RRP73 - Elysium

EFTA01454603 Dataset 10 1 pages Download original PDF
RRP73 - Elysium Appendix B: Case Study #3: Winchester House - London 28 energy and water conservation projects Lighting Improvements Electricity Distribution Systems Water and Sewer Conservation Systems Commissioning Total 2007 Baseline2 Percent of Baseline Projects' Central lighting control system upgrades High efficiency lighting fixtures (4) Installation of high efficiency lamps (6) Reduction of light levels (7) Consolidate Power Distribution Units Installation of low flow urinal water controls RCx Optimization - RCx Optimization - RCx Optimization - RCx Optimization - RCx Optimization - RCx Rescheduling RCx Rescheduling BMS Chiller Plant Fan Coil Units Heating Plant UPS Load Management - FCU System - HVAC System (2) Projects 18 1 Energy Savings kWh 1,467,972 847,968 1 8 4,095,781 28 6,411,721 1,724 Water Savings liters 36,078,899 17.77% I , ' tkamoss 1,724 Projects in Progress Does not include following projects not yet completed: BAS replacement, Central AHU upgrades, Kitchen Management System, Voltage optimization, and (4) lighting improvements. Building Data Mid-rise Office with Trading Operations 323,100 ft2 1 Great Winchester Street, London, UK See footnote 1 on page 41 ' Protect Data records and energy & water savings provided by CRES year ending 2012 Savings calculation validated by third party. Arup Engineering. 2 Utility Data provided from Environmental Management System for year ending 2012. Data verified by third party. ERAS Certification and Verification Services Deutsche Asset t W.mith Mana;rt-RREEF Retrofit Partners. L.P. For U.S. Person Clients of the U.S./Americas Key Client Partners Desk Only June 2014 CONFIDENTIAL - PURSUANT TO FED. R. CRIM. P. 6(e) CONFIDENTIAL SDNY_GM_00259004 DB-SDNY-0 112820 EFTA01454603