I hope this email finds you well.
Please find below a summary of all that is happening at 320 East 82 Street: The Park Mansion
1. Under the advice of our professionals, we ripped up the many layers of floor and poured
new concrete so that the new floor will sit evenly on the concrete and not be subject to
the vagaries of 100 years of settlement.
2. We have started the internal framing of each unit.
3. We have a completion date of March 31, 2016.
4. We decided to change our marketing effort to start on January 15th in order to achieve
the maximum impact of the launch. In this market, potential buyers have to see units as
finished as possible.
5. Upon removal of the wall coverings, we discovered that our 100-year-old building
required significant repairs, which have since been completed.
6. The new subway will open on December 24, 2016 with an entrance one block north of
us on 83rd Street and Second Avenue
7. Please find enclosed a selection of photographs of the work that is being done, as well
as the three-week look ahead schedule.
In summary, the initial budget for the renovation has been upsized to allow for the repair of the
building, new concrete floors, and the accelerated delivery schedule. A new budget will be sent
out next week.
Thank you so much for your trust and confidence,
David J. Mitchell
801 Madison Avenue New York NY 10065
(T
EFTA00794893
TRACK 8c METAL STUD NEW POURED
CONCRETE FLOOR
EFTA00794894
NEW BUILD OF 6th FLOOR
EFTA00794895
CELLAR PLUMBING
EFTA00794896
PAGE I OF 3
THREE-WEEK LOOK AHEAD SCHEDULE
CONTRACT No.: 320 E 82nd Street PROJECT: Park Mansions
DESCRIPTION OF ITEM MON
10117 TUE
10116 WED
10119 THU
10720 FRI
10721 SAT
10722 SUN
10723 MON
1024 TUE
10125 WED
10126 THU
10127 FRI
10126 SAT
10129 SUN
10/30 MON
1031 TUE
11/1 WED
1112 THU
1113 FRI
1114 SAT
11/5 SUN
11/8
FRAMING LAYOUT
I
2
3
a
5
6 CLEAN AND CLEAR ALL SUEIFLOCRING x
RECEIVE REVISED ARCHITECTURAL DRAWINGS X
*STALL TRACK % X X X X X X X
*STALL SluOS AT wET wAu.S AND THEMOR FRATANG 2-5 X X X X X X X X
I I MON TUE WED THU FRI SAT SUN MON TUE WED TMJ FRI SAT SUN MON TUE WED THU FRI SAT SUN
DEMO OF MN FLOOR ROOF AT BuLICHEADS • CHANGE ORDER 10117 10116 10119 10720 10721 10722 10723 10/24 10125 10/26 1027 10/26 10/29 10/30 10731 1111 112 1113 1114 11/5 1115
FIMSHOEMCUTION OF ROOF SLAB AND CUT OUT STRUCTURAL STEEL X X
NSTALL NEW OA) FOR CHANGES TO 6 TNFLOOR ROOFING X X X X X
7 PREP WALLS FOR STEEL • EMBED WARM PLATES X
a
9
ID
11
IT
13
IS
15
16
IT
is
IT
20
21
22
23 MON TUE WED THU FRI SAT SUN MON TUE WED THU FRI SAT SUN MON TUE WED THU FRI SAT SUN
DEMO OF REAR EXTENSION -CHANGE ORDER 1 10/17 10/16 10/19 1020 10721 10722 10723 10124 10125 10126 10127 10128 10129 10/30 10/31 1111 1112 1113 1114 11/5 11/6
LAYOUT TEAT, PROTECTION win, ARSENAL X
START REMOVALS AT ROOF DECK X X
RECENE MK APPROVAL FRCM 335E 81ST ST MANAGERS X X
NSTRL ARSENAL PROTECnvE MEASURES X X X X
DEMO OF REAR EXTENSION • CHANGE ORDER t X X X X X X X X X X X X
I I MON TUE WED THU FRI SAT SUN MON TUE WED TMJ FRI SAT SUN MON TUE WED THU FRI SAT SUN
MASONRY 10/17 10/16 10/19 10720 10721 10722 10723 1024 10125 10/26 1027 10/26 10/29 10130 10131 1111 1112 1113 1114 11/5 1115
INSTALL LINTFSS AND IISILL CUSTOM SIZED WINDOWS Cm EASTERN FACADE X X X %
REPC0ITING OF PARAPET X X X
BREAK FLOOR AT BASEMENT FOR TRASH CHUTE FOOTING • MOVE ELEVATOR CONTROL 1ST X
BREAK FLOOR AT BASEMENT FOR TRASH CHUTE FOOTING -MOVE ELEVATOR CONTROL 1ST X
CMV INSTALL FOR TRASH CHUTE LOAD BEARING X X X X X X X X X X
I I MON TUE WED THU FRI SAT SUN MON TUE WED TMJ FRI SAT SUN MON TUE WED THU FRI SAT SUN
INSTALL STRUCTURAL STEEL 10/17 10/16 10/19 10720 1021 1022 1023 10124 10125 10126 10127 10126 10129 10/30 10/31 11/1 1112 1113 11/4 11/5 11/6
INSTALL ADDITIONAL wORK AT 44S2o2 MR PLATE X X X
RECEIVE APPROVED SHOP DRAWINGS X
ORDER STEEL X
FABRICATE STEEL X X X X X X X X X X X X X
START INSTALLATION OF STRUCTURAL STEEL X X
PLACE CONCRETE AT METAL DECK IN REAR EXTENSION X
I I MON TUE WED THU FRI SAT SUN MON TUE WED 174U FRI SAT SUN MON TUE WED THU FRI SAT SUN
a
25
26
27
2S
29
53 HVAC MET LAYOUT 10/17 10/16 10/19 10720 10721 10722 1023 10/24 10e25 1026 10e27 10e26 10/29 10/30 10731 1111 1112 1113 1114 11/5 11/6
MEETING WITH AOR FOR MECHANICAL DESIGN MID LAYOUT DUCT SIZE APPROVAL X
LAYOUT ONSITE MID CRAFTING X
SUBMIT DUCTWORK SHOP DRAWINGS FOR RECORD X
APPROVED SHOP DRAWINGS
DUCT FABRICATION X X X X X X X X
NSTALL OuCTwORK X X X X X X X X X X
NSTALL TEMP HEAT X X X X
31
32
33 I I MON TUE WED THU FRI SAT SUN MON TUE WED TMJ FRI SAT SUN MON TUE WED THU FRI SAT SUN
PLuMEING 10/17 10/16 10/19 10720 10721 10722 10723 1024 10/25 lens 1027 1026 1029 Iwo 10(31 1111 1112 1113 11/4 11/5 1115
COMPLETE CELLAR uADERGROum) PIPING % K K K %
SPECIAL ROUGH IPIDER3ROI.AvD INSPECTION X
CORE DRILLING AND RuNNNG vERnCAL STACKS THROuGHOR X X X X X X X X X X
34 HORIZONTAL BRANCH ROUGH NS X
II MON TUE WED THU FRI SAT SUN MON TUE WED THU FRI SAT SUN IRON TUE WED THU FRI SAT SUN
EFTA00794897
PAGE 1 OF 3
THREE-WEEK LOOK AHEAD SCHEDULE
CONTRACT No.: 320 E 82nd Street PROJECT: Park Mansions
DESCRIPTION OF ITEM MON
1WI7 TUE
10118 WED
10/19 THU
10/20 FRI
10/21 SAT
10/22 SUN
10/23 MON
10/24 TUE
10425 WED
10/26 TliU
10e27 FRI
10128 SAT
10/29 SUN
10/30 MON
10/31 TUE
1111 WED
1112 THU
1113 FRI
11/4 SAT
11/5 SUN
111E
35
36
37
33
39 ELECTRiCAL 1WI7 10118 10/19 10/20 10/21 10/22 10/23 10/24 10/25 10/26 10e27 10128 10/29 10/30 10/31 1111 1112 1113 1114 11/5 111E
RELOCATE ELEVATOR MACHINE CONTROL ROOM AS PER DRAWINGS X X
FRONDE POWER FOR TE1A, NEAT X X
I I MON TUE WED THU FRI SAT SUN MON TUE WED THU FRI SAT SUN MON TUE WED THU FRI SAT SUN
SPRINKLER 10/17 10/18 10/19 10/20 10+21 1022 10/23 10424 10/25 1026 10/27 1028 10/29 10430 10131 1111 1112 1113 1_1/4 11/5 WC
PROvOE REVISED DRAWINGS FOR TOM LOOP FOR WINTERIZED SITE X
SUBMIT NCOFOR THE ELEvATM Cf THE SHUT OFF VALVES AT THE RGERS X
RELOCATE TEMP LOOP AND SHUT OFF VALVES X X X X X X X X
EFTA00794898
PAGE 2 OF 3
THREE-WEEK LOOK AHEAD HOLD POINTS & PRECEDING OCCASIONS
CONTRACT No.: 320 E 82nd Street PROJECT: Park Mansions
ITEM DESCRIPTION OF ITEM SHIFT
TIME REA Oi:
WORK) COMMENTS / HOLD POINTS
DEPENDENCIES
FRAMING LAYOUT
AOR
RECEIVE REVISED ARCHITECTURAL DRAWINGS
STEEL DELIVERY OF PLATES
SIGNED NEIGHBOR AGREEMENT FOR 81ST ST
TEMP PROTECTION IN PLACE 1 CLEAN AND CLEAR ALL SUBFLOORING
2 RECEIVE REVISED ARCHITECTURAL DRAWINGS
3 INSTALL TRACK
4 INSTALL STUDS AT WET WALLS AND INTERIOR FRAMING 2-5
DEMO OF 6TH FLOOR ROOF AT BULKHEADS - CHANGE ORDER
5 FINISH DEMOLITION OF ROOF SLAB AND CUT OUT STRUCTURAL STEEL
6 INSTALL NEW CMU FOR CHANGES TO 6TH FLOOR ROOFING
7 PREP WALLS FOR STEEL - EMBED BEARING PLATES
DEMO OF REAR EXTENSION - CHANGE ORDER 1
8 LAYOUT TEMP PROTECTION WITH ARSENAL
9 START REMOVALS AT ROOF DECK
10 RECEIVE FINAL APPROVAL FROM 335 E 81ST ST MANAGERS
11 INSTALL ARSENAL PROTECTIVE MEASURES
12 DEMO OF REAR EXTENSION - CHANGE ORDER 1
MASONRY
13 INSTALL LINTELS AND INFILL CUSTOM SIZED WINDOWS ON EASTERN FAQADE
14 REPOINTING OF PARAPET
15 BREAK FLOOR AT BASEMENT FOR TRASH CHUTE FOOTING - MOVE ELEVATOR CONTROL 1ST
16 BREAK FLOOR AT BASEMENT FOR TRASH CHUTE FOOTING - MOVE ELEVATOR CONTROL 1ST
17 CMU INSTALL FOR TRASH CHUTE LOAD BEARING
EFTA00794899
INSTALL STRUCTURAL STEEL PAGE 2 OF 3
18 INSTALL ADDITIONAL WORK AT 41S202 BENT PLATE
19 RECEIVE APPROVED SHOP DRAWINGS
20 ORDER STEEL
21 FABRICATE STEEL
22 START INSTALLATION OF STRUCTURAL STEEL
23 PLACE CONCRETE AT METAL DECK IN REAR EXTENSION
HVAC DUCT LAYOUT
24 MEETING WITH AOR FOR MECHANICAL DESIGN AND LAYOUT DUCT SIZE APPROVAL
25 LAYOUT ONSITE AND DRAFTING AOR APPROVAL OF LAYOUT
26 SUBMIT DUCTWORK SHOP DRAWINGS FOR RECORD
27 APPROVED SHOP DRAWINGS
28 DUCT FABRICATION AOR APPROVAL OF LAYOUT
29 INSTALL DUCTWORK
30 INSTALL TEMP HEAT
PLUMBING
31 COMPLETE CELLAR UNDERGROUND PIPING AOR APPROVAL OF LAYOUT
32 SPECIAL ROUGH UNDERGROUND INSPECTION
33 CORE DRILLING AND RUNNING VERTICAL STACKS THROUGHOUT
34 HORIZONTAL BRANCH ROUGH INS
ELECTRICAL
35 RELOCATE ELEVATOR MACHINE CONTROL ROOM AS PER DRAWINGS ELEVATOR COMPANY SCOPE APPROVED
36 PROVIDE POWER FOR TEMP HEAT
SPRINKLER
PROVIDE REVISED DRAWINGS FOR TEMP LOOP FOR WINTERIZED SITE
SUBMIT RCO FOR THE ELEVATING OF THE SHUT OFF VALVES AT THE RISERS
RELOCATE TEMP LOOP AND SHUT OFF VALVES
EFTA00794900
PAGE 3 OF 3
THREE-WEEK LOOK AHEAD SCHEDULE
CONTRACT No.: 320 E 82nd Street PROJECT: Park Mansions
Prepared By: rafirSty 23K11727 -O11
pm 5v.iatmio Date: 17-Oct
Reviewed & Accepted By: JIM SALADINO Date: 17-Oct
Project Manager
EFTA00794901
📷 Images in this document (9 detected; 6 largest described)
AI-generated factual descriptions of embedded images (llava:13b). These are searchable across the corpus.
[Image 1] The image is a composite of three photographs, each depicting a different stage of a cellar plumbing repair. The top photo shows a cellar with exposed pipes and a damaged floor. The middle photo shows the same area with the floor partially excavated, revealing the plumbing system. The bottom photo shows the area after the repair, with the floor reinstalled and the plumbing concealed. There are no
[Image 2] The image is a collage of four photographs, each depicting a different stage of a construction or renovation process.
1. The top left photo shows a track and metal studs, indicating the initial stages of construction or renovation.
2. The top right photo shows a concrete floor, suggesting that the floor has been poured and is in the process of drying.
3. The bottom left photo shows a room with me
[Image 3] The image is a composite of two photographs, likely intended to show the process of building a floor. The top photo shows a close-up of a brick wall with mortar between the bricks, indicating the initial stage of construction. The bottom photo shows a more advanced stage, with the brick wall now enclosed within a larger structure, suggesting the floor has been built and is part of a larger buildin
[Image 4] The image shows a printed document with a table and text. The table appears to be a spreadsheet with columns and rows of data, possibly financial or statistical information. The text at the top of the document is partially visible and seems to be a heading or title, but it is not fully legible. The document is a scan or a photograph of a printed page, and the quality of the image is not high enoug
[Image 5] The image shows a document that appears to be a letter or a memo. It is addressed to "Dear Partner" and is from "Park Partners." The document includes a list of points or instructions, which are numbered and seem to be related to business or organizational matters. The text is formal and professional in tone. The document is signed at the bottom by an individual whose name is not fully visible. Th
[Image 6] The image shows a document with a table format, which appears to be a schedule or a list of tasks or events. The document is titled "Three Week Look Ahead Hold Point & Proceeding Occasions." It lists various items with dates and times, such as "10/22 10:00 AM," "10/23 1:00 PM," and "10/24 2:00 PM." The text is too small to read the specific details of each item. The document is structured with col