Subject- Fwd
WWI? owe
Subject- Fwd
From. Roy Meeker
To.
One WebInday. September 26. 2012 4.31 PM
island Marine
September 25,2012
industrial Service. LLC
(340)643-7222
6500 Red hook Plaza 0730
Sc. Thrums, U.S.V.I. 00802
Re /large repar at tale Sant James:
I. To supply labor and rriscelturous chop supplies as needed.
2. Trouble shoot and Stall hydraulic cylinders on the port and starboard ramp.
3. Re-alien the port and starboard engines and transmissiaits.
4. Renow anti replace hydraulic pumps and couplings.
5. Trouble shoot repar ; and i or replace any electrical, wiring, gauges, or sending unto.
6. Replace air filer system; and related hardware.
This total price will not exceed 532.600.00
Payrrrms will be nude as Wows: 35% deposit ( 511.410.00 ) Balance when the Jobs completed nut to
exceed 521.109 00
espcelably subnined by Hob Kas.sner
ItaLut UV. 1 I
EFTA_R1_00316336
EFTA01893995
4 SUBBASE DRYDOCIC, INC. COMPLETE MARINE REPAIRS SINCE 1981
September 4. 2012
Re: Condition Report Big N
To Whom it May Concern: TAI L)
The following report reflects the condition of the Rudder assembly, Drive train, Flex
Exhaust. Ramp and Hull:
Rudders
Upon removal of the rudder blade, the lower pintel was found to be out of round. the
bushing on the heel was worn and out of round. This is causing the rudder blade to
contact the base plate. Repair costs were discussed with your representative and repair
cost were not in budget.
lite tapper rudder shafts were examined and found to be covered in rust and grime.
Subbase Dryduck was instructed to remove rudder assembly, consisting of upper rudder
bearings, rudder arm. steering (hydraulic) pin.tie rod. and stuffing boxes. Many
connecting components were found to he worn. bushings were out of round, and parts
severely rusted.
Subbase Drydock cleaned all parts, and reinstalled same. Repair costs were discussed and
it was determined that repairs were not in budget.
The flanges holding the rudder stock to the rudder blade were disconnected and four of
the eight bolts were found to be in a non-serviceable state. at this time we arc awaiting a
decision.
Drive train
The propellers were removed, coupling retnoced, shalls removed. stuffing boxes
removed, and cutless bearings removed: upon removal all parts were cleaned and
inspected. The propellers arc in a satisfactory condition, the shafts are in a satisfactory
condition, the stuffing boxes were cleaned and new hoses with clamps were installed,
packing was removed and replaced with new.
tc: • far • Parcel 102. Subbase • St. Thomas, LISVI 001103
EFTA_R1_00316337
EFTA01893996
The sthd coupling was inspected and the key way was not uniform in width
Repair costs were discussed and it was determined that repair cost was not in budget. A
new step key was fabricated in a attempt to correct the loose fit. I his repair is not
considered to be a correction. The shaft log was found to be worn on the lower portion of
the log. (both port and stbd. the port side is in a more advanced state ), this was caused by
the engine not being in alignment with the shaft, an attempt was made to correct the
alignment on the port shaft, these two components. without extensive modification. are
not able to comply with industry standards (a rule fin non-alignment is approx 5
thousands of a inch, the port alignment is over a 1'2' out on the 12 to 6 o'clock position
and at least the same on the 9 to 3 o'clock position). The Stbd drive train is also out of
alignment but not as sever. Repair costs were discussed and it was determined that repair
cost were not in budget.
Subbace 1)rydock recommends that in the near future repairs should be made, if left in
this condition sever vibration will cause same part of the drive train to fail.
Flex Exhaust
(.:port remos al of the heat covering the flex exhaust flanges were found to be in a
deteriorated state. Subbase Drydock was instructed to fabricate new flanges . This was
not in our bid and will be a additional cost.
The reason the ticx part of the exhaust system failed was due to non-alignment ,
installing the new flex will only work for a short amount of time, once the engine
alignment issue is corrected the new flex will tune to be modified to fit or it will fail
again.
All of the above repairs art not under warranty.
Ramp
The underside of ramp on both outboard port and stbd sides showed sever wear to
pianng. Subbase Dr)dock was advised to make repairs in addition to the quoted repairs.
Ibis repair is on a time and material basis.
Elull
After the bottom was pressure washed and sanded, cracks were visible to several arras of
the hull. most in the strut area. Repair costs were discussed and a decision was made to
do some of the repairs. Repairs arc on a time and material basis.
All labor costs (other than bottom painting) were recorded and on all areas our repairs
were below quoted costs.
EFTA_R1_00316338
EFTA01893997
After a review of all our findings l would budget approx 40k to make the vessel
serviceable. This amount is over and aboe the work already performed.
EFTA_R1_00316339
EFTA01893998
ISLAND RIGGING & HYDRAULICS, INC. 8186 Sub Base Road. Suite 4
St. 4 homas. Vi in Islands 00802
Tel: Fax; L•mail:_
25 September 2012
ESTIMATE. A
MILD STEEI. HOSE FITTINGS AND ADAPTERS
To repair hydraulic plumbing for the loading ramp aboard the landing craft BIG N
PLEASE NOTE: The ramp cylinders must he pm in place by Subbase Drydock
LABOR: To remove 26 hoses: drain and dispose of oil: remove old valves and
valve bodies: measure and make up new hoses; install and bracket hoses and new
valves and valve bodies. Fill system with oil, hook up. bleed and test cylinders.
120.0 hrs ra 80.00/per hour 9.600.00
PARTS: To include hose fittings. adapters. hose, valves and valve bodies.
hydraulic oil and absorbers.
5.226.00
11 SE FABRICATION: 520.00
FREIGHT and HANDLING 250.00
TOTAI. EST IMATE: S15.596.00
NOTE: This is an estimate not a quote or fixed price. Unforeseen difficulties andior
unknown requests may warrant additional pans and'or labor. Thank you. we arc looking
ton an] to working with you.
EFTA_R1_00316340
EFTA01893999
📷 Images in this document (5 detected)
AI-generated factual descriptions of embedded images (llava:13b). These are searchable across the corpus.
[Image 1] The image appears to be a photograph of a printed document, possibly a manual or a report. The text is too small to read clearly, but it seems to be a technical or instructional document, given the context of the content. The document includes headings, subheadings, and paragraphs, which are typical of technical manuals or reports. There are no visible names, dates, places, or logos that can be di
[Image 2] The image shows a document, which appears to be a letter or a report from a company named "SUBBASE DRYDOCK, INC." The document is dated September 12, 2012, and addressed to a person named "Vincent May." The text on the document is too small to read in detail, but it seems to contain information related to a project or a report. The document includes a header with the company's name and logo, and t
[Image 3] The image is a photograph of a document, specifically a receipt or invoice from "Island Rigging & Hydraulics, Inc." The document is dated September 2013 and lists various parts and services provided, along with their respective prices. The total amount due is $39,000.00. The document includes a logo at the top left corner and a note at the bottom that reads "Thank you for your business."
[Image 4] The image is a photograph of a document, specifically a letter from "Industrial Services LLC." The letter is dated September 20, 2012, and it appears to be addressed to a recipient whose name is redacted. The letter contains a list of instructions or reminders, which include points about safety, equipment, and payment. The text is written in English, and the letter is signed by an individual whose
[Image 5] The image shows a document with text, which appears to be a letter or a formal note. The document is signed at the bottom, indicating it is a signed letter. The text is written in a formal style, suggesting it is a professional or official communication. The visible text includes a salutation, a body of the letter, and a closing. The document is printed on standard letterhead paper, which is typic