Appendix B: Case Study #2: 60 Wall Street — New York
Appendix B: Case Study #2: 60 Wall Street — New York
td energy, water, and renewab sJnergy projects
Chiller Plant Improvements
Building Automation Systems
& HVAC Controls
Heating. Ventilating, and Air
Conditioning Upgrades
Lighting Improvements
Chilled Water, Hot Water, and
Steam Distribution Systems
Electric Motors and Drives
Renewable Energy Systems
Water and Sewer Conservation
Systems
Commissioning
Appliance/Plug-load
reductions
Other
2007 Baseline2
Percent of Baseline Projects'
New high efficiency Chiller (2)
Recommissioning of hydronic free cooling system
Kitchen exhaust fan controls Projects
3
1
Energy efficiency upgrade of exhaust fans
Energy efficient replacement of ventilation fans 3
Energy efficient upgrade of fan coils unit
installation of high efficiency lamps (3)
LED lighting relamping (3)
Lighting circuit timers (2)
Occupancy sensor control (3) 15 3,649,293 3
Reduction of light levels
Replacement of indoor lighting fixtures (2)
Replacement of outdoor lighting fixtures
New Domestic Hot Water Pumps
Steam System Repair
Replacement of elevator motors & controls
Retrofit AHU with VFD and controls (3) 5
Retrofit CRAC with VFD and controls
Photovoltaic Array 1 146.229
Cooling Water Treatment & Controls
Installation of lowflow urinals
Potable Water Treatment System
Reduction in distribution losses 9
Reduction from domestic and fire water losses
Reduction in replacement water for steam system
Water efficient appliances (3)
RCx Decommissioning (7)
RCx Optimization (10)
RCx Rescheduling (7)
Energy Efficient Kitchen & Cafeteria Appliances (4)
Plug Load - Vendormiser
Automated demand response
Tenant awareness - Earthhour Energy Savings
kWh
3,258.095
396.555 Water Savings
liters
18.295
2 3,659.643
2.364.891 1.565
68.309 52,073 Building Data
High Rise Commercial Office
Single Tenant Commercial
Office with Trading
1,625,5001t 2
60 Wall Street,
NYC, New York
24 5,095.197 3.783 Projects In Progress
Does not include the
5 130,815 544 following projects not yet
completed: BAS
2 2.376 replacement, Chilled Water
70 18,789,698 57,968
92,550,623
20.30% Pump VFD and FIX Upgrade,
and (4) lighting
improvements.
See footnote I on page 41.
Project Data records arid energy & wale' savings provided by CRES year ending 2012. Savings calculation validated by third party. Arup Engineering.
2Utility Data provided from Environmental Management System tor year ending 2012. Data verified by third party. ERM Cenification and Verification Services
Deutsche Asset RREEF Retrofit Partners, L.P. For U.S. Person Clients of the U.S /Americas Key Client Partners Desk Only
W.Tml?" June 2014
CONFIDENTIAL - PURSUANT TO FED. R. CRIM. P. 6(e)
CONFIDENTIAL SDNY_GM_00259062 DB-SDNY-0112878
EFTA01454627