Zorro Projects - 5/4/13
Zorro Projects - 5/4/13
Main House - Outside Start End Total Est. Cost Notes
Landscaping -Proposals & Maintenance from 3 companies forwarded to RK &
Rear Planter Bed DI - 3/28/13
Front & Rear Parking Beds
Bowel Garden 'JE approved 4/27/13, Aspen Landscaping received the contract to
refurbish.
Aspen Grove New proposal received 5/3/13 will review & forward 5/6/13
Pinion Screen
Landscape Lighting Timers - ;JE approved 4/27/13 to replace Timers
Landscaping - In House -JE approved 4/27/13 to remove existing Ponderosa Pines,
Landscape Lights & to relocate Pinions to the area.
Ponderosa Pines & Landscape Lights at
Front Entrance Removal of Dead Pine in Front Courtyard.
CAN WE PROCEED WITH REMOVAL
Bid Received 12/12/12 - Approved 3/20/13
Terraces - Three B's 4/7/13 $56,200.00
Terraces - $52,000.00
Stucco/Gutters/Painting - $4,200.00 Library Terrace Membrane - installed. Stucco to be completed
once MBR Terrence membrane is installed
MBR Terrace Demo complete. Work continues
$36,400.00 'Bid
Stucco Work - Three B's 4/7/13 Received 3/1/13 - Approved 3/20/13
Site Walls Wall Stucco Patching & Painting 90% complete
Columns Columns Stucco & Painting 90% complete
Attached Photos
Estancia Fountain -$2,500.00 Bid received 3/1/13
Bowl Lift - $1,220.00 JE approved 4/27/13
Electrical - $880.00
Pump - $400.00 4/29/13 - Brice determined that the leak is the main line going to
the upper bowl. Proposed repair is to isolate leaking line & use
return line to lower bowl, splitting line to feed upper bowl. This
will mean we will continue using existing pump & filter. Will
forward cost 5/9/13
EFTA00624854
Zorro Projects - 5/4/13
Chess Fountain - Requires resurfacing
JE approved 4/27/13
Bid will be forwarded 5/10/13
Ranch Front Gates - Received bid 4/20/13, have requested vendor to make
adjustments, new bid received 5/3/13, reviewing
JE approved 4/27/13
New Gate Openers
Main House - Inside Start Total Est. Cost Notes
Cooling Tower - 4/24/13 - RK approved bid from SPX & JBH. RK has all cost details
5/3/13 - Deposit was to be forwarded
Replacement of Pool Pac - 9/11/12 4/29/13 - Quote forwarded to RK, who requested more detail,
will forward once in hand
Engineering Inspection - $5,000.00
Unit Cost - $43,170.00
Ducting - TBA
Re • air of Pool Pac - 3/15/13 Unit working on fan only, proceeding with replacement of Pool
Pac
Repair Pool/Spa - Vendor on site 4/8/13 to review scope of work
Water Sample of Tap Water - 4/27/13 - JE requested water samples be taken.
This will be completed by the end of the coming week once water
system is balanced - Dakota Well/RO went on line 5/3/13
Exterior Doors - JE requested 4/27/13 that all saddles on exterior doors be
adjusted so doors will close correctly. Will be completed once
Terraces etc. complete
Audio Upgrade -Installed - final programming required
Installed - Programming of remotes required
New TV's
DVD Players/Theater Upgrade
EFTA00624855
Zorro Projects - 5/4/13
Kitchen Table Electrical - Three B's Bid Received 3/1/13 Lead Time 1 Week
Need to review design and floor
Electrical & Data Cut In - $2,160.00
Media Room - New Curtains/Blackout 2/24/13 JE selected fabric 4/27/13. Amount required has been placed on
hold. 2 companies will be submitting a bid by 5/9/13
Sarah's Office - New Curtains/Lined 2/24/13 JE selected fabric 4/27/13. As of date manufacturer cannot
provide enough yardage, they will forward an update 5/6/13
Gym - Mirrored Doors - Backed/Framed 2/24/13 3 B's completed, JE requested further work, will review with
vendor
IT & Phones Start End Total Ed. Cost Notes
4/27/13 JE approved the installation of new phones at MH
Reviewing new scope of work - Microwave option
Cell Repeaters & WI-Fl Start End Total Bt. Cost Notes
Cell Repeater - Library Will have installed by 5/9/13
Cell Repeater- Gym Will be completed with Audio install
Sound System - Gym Requires refurbishment to accept I Pad
Computers Lap Top - Lodge Desk Top - Office
REQUESTING APPROVAL TO PURCHASE
Well K Start En Total Est. Cost Notes
Plugging First Hole - $15,000.00
Multi Media Filters & Install - $5,844.57
Transponder & Install - $1,700.00
Mis Pipe & Fittings - $1,000.00
Windows Laptop - $700.00 4/27/13 5/3/13 $620.56 JE approved 4/27/13
5/3/13 - Multi Media Filters ordered
5/8/13 - Transponder to be installed
5/3/13 - Laptop purchased
Dakota RO Water Softener Start End Total Ed. Cost Notes
2/18/13 5/3/13 $3,045.45 Complete - Well & RO on line as of 5/3/13
Lodge Start End Total Est. Cost Notes
Roof - Repair/Replace Broken Sections 11 will complete while on site for upcoming projects
EFTA00624856
Zorro Projects - 5/4/13
Log Cabin Start End Total Est. Cost Notes
Step Outside - Repair/Replace 2/24/13 NA
Caboose Start End Total Est. Cost Notes
Outside Wall - Installation of Retaining Wall NA
Yurt Start End Total Est. Cost Notes
Yurt - Replace Walls/Roof/Door/Windows $6,355.00 plus shipping
charges of
approx. $480.00 JE approved 1/12/13.
Vendor forwarded quote 5/3/13 - lead time after payment 8 to
10 weeks.
Floor will need to be sanded and resurfaced
REQUESTING APPROVAL FOR 50% DEPOSIT
Flay Barn Start End Total Est. Cost Notes
Paint 4/8/13 NA Work to begin 5/9/13
Greenhouse Start End Total Est. Cost Notes
Paint-Outside 3/24/13 4/29/13 $390.00 Complete
Bunkhouse Start End Total Est. Cost Notes
Paint - Window Frames & Sills 2/24/13 NA Walls completed, working on window frames & sills
Window/Doors - Total Replacement 2/6/12 Will Budget for 2014
Reservoir Start End Total Est. Cost Notes
Paint - Tank 2/24/13 NA Will start once Bunkhouse & Haybam complete
Vehicles Start End Total Est. Cost Notes
2013 Ford Expedition - review Captain Seats
to be installed 3/27/13 Estimate received 5/2/13 - $11,528.74
Awaiting 2nd estimate
2008 Dodge Dually -Service/Repair $3,509.55 Complete
M2 Start End Total Est. Cost Notes
JE approved 4/27/13 investigating purchase of 2 dogs.
Researching
EFTA00624857
Zorro Projects - 5/4/13
Purchases White Rug - Gym (10 x 12) JE approved 4/27/13 to move ahead with Robert's Flooring to
manufacture a rug using carpet. Estimate expected 5/10/13
Big Urns - Outside MH JE approved 3/27/13 - Terre Cotto
Outside Pool Furniture
Large Chrome Pool Clock
Facial Machine Sue & Karyna to purchase
EFTA00624858
📷 Images in this document (5 detected)
AI-generated factual descriptions of embedded images (llava:13b). These are searchable across the corpus.
[Image 1] The image shows a document with a table of text. The table appears to be a list of items or tasks, each with a checkbox next to it. The text is too small to read clearly, but it seems to be a structured list with headings and subheadings. There are no visible names, dates, places, or logos that can be discerned from this image. The document type is not identifiable from this image.
[Image 2] The image shows a document with a table of text. The table has several columns with headings such as "Date," "Time," "Name," "Title," "Type," "Amount," and "Comments." There are rows filled with text, which appear to be entries related to expenses or transactions, possibly from a financial or accounting context. The text is too small to read in detail, but it seems to be a list of items with assoc
[Image 3] The image shows a document with a table that appears to be a checklist or a survey. The table has rows with headings such as "Question," "Answer," and "Score," indicating that it is a form for evaluating or rating responses to questions. The questions are not fully visible, but they seem to be related to some sort of assessment or evaluation. The document is a scan, and the text is not entirely cl
[Image 4] The image shows a document with a table that appears to be a checklist or a form with various columns and rows. The text is too small to read clearly, but the layout suggests it could be a form with fields for information such as names, dates, places, or logos. There are no visible names, dates, places, or logos that can be discerned from this image. The document type is not identifiable from this
[Image 5] The image shows a document with a table that contains rows of text. The visible text includes column headers such as "Name," "Date," "Time," and "Status." There are also visible entries in the table, including names, dates, and times, but the specific content of the text is not clear due to the resolution and angle of the image. The document appears to be a form or a report, possibly related to sc