338 I Zx Area = 4.140 W2 I yy Weiahl = 14.076 pit S )7 Ycg 0.000 I R w k k k 29.927 k 33.100k 63.027 k Distance Max. Y•Y Deflection Distance 0.000 ft 0.000 in 0.000 ft 0.000 ft 0.000 in 0.000 ft 0.000 ft 0.000 in 0.000 ft 0.000 ft 0.000 in 0.000 ft 0.000 ft 0.000 in 0.000 ft 0.000 ft 0.000 in 0.000 ft = 9.12 nA4 J 18200 W4 = 4.05 W3 = 1.480 in = 5.530 ins13 = L120 W4 = 4.050 W3 = 1.480 I Loads are total entered value. Mows do not felled absolute <I tenon. EFTA00619843

📷 Images in this document (6 detected)

AI-generated factual descriptions of embedded images (llava:13b). These are searchable across the corpus.

[Image 1] The image shows a hand-drawn sketch on lined paper, which appears to be a technical drawing or blueprint. The drawing includes various lines, shapes, and annotations that seem to represent a mechanical or architectural design. There are measurements and notes written in a combination of English and what appears to be Portuguese. The drawing includes a title at the top, which is partially obscured, [Image 2] The image appears to be a photograph of a mechanical object, possibly a part of a larger machine or structure. It shows a close-up view of a metal component with a blue and white color scheme. The object has a cylindrical shape with a flange at one end, suggesting it might be a part of a larger assembly. The background is out of focus, but it seems to be an outdoor setting with a brick surface, po [Image 3] The image shows a printed document with a table of data, which appears to be a financial or accounting report. The table includes columns with various numerical figures, possibly representing income, expenses, or other financial metrics. The document is titled "Financial Statement" and includes sections such as "Income," "Expenses," "Net Income," and "Cash Flow." There are also sections for "Asset [Image 4] The image shows a document that appears to be a letter or a memo. The document is addressed to "Paul Fanous, PE" and is from "Director, Planning and Natural Resources." The text is written in English and includes a date and a subject line. The document mentions a specific issue related to a permit application and discusses the process and requirements for obtaining the permit. The text is formal a [Image 5] The image shows a document with a table and a graph. The table contains numerical data with columns and rows, and there are percentages and numerical values listed. The graph appears to be a line graph with a title and a legend, but the specific details of the graph are not clear due to the resolution of the image. The document appears to be a technical or scientific report, given the nature of th [Image 6] The image shows a document that appears to be a letter or a report. The document is signed by an individual with the title "Dr." followed by a name. The text includes a salutation, a body with a request or statement, and a closing. The document is addressed to a recipient, and there is a date and a location mentioned at the bottom. The visible text includes formal language and a formal tone, which