Document text



A 
^ 
woodgrain millwork 


Atrium Patio Door 
Field Service Manual 


December 2005 


Table of contents 


Service Agreement 

Release Agreement 

Inspection form 

Warranty 

Replacing swing panel 

Replacing sliding panel 

Adjusting standard hinges 
Adjusting adjustable hinges 
Replacing a profrench astragal 
Replacing a design french astragal 
Replacing a center swing astragal 
Replacing a sweep 

Replacing glass 

Replacing ACL bars 

Replacing a sill cover 

Replace weatherstrip channel at slider 
Replacing a keyed cylinder on a swing door 
Replacing a keyed cylinder on a sliding door 
Replace handleset on a swing door 
Replace handleset on a sliding door 
Replace interlock weatherstripping 
Replacing a multipoint lock- Swing 
Adjusting multipoint lock- Sidelite 
Adjusting rollers 

Adjust Sliding lock 


Caution: Panels, glass, etc can be quite heavy. Always lift appropriately. Follow 
manufacturers instructions for safe use of hand and power tools. 


Pg 2 

Pg 5 

Pg 6 

Pg 8 

Pg 12 
Pg 13 
Pg 14 
Pg 15 
Pg 16 
Pg 17 
Pg 18 
Pg 19 
Pg 20 
Pg 21 
Pg 22 
Pg 23 
Pg 24 
Pg 25 
Pg 26 
Pg 27 
Pg 28 
Pg 29 
Pg 30 
Pg 31 
Pg 32 





Woodgrain Millwork Field SVC Manual 12/05 


A 


woodorain millwork 


THIS SERVICES AGREEMENT (this "Agreement is 
made and entered into by and between 
WOODGRAIN MILLWORK, INC., an Oregon 
corporation ("Woodgrain"), and the repair and service 
technician identified below ("Contractor"). The 
purpose of this Agreement is to provide the terms and 
conditions under which Contractor will provide repair 
services on Woodgqgrain's installed windows and doors. 


T. CONTRACT DOCUMENTS. The Contract 
Documents consist of this Agreement (General Terms 
and Condilions), one or more Work Orders which may 
be issued from time to time to Contractor by 
Woodgrain, Exhibit "A" (Schedule for Labor Rates) 
attached hereto, and any other documents referred to 
in this Agreement, and in any modifications and 
change orders issued after execution of this 
Agreement. The Contract Documents represent the 
entire and integrated agreement between the parties 
and supersede prior negotiations, representations or 
agreements, whether written or oral. If anything in the 
other Contract Documents !s inconsistent with this 
Agreement, the specific provisions of this Agreement 
shall govern and control. 


2, SCOPE OF WORK. Contractor shall provide 
the repair services described in the Contract 
Documents. Contractor will perform such services 
for the hourly rate(s) for travel, and on-site labor, and 
will receive a mileage rate, all as set forth on Exhibit 
“A” hereto. Any additional charges not specifically set 
forth on Exhibit "A", for boarding, materials, and other 
items, must be pre-approved in writing by an 
authorized Woodgrain representative. Under no 
circumstances will Woodgrain pay for meals for 
Contractor and/or its employees (if any). 


J. SERVICES. 

3.1 Woodgrain shall, at its sole cost and expense, 
provide Contractor with replacement parts for 
windows and/or doors at such time as Woodgrain 
issues a Work Order to Contractor. Prior to the 
performance of any repair services on-sile at a 
customer's location, Contractor shall check the 
accuracy and condition of the replacement parts 
received from Woodgrain. Contractor shall not 
schedule an on-site service with the customer without 
first inspecting the replacement parts. Contractor 
agrees that it will not be paid for the cost of any 
unsuccessful on-site service trips resulting from 
Contractor's failure to pre-inspect the replacement 
parts. 

3.2 Contractor agrees to schedule an on-site 
service visit with the customer within 24 hours 
following inspection of the replacement parts. Any 
cosis incurred by Woodgrain resulting from 
Contractors failure to contact the customer within 
such 24-hour period will be borne solely by 
Contractor. 


Boisc-166066.1 0010897-00001 


Woodgrain Millwork Field SVC Manual 12/05 


WOODGRAIN MILLWORK, INC. 
SERVICES AGREEMENT / GENERAL TERMS AND CONDITIONS 


3.3 Upon completion of the services, Contractor 
shall use its best efforts to obtain a release and 
acceptance agreement from the customer in form 
provided by Woodgrain. 

3.4 Contractor shall provide Woodgrain with a 
weekly update as to the status of all open service 
claims that have been assigned to Contractor through 
Work Orders issued by Woodgrain. 


4, PAYMENT. Contractor shall provide 
Woodgrain with an itemized invoice for the services 
within one week of completion of the services. 
Contractor shall not be entitled to any progress 
payments. Payment will be due upon completion of 
the services and salisfaction of all of Contractors 
obligations under the Contract Documents, including 
correction of any defective or nonconforming repair 
services. Payment shall be due within 30 days of 
receipt of Cantractor's itemized invoice for completed 
services. 


5. STANDARDS. Contractor agrees to perform all 
repair services to Woodgrain's reasonable standards; 
to furnish at all times an adequate supply of 
equipment to perform the services; to perform the 
services in the best way and most expeditious and 
economical manner consistent with the interests of 
Woodgrain. Contractor represents and warrants to 
Woodgrain that it has sufficient technical expertise to 
perform the repair services required under the 
Contract Documents. 


6. GOVERNMENTAL APPROVALS. Contractor 
has obtained ar will obtain, at Contractors sole cost 
and expense, all necessary permits and approvals 
from all appropriate governmental agencies or 
authorities for the performance of the services. 
Contractor shall perform the services in such a 
manner that no law, ordinance, rule or regulation of 
any governmental agency will be violated. 


7. INSURANCE. Contractor shall maintain the 
following insurance coverages during the term of the 
Contract Documents and shall name Woodgrain as 
an additional insured: General Liability insurance, 
with a limit of liability of not less than 31 million per 
occurrence; Auto Liability insurance with combined 
single limit of not less than $1 million; and Workers’ 
Compensation Insurance with statutory limits for 
work-related accidents and a minimum of $500,000 
Employers Liability coverage. All insurance provided 
by Contractor shall be primary and noncontributory as 
lo insurance of the additional insureds. Coverage 
shall be on an occurrence basis, with the products 
and completed operations coverage to be maintained 
for no less than three years after substantial 
completion. No less frequently than annually or with 
such greater frequency as Woodgrain may 
reasonably request or as may be dictated by 


circumstances, including upon any change in any 
required insurance carried by Contractor, Contractor 
will furnish Woodgrain with certificates of insurance 
showing such coverages and naming Woodgrain as 
an additional insured and evidence of payment of all 
required premiums. X Each certificate must have a 
minimum 30-day written cancellation notice clause in 
favor of Woodgrain and be in form reasonably 
acceptable to to Woodgrain. 


B. INDEMNITY. Contractor wil on demand 
indemnify and hold harmless Woodgrain and its 
affiliates and representatives from all "losses" (as 
defined below) that any of them may incur arising out 
of the services provided by Contractor under the 
Contract Documents, or Contractor's failure to comply 
with any provisions of the Contract Documents. For 
this purposes, "losses" shall mean any damages, 
losses, deficiencies, actions, suits, fines, penalties, 
proceedings, judgments, costs or expenses, including 
reasonable attorneys’ fees. Contractor's indemnity 
obligations shall survive termination of this 
Agreement. 


9. CHANGE ORDERS. Changes in the services 
required under any Work order are within the general 
scope of this Agreement and may be accomplished 
by Change Order without invalidating this Agreement. 
A Change Order is a written agreement issued after 
execution of this Agreement and the issuance of a 
Work Order by Woodgrain, and signed by Woodgrain 
and Contractor, stating their agreement upon a 
change and adjustment in the Work Order and/or in 
ihe rates set forth in Exhibit "A". 


10. RESTRICTION ON TRANSFER. This 
Agreement and the other Contract Documents are 
personal to Contractor. Contractor shall not sub- 
contract, delegate, assign or otherwise transfer any 
interest in or obligations under this Agreement without 
the prior written consent of Woodgrain, which may be 
withheld in Woodgrain's sole discretion. 


11. RELATIONSHIP OF PARTIES. Woodgrain 
and Contractor agree that Contractor is an 
independent contractor, and under no circumstance 
shall the Contract Documents or the relationship 
between the parties be construed as creating a joint 
venture, partnership, agency or an employer- 
employee relationship. 


12. TERM. This Agreement will commence on the 
dale hereof. The arrangements contemplated by the 
Contract Documents shall be terminable by mutual 
agreement of the parties and may be terminated 
unilaterally by either of the parties, with or without 
cause, and for any reason or no reason, by 30 days' 
advance written notice of terminalion to the other. 
Any such termination shall be effective on the date 30 
days after the effective date of such notice under 
Section 13 or any later effective dale specified in such 
notice. Upon termination, Contractor shall be entitled 


Boise-166066.1 0010807-00001 


Woodgrain Millwork Field SVC Manual 12/05 


to payment for ail completed services prior to the 
effective date of termination. 


13. NOTICES. Notices under this Agreement shall 
be in writing, effective when delivered, or if mailed, 
affective on the third day after mailed postage prepaid 
to the address for the party stated in this Agreement, 
or to such other address as either party may specify 
by notice to the other. 


14. ATTORNEYS’ FEES. In the event suit or 
action is instituted to interpret or enforce the terms of 
the Contract Documents, the prevailing party shall be 
entitled to recover from the other party such sum as 
the court may adjudge reasonable as attorneys' fees 
at trial, upon appeal and on any petition for review, in 
addition to all such sums provided by law. 


15. CONFIDENTIALITY. Contractor agrees not to 
disclose any information regarding past claims or 
known product problems affecting Woodgrain or its 
business to any customer. The confidentialily 
obligations of this Section 15 shall survive termination 
of this Agreement. 


16, APPLICABLE LAW. This Agreement shall be 
governed and controlled by the laws of the State of 
Idaho, without regard to its conflicts of laws principles. 


17. EXECUTION. This Agreement and the other 
Contract Documents may be executed in one or more 
counterparts, each of which shall be deemed an 
original and all of which together shall constitute one 
and the same instrument. Any counterpart may be 
delivered by facsimile transmission. 


WOODGRAIN MILLWORK, INC, 
By: 
Title: 


Address for Notice: 





Print or Type Name of Contractor 


Signature 


Title (if applicable) 


Address for Notice: 





EXHIBIT "A" 
SCHEDULE FOR LABOR RATES 
1. Labor Rates: 
The hourly labor rate(s) charged by Contractor to Woodgrain shall be as follows: 
Hourly travel rate: $ 
Hourly on-site rate (technician) $ 


Hourly on-site rate (technician's helper): $ 


2. Mileage Rate: 3 per mile 


3. Additional Charges / Provisions: 


Contact Information; 


Billing Address: 








City: State Zip 


Shipping Address: 








Cit; — | State— Zip 


Business Phone ( ) Mobile Phone { ) 


Woodgrain Millwork Field SVC Manual 12/05 


A 


woodgrain millwork 


RELEASE AGREEMENT 


This Release Agreement ("Agreement") is entered into between 

(“Complainants”) and Woodgrain Millwork Ine., (“Woodgrain Millwork”) on the date specified below. 
RECITALS 

WHEREAS, Complainant's have a complaint against Woodgrain Millwork of 1001 Ed Rutherford Rd, 
Greenville, Texas 75401. concerning Patio Doors purchased by the Complainants. 

WHEREAS. Complainants were seeking repairs of alleged warranty defects in the Patio Doors 
purchased by the Complainants’. 

WHEREAS, in order to avoid the expense. inconvenience, uncertainty and distraction of litigation, 
Complainants have agreed to accept the completed field repairs and further have agreed to withdraw their complaint in 
order to resolve all claims between the parties that were or that could have been raised, and to release fully, finally and 
completely all such claims: 

NOW. THEREFORE, for and in consideration of the mutual covenants, releases and conditions 
contained herein. the receipt and sufficiency of which hereby is acknowledged. Complainants and Woodgrain Millwork 
hereby agree as follows: 
|. Complainants completely RELEASE, ACQUIT AND FOREVER DISCHARGE Woodgrain Millwork, and its divisions, subsidiaries, parent 
corporations, in interest and assigns ("Released Parties") from any and all claims, demands, obligations, actions, causes of action, rights, damages or 
expenses of any nalure whatsoever, which are the subject of the above-referenced matter, including without limitation, all known claims for property 
damage, manufacturing defects, replacement costs, warranty claims, or other expenses of any kind relating to any product manufactured or supplied by 
the Released Parties. 

2. Upon execution of this agreement, Complainants agree that the issues conceming patio doors purchased by Complainants’ are withdrawn and this 
matter has been settled. 

3. Complainants understand and agree that the completed field service work is the sole consideration for this Agreement, that the consideration stated 
herein ts contractual and not mere recital, and that all agreements and understandings of the parties are embodied and expressed in the Release, and thai 
no representation of any kind was made to Complainants with respect to this settlement by Woodgrain Millwork, Woodgrain Millwork's counsel. or 
anyone acting on behalf of Woodgrain Millwork further acknowledge that they are executing this Agreement of their own free will and with complete 
understanding of the legal consequences of same. 

4. This Agreement shall be construed and interpreted in accordance with the laws of the State of Texas. 

5. Complainants acknowledge that this Agreement constitutes the entire agreement between Complainants and the Released Parties and shall be binding 
upon and inure to the benefit of the executors, administrators, personal representatives, heirs, successors and assigns of each. Complainants further 
acknowledge that this Agreement may not be altered or amended without written consent from all parties. 

ú. lt is understood and agreed that this Agreement may be executed in a number of identical counterparts, each of which shall be deemed original for all 
purposes. 


WE HAVE READ THIS SETTLEMENT AGREEMENT CAREFULLY AND FULLY UNDERSTAND ALL 
TERMS SET FORTH THEREIN AND AGREE TO ABIDE BY SAME. 
SIGNED this day of 20 — 


Complainants' Signature 


Woodgrain Millwork Field SVC Manual 12/05 5 


3700 Enterprise Drive 


^ Greenville, Texas 7540] 


Phone: (800) 935-2000 
—— L Fax (20463720724 
woodgrain millwork cce tiles 


Atrium Patio Door Field Inspection Form 
In Store Inspections use Pg. 1 All Field Inspections Use Pgs.1& 2 


Date: By: 

Store 5 

Purchase: Installation: Contact: 

Units Involved: Prep Code: PO& 
Code Night: 


PRODUCT - CHECK APPROPRIATE BOXES SPECIFICATIONS 


02 PNL CS 22 PNL JH 73 PNL ES. O Other E Unit Height: D6'8" D 
Handing: — — 611” 0o80" 
C2PNL D4PNL C Other Specify Sueco O1-Lt DACL OWD Grille GFlat Int O 
CLASSIC Handing: Cont int 
| ing: O Lo E Plus 
-— 
i : OColor 













PRO SLIDER OFXD OCLAD Other Specify: Exterior OWH OST OET OGR OBZ 
Handing: Color OUNFINISHED 


TRANSOM ORECT OHALF ROUND GELLIPTICAL ac: O Colonial O Prairie Ci Plaza 


MCLAD O Factory Mulled J Field Mulled Number of lites | | 


GENERAL PROBLEMS: OSEAL FAILURE OWARPING DHARDWARE GLEAKS 
-INSTALLATION 





DESCRIPTION OF PROBLEM: 


Draw Diagram of customers unit showing reported problem 


Woodgrain Millwork Field SVC Manual 12/05 6 


Atrium Patio Door Field Inspection Form 


Page 2 


Customer Name: 


Y N Door Operation 
Jats sill straight? 
«ls unit plumb? Cheek all jambs and mull posts 
Is unit square? 
—Jl als lock margin constant 1/8? 
[ . Is hinge margin constant 1/8? 
—L Are jambs/header jamb bowed? CO IN? CJ OUT? 
< JLZIf ves, were shims or long screws used to correct the bow? 
—f Is measurement from sill to head jamb the same at 
hinge and lock location? If no. give exact 
measurement at: 
LOCK HINGE 
7 3C 3Is head and sill the same length? If no, give exact 
measurement at: 
HEAD SILL 
"| Is hinge stile at fixed panel plumb? 
i Where does operating door hit or bind? 
Clock jamb Clhead jamb Ohitting at lock Clpanel 
Khinge bind Cthreshold Olwicking pads Llastragal 
Ciweather-strip 
4 Does slider lock rail have an even vertical reveal with door 
jamb? 
—J( Does slider lock easily? 
i Does the slider panel move when locked? 


Ticket Number 


Y N Warp 
OO Was 60" straight edge or taught string used to determine 
arp? If no. What was used: 
CC Does panel bow at OTOP? BOTTOM? 
Olis unit plumb? Check all jambs and mull posts 
CC Are the face of hinges flush w/surface of stile edges? 
(CC Are the fixed and operating panels flush at hinge stiles? 
Operating Panel width: 
TOP MDL BTM 
[LOC Is exterior (Unfinished) properly painted? 
OO ls exterior (Unfinished) properly stained? 
C JC JIs ext. (Unfinished) sealed w/polurethane? 
(2C Is interior properly painted? 
C OC Is interior stained? 
[ J( JIs interior stain covered w/polurethane? 
Ois exterior paint/stain lapped onto glass? 
(JC Is interior paint/stain lapped onto glass? 
L JL JAre TOP and sides of panels painted/stained? 
[JL Ts ext. perimeter of glass cap beaded? 
Grilles/ACL 
OC are egrilles‘ACL correct width? OToo narrow? OWrg Sz.? 
are grilles/ACL correct height? OToo shot? O)Wrg Sz.? 
LOCIDo ACL bars line up with internal mill bars? 
DODo ACL bars line up with other panels in unit? 


I .. Were shims placed behind hinges and every location where long |LOCDAre ACL bars level? 


screws were placed thru the frame into the wall studs? 


Seal Failure 


—~i_JOn units where panels were hinged off of the jambs that butt azai OOs moisture between the insulated glass? 


the wall, were 2-1/2" screws used at | screw location of each hinge? 


— _ JDoes water show in the interior, at the bottom of the glass? 
— I Are wicking pads installed on swing units? 


[Lis moisture on interior glass surface? 
Hardware 
C Is lever hard to move? 
LOC Does lever return to position? 


. 4 ]Does air/water come in below the sill because there is no sealant? |DOCODoes multipoint mechanism move? 


— Does air come in at sliding door interlock? 

< .ls swing/sliding (APS) door sweep intact? 

—.. Are jamb weather-strips in place? 

E ils sliding panel adjusted up? 

ls sliding door sill interlock neoprene block in place? 


w JIs sliding door sill interlock wicking pad in place (Unfinished)? 


Parts required to solve situation (Quantity and Specifics) 


Name of Representative: 


| JC Does lock engage head and sill? 

Does slider lock engage jamb strike? 

COC Do latch bolts bind with strikes. if so where: 

CJC) Was handleset installed so tight that it effects locks 


operation? 





Woodgrain Millwork Field SVC Manual 12/05 


IN 
| _ 
woodgrain millwork 


ATRIUM PATIO DOOR WARRANTY 


The Limited Warranty protection provided here under shall extend only to the first retail 
purchaser and/or original homeowner. 


LIMITED WARRANT Y 


Woodgrain Millwork, warrants, subject to the conditions and restrictions stated below, 
that its products and components thereof shall be free from defects in materials and 
workmanship at the time of shipment from our mill in Greenville, Texas for a period of 
one (1) year from date of purchase, provided the Atrium Door unit was strictly 
maintained, stored, finished and installed in accordance with Woodgrain Millwork's 
written instructions that accompany each product. 


INSULATED GLASS - 20 YEARS 


Woodgrain Millwork warrants the insulated glass in our patio doors shall be free from 
manufacturing defects for a period of 20 YEARS from the date of manufacture. Our 
insulated glass is warranted not to develop, under normal conditions, any material 
obstruction of vision as a result of manufacturing defects or a premature failure of the 
edge seal. This limited warranty does not apply to special glazings, and glass not factory 
installed by Woodgrain Millwork. If any repair or replacement is necessary, such repair 
or replacement is warranted for the remainder of the applicable warranty period. 


EXTERIOR PAINTED ALUMINUM SURFACES - 10 YEARS 


Woodgrain Millwork warrants that the paint on the exterior of aluminum clad products will 
not, under normal atmospheric conditions, peel, check, crack, or flake for a period of 10 
YEARS from the date of manufacture. The paint performance will vary depending on 
installation in heavy salt spray environments, elevation, orientation, altitude and other 
atmospheric conditions. Paint surfaces will weather over time. To prolong the life and 
appearance of the paint coating, it is recommended that exterior cladding be cleaned 
any time the exterior glass is cleaned. See your Woodgrain Millwork distributor for a 
copy of the maintenance and cleaning instructions, or refer to AAMA 610.1-79. If a paint 
failure should occur, Woodgrain Millwork reserves the right to determine the best method 
for corrective action. 


HARDWARE AND ALL OTHER COMPONENTS - 1 YEAR 


Woodgrain Millwork Field SVC Manual 12/05 


Woodgrain Millwork warrants that hardware and other components shall be free from 
defects, under normal conditions, for a period of 1 YEAR from the date of manufacture. 
Woodgrain Millwork will provide replacement parts, free of charge during the warranty 
period. Since we purchase many of these items from other manufacturers, we cannot 
guarantee that the exact model or design of hardware will be available in the future, and 
usually, the then current model will be provided. Any components or product repaired or 
replaced are warranted for the remainder of the original warranty period. 


This Limited Warranty will be voided and of no force and effect by any of the following 
conditions: 


* Improper installation of the door unit 

* Installation in a non-vertical or sloped application 

« Damage from accident, misuse or abuse 

« Alteration or use for a purpose other than that for which it was intended 

e Application of any tint, UV limiting, or sun blocking film to the interior or exterior of 
the glass 

» Use of film shades 

* Use in or around ships, boats, trailers, campers, swimming pools, saunas or 
greenhouses 

* Installation above 5,000 ft. above sea level, unless high altitude breather tubes have 
been factory installed 

* Failure to properly finish all wood exterior surfaces and all interior surfaces within 30 
days of purchase according to Woodgrain Millwork's written finishing instructions 
that accompany every unit. 

« Failure to regularly clean exterior cladding when product is installed in a corrosive 
environment. 

* Exposure to harmful chemicals. 

+. Field mulling (connecting of units). 


EXCLUSIONS 
The following items are not warranted: 


1. Any labor for repair or replacement of defective parts or glass or any repainting or 
refinishing 

2. Freight; replacement parts will be shipped to the closest distributor at Woodgrain 

Millwork's expense or to the homeowner at their expense 

Glass breakage, including stress cracks 

Brass Hardware finishes 

Wood texture, color variations and other wood characteristics within Woodgrain 

Millwork's specifications. 

6. Natural warping of wood components unless the "warp" exceeds 1/4", warp includes 

bow, cup and twist. 

Normal weathering or wear and tear 

Swinging doors over 7 ft. tall without factory installed multi-point locking hardware 

Any special product or item which manufactured according to specifications 

provided by the customer 


cn B o 


ub ues 


Woodgrain Millwork Field SVC Manual 12/05 


10. Any product in a size which is greater than that shown in our catalog: these products 
are purchased "as is" without warranty 
11. Product purchased without factory installed glazing; these products are purchased 
"as is" without any warranty 
12. Problems due to improper maintenance, installation, or application. 
13. Any product installed in structures that do not allow for proper drainage such as 
Exterior Insulation Finish Systems (EIFS). 
14. Any consequential, incidental, special or punitive damages. 
15. Products manufactured by others. 
16. Corrosion, tarnishing or operation of standard hardware in high salt spray 
environment. 
17. Damage caused by or adjustment required as the result of: 
a. Improper handling, installation or maintenance and/or during delivery by others. 
b. Exposure to conditions beyond performance specifications and/or design 
limitations. 
c. Water infiltration other than as a result of manufacturing defects. 
d. Condensation 
e. Glass damage caused by others (i.e.. brickwash, sanding or improper 
cleaning/washing) 
f. Damage to metal or other surfaces by brickwash, chemicals, or airborne 
pollutants. 
g. Catastrophic weather or acts of God, including fire, wind or wind-blown objects. 


LIMITS OF LIABILITY 


This warranty is in lieu of all warranties, express or implied, including any implied 
warranties of merchantability or fitness for a particular purpose. 


No distributor, dealer, employee, salesperson, or representative of Woodgrain Millwork 
has any authority to modify this warranty in any way. 


Woodgrain Millwork is not liable for any consequential, incidental, special or punitive 
damages, costs of installation of replacements or costs of refinishing of door 
components or adjacent parts/millwork. Final determination of whether or not a defect 
exists shall be made by Woodgrain Millwork. 


Woodgrain Millwork, at its sole discretion, may repair or replace the defective part or 
product or refund the original purchase price. 


We reserve the right to perform the warranty work or arrange for another party to 
perform the warranty work. 


This warranty is only applicable in the USA and the District of Columbia. This warranty 
Is governed by the State of Texas without regard to choice of law principles. 


CLAIMS PROCEDURE 
If you have any questions regarding this warranty or have any claim under the provisions 


of this warranty. please contact Woodgrain Millwork at its Manufacturing facility, listed 
below. Claims may also be filed on line at www.atriumpatiodoor.com. You must notify 


Woodgrain Millwork Field SVC Manual 12/05 10 


Woodgrain Millwork of any defects within a reasonable period, but no later than 30 days 
after the defect is discovered or should have been discovered. 


Woodgrain Millwork 


5700 Enterprise Dr 


Greenville, TX 75402 


800-935-2000 


[email protected] 


www.atriumpatiodoors.com 


Woodgrain Millwork Field SVC Manual 12/05 1] 


Replace Swing Panel 


Standard Hinges: 


1) Assure new panel matches the size, and handing of the existing panel. 

2) Remove existing hardware. 

3) Close Door 

4) Remove pins from existing hinges starting at the bottom hinge, working your way up 
the door. 





5) Remove panel. 
6) Transfer top and bottom hinges from existing panel to the new panel in the same hinge 
location. 

7) Install new panel in frame. Set top and bottom hinge pins. 

8) Install center hinges on panel, set hinge pins. 

9) Install hardware 


Note: In case hinges do not line up, back hinge screws out 1/2 of a turn. The hinges can 
then be moved slightly. RE TIGHTEN HINGES!!! 


Caution: When installing screws do not over tighten!!! 


Adjustable Hinge: 


1) Assure new panel matches the size, and handing of the existing panel. 
2) Remove existing hardware. 

3) Support panel with wedge from bottom. 

4) Remove hinge screws ON PANEL. Remove screws from the top hinge last. 
5) Support new panel on wedge, and align hinges. 

6) Install one screw in the center hinge. 

7) Install one screw in remaining hinges. 

8) Install all remaining screws. 

9) Install hardware 

10) Adjust hinges 

Caution: When installing screws do not over tighten!!! 


Woodgrain Millwork Field SVC Manual 12/05 12 


Replace sliding panel 


1) Assure new panel matches the size, and handing of the existing panel. 
2) Slide panel open 
3) Remove phillips head screws from head stop 


Head stop must be 
removed 




















4) Slide panel closed 

5) Latch panel into strike 

6) Remove remaining phillips head screws from head stop 

7) Unlatch, tilt panel into room and remove. DO NOT SET PANEL ON ITS BOTTOM 
RAIL!!! 

8) Transfer hardware and any weatherstripping to new panel. 

9) Set new panel into opening and latch into the strike 

10) Follow steps 2 thru 6 in reverse to install head stop. 

11) Adjust door height, lock, and latch. 


Woodgrain Millwork Field SVC Manual 12/05 13 


Adjusting standard hinges 
To tighten reveal: 


1) Remove hinge pin of the hinge that needs adjustment. Further adjustment of 
adjacent hinges may be required!!! 

2) Tape the jaws on a 6" or 8” crescent wrench. 

3) Bend the barrels that are attached to the panel, towards the panel. A minimal 
amount!!! 1/16” is too much!!! Too much causes the hinges to bind. 





4) Reinsert the hinge pin 
5) Close panel and check the reveal. 


To increase the reveal: 


1) Remove the two screws closest to the barrel. 
2) Loosen the remaining screw. 





3) Place cardboard drywall shims between the hinge and the jamb (As shown) 


4) Tighten and reinstall screws. 
5) Close panel and check reveal. 





Woodgrain Millwork Fie 14 


Adjusting adjustable hinges 


When adjusting — use a hand screwdriver. Adjust the vertical margins by 
adjusting the center hinge. Adjust the horizontal margins by adjusting the 
top and bottom hinges. 


| Top hinge adjusts 
+> 


l Center hinge adjusts 


| Bottom hinge adjusts 
«4— — > 


Woodgrain Millwork Field SVC Manual 12/05 15 


Replace pro French astragal 


1) Remove secondary panel from unit. 
2) Remove plastic astragal cap from astragal. 





3) Slide aluminum astragal cap off of astragal, may require some force 
4) Remove screws that hold astragal on the panel. 
5) Repeat steps 1 thru 4 in reverse order using new parts. 


Woodgrain Millwork Field SVC Manual 12/05 


16 


Replace Design Series French Astragal 


1) Open primary panel 
2) Remove black head screws that hold the wood astragal on. 


Open primary 
panel and 
remove these 
screws on the 
secondary panel. 


3) The wood and aluminum astragals can then be removed. 
4) Install new astragal with original screws. 


Woodgrain Millwork Field SVC Manual 12/05 


17 


Replace center swing astragal 


1) Open door 
2) Insert flat screw driver between astragal and astragal cap as shown 





3) Pry astragal cap off 
4) Remove screws that hold the astragal on 





5) Remove astragal 
6) Repeat steps 1 thru 5 in reverse order to install. 


Woodgrain Millwork Field SVC Manual 12/05 18 


1) 
2) 
3) 
4) 
5) 


6) 
T) 


Replace Swing Door Sweep 


Remove panel by following panel replacement instructions. 

Pull sweep off of the panel 

Remove existing staples from the panel 

Apply 2 beads of silicone to the bottom of the panel 

Trim and/or notch sweep to fit door and not interfere with any hardware that is 
installed. 

Apply new sweep, make sure you install in same position as the original. 
Staple or screw new sweep onto panel 


7) Install panel 
Caution : Do not use screws that will damage the sill/threshold. 


Woodgrain Millwork Field SVC Manual 12/05 


19 


Replace glass 


CAUTION: Be careful not to damage the wood portion of the door panel. 


1) Remove Glazing bead carefully, MAY NEED TO BE REUSED. 

2) Inspect opening to assure that no staples are showing. If so, remove them. 

3) From exterior side, cut sealant with a razor knife or narrow and flexible putty 
knife. 

4) From the side of the door, begin working the glass loose from the top of the panel. 
Support the inside of the glass with your opposite hand. 

5) Remove existing silicone from metal glass shelf. 

6) Apply '4"bead of silicone to the metal glass shelf. 


l4" Bead of 
Silicone 





7) Reinsert black spacers, at the bottom of the glass opening, in same location where 
they were installed in the factory 





8) Set glass in opening and seat against metal glass shelf. 

9) Look thru glass to assure that silicone has sealed the glass fully against the glass 
shelf. 

10) Reinsert side and top black spacers in the same location where they were installed 
in the factory. 

11) Reinstall glazing bead, top, bottom, then the sides. Glazing bead may need to be 
trimmed or sanded to fit. 

12) Secure glazing bead with brads or staples. Caution: If the glass 1s hit with the 

13) brads or staples, it WILL SHATTER!!!! 


Woodgrain Millwork Field SVC Manual 12/05 20 


Replace ACL Bars 


1) Insert putty knife thru the double-sided tape that hold the bar onto the glass. 





3) Clean glass with razor blade and alcohol. GLASS MUST BE CLEAN AND DRY 
or new bars will not stick. 

4) Assemble bars. 

5) Dry fit bar to glass, trim if necessary. 

6) Remove blue tape backing from the first 3” of the ACL bar. 





7) Place the ACL bar on the glass. 
8) From the top of the ACL bar, begin peeling back the blue backing tape, removing 
it from the bar. 





9) Manually press HARD, the ACL bar onto the glass. 


Woodgrain Millwork Field SVC Manual 12/05 21 


Replace a sill cover 


1) Determine if astragal needs to be removed as it may be resting on top of the sill 
COVer. 

2) Insert narrow flat bar or wide tip flat screw driver between sill cover and sill. Pry 
sill cover up to remove. If the sill cover releases, proceed to step 5. 

3) Insert Phillips screw driver into weep 





4) Tap screw driver to release the sill cover 





5) Set sill cover into position on sill. 
6) Apply ample pressure to snap sill cover into place. 


Woodgrain Millwork Field SVC Manual 12/05 22 


Replace bottom rail weatherstripping on an active slider 


Remove operable panel 

Rest panel on its side stile 

Remove existing screws 

Remove weather stripping 

Clean any tape residue off of the panel 

Remove protective tape from adhesive tape on new weathestripping 
Apply new weather strip to panel 

Insert existing screws thru channel into the panel 

Reinstall panel. 


Woodgrain Millwork Field SVC Manual 12/05 


23 


Replacing a keyed cylinder on a swing door 


1) Remove allen set screw on the exterior lever. 

2) Remove interior escutcheon plate screws 

3) Remove exterior escutcheon plate 

4) From back side of the handleset. Remove bracket that holds the keyed cylinder in 
place. 

5) Remove keyed cylinder. 

6) Repeat steps 1 thru 5 in reverse to reassemble. 





Woodgrain Millwork Field SVC Manual 12/05 24 


Replacing a keyed cylinder on a sliding door 


1) Remove interior escutcheon plate screws. Hold escutcheon plate in place while 
removing screws. 
2) Remove exterior escutcheon plate 
3) From back side of the handleset. Remove bracket that holds the keyed cylinder in 
place. 
4) Remove keyed cylinder. 
Repeat steps 1 thru 5 in reverse to reassemble. 





Woodgrain Millwork Field SVC Manual 12/05 23 


Replace swing handleset 


1) Remove allen set screw on the exterior lever. 
2) Remove interior escutcheon plate screws 

3) Remove handleset 

4) Repeat steps 1 thru 3 in reverse to reassemble 





Woodgrain Millwork Field SVC Manual 12/05 


26 


Replace Sliding handleset 


1) Support handleset on the exterior of the unit 
2) From the inside, remove screws that hold the faceplace on. 


3) Remove handleset 
4) Repeat steps 1 thru 3 in reverse to reinstall 






Woodgrain Millwork Field SVC Manual 12/05 


PA 


Replace interlock weatherstripping 


Caution: Do not damage bottom weatherstripping!!! 


1) Remove operable sliding panel 

2) Lay panel on lock side 

3) Remove screws that hold the interlock in place 
4) Remove existing interlock 

5) Repeat steps | thru 4 in reverse. 


Woodgrain Millwork Field SVC Manual 12/05 


28 


1) 


3) 
4) 
5) 
6) 


7) 


8) 
9) 


Pull here to extend 
latch bolt 


Replace multipoint lock (Primary panel) 


Open panel 

Remove handleset (See replacing swing handleset instructions) 

Remove Phillip Head screws ONLY in the edge of the panel. 

Remove lockest 

Place new lockset into edge of door. 

Place exterior trim assembly into lockset. THIS LOCATES THE LOCK IN THE 
DOOR. 

Replace Phillips head screws in the edge of the door. Leave the top two screws 
out... 

Lift handle to lock. 

Extend the lock extension 





11) Install remaining screws 
12) Reinstall Handleset (See replacing swing handleset instructions) 
13) Operate lock assembly to assure it works. 


Woodgrain Millwork Field SVC Manual 12/05 29 


Adjust multi point lock (Sidelite) 


1) Open panel 
2) Insert allen wrench into roller pin. 
3) Rotate wrench to adjust. 


Insert allen I 
wrench and 
turn to adjust a 
vertically and 
horizontallv. 





Woodgrain Millwork Field SVC Manual 12/05 


30 


1) 
3) 


4) 


Adjusting roller: 


Remove white caps on bottom of panel 

Insert screw driver into roller 

Turn screw driver to raise or lower rollers in panel, until panel and strike jamb are 
parallel 

Replace caps 








From the inside of 
the operating panel, 
remove the white 
caps and turn the 
adjustment screws. 


Woodgrain Millwork Field SVC Manual 12/05 31 


Adjust sliding door latch 


1) Open panel 
2) Turn screw in edge of lock to move latch towards or away from the jamb 


Turning the 
screw in the 
lockset moves 
the latch closer 
or farther away 
from the panel. 