28 energy and water conservation projects
Lighting Improvements
Electricity Distribution
Systems
Water and Sewer
Conservation Systems
Commissioning
Total
2007 Baseline2
Percent of Baseline Projects'
Central lighting control system upgrades
High efficiency lighting fixtures (4)
Installation of high efficiency lamps (6)
Reduction of light levels (7)
Consolidate Power Distribution Units
Installation of low flow urinal water controls
RCx Optimization -
RCx Optimization -
RCx Optimization -
RCx Optimization -
RCx Optimization -
RCx Rescheduling
RCx Rescheduling BMS
Chiller Plant
Fan Coil Units
Heating Plant
UPS Load Management
- FCU System
- HVAC System (2) Projects
18
1 Energy
Savings
kWh
1,467,972
847,968
1
8 4,095,781
28 6,411,721 1,724 Water
Savings
liters
36,078,899
17.77% I ,
' tkamoss
1,724
Projects in Progress
Does not include following projects not yet completed: BAS replacement, Central AHU upgrades, Kitchen Management
System, Voltage optimization, and (4) lighting improvements. Building Data
Mid-rise Office with Trading
Operations
323,100 ft2
1 Great Winchester Street,
London, UK
See footnote 1 on page 41
' Protect Data records and energy & water savings provided by CRES year ending 2012 Savings calculation validated by third party. Arup Engineering.
2 Utility Data provided from Environmental Management System for year ending 2012. Data verified by third party. ERAS Certification and Verification Services
Deutsche Asset
t W.mith Mana;rt-RREEF Retrofit Partners. L.P. For U.S. Person Clients of the U.S./Americas Key Client Partners Desk Only
June 2014
CONFIDENTIAL - PURSUANT TO FED. R. CRIM. P. 6(e)
CONFIDENTIAL SDNY_GM_00259004 DB-SDNY-0 112820
EFTA01454603