DTIC AD0867022: Arctic Environmental Test of Water Handling, Water Storage and Water Purification Equipment

Survival, Water, Medical Field Manuals

Military Manuals

Defense Technical Information Center

Document text

UNCLASSIFIED 


AD  NUMBER 


AD867022 


NEW  LIMITATION  CHANGE 
TO 

Approved  for  public  release,  distribution 
unlimited 


FROM 

Distribution  authorized  to  U.S.  Gov't, 
agencies  and  their  contractors; 
Administrative/Operational  Use;  26  NOV 
1969.  Other  requests  shall  be  referred  to 
US  Army  Test  and  Evaluation  Command,  Attn: 
AMSTE-TS,  Aberdeen  Proving  Ground,  MD 
21010. 

AUTHORITY 


USATEC  ltr,  14  Dec  1970 


THIS  PAGE  IS  UNCLASSIFIED 


26  November  1969 


Materiel  Test  Procedure  8-4-014 
U.  S.  Army  Arctic  Test  Center 


OV 


U.  S.  ARMY  TEST  AND  EVALUATION  COMMAND 
ENVIRONMENTAL  TEST  PROCEDURE 

ARCTIC  ENVIRONMENTAL  TEST  OF 
WATER  HANDLING,  WATER  STORAGE 
AND  WATER  PURIFICATION  EQUIPMENT 


LJ 


Cs* 


OBJECTIVE 


B 


The  objective  of  the  procedures  outlined  in  this  MTF  is  to  provide 
a  means  of  evaluating  the  performance  and  safety  characteristics  of  water 
handling,  water  storage,  and  water  purification  equipment  (including  associated 
•tools  and  equipments),  under  arctic  winter  environmental  conditions. 


00 


BACKGROUND 


£ 


Valid  comparisons  of  different  designs  are  necessary  to  insure 
selection  of  the  most  suitable  water  handling,  water  storage  and  water 
mrification  equipment  for  U.  S.  Army  use.  This  MTP  provides  uniform  test 
rocedures  for  guidance  of  all  USATECOM  agencies  concerned  with  the  preparation 
of  test  directives,  test  reports,  test  plans  and  the  conduct  of  tests  for 
water  handling,  storage  and  purification  equipment  in  the  arctic.  Testing 
in  a  natural  arctic  winter  environment  is  used  to  substantiate  or  supplement 
data  obtained  during  the  Engineering  Design  and  Engineering  Test  Phase. 

Testing  in  the  arctic  generally  is  not  authorized  until  data  from  simulated 
environmental  tests  provides  reasonable  assurance  that  the  test  item  will 
function  satisfactorily  when  subjected  to  the  conditions  that  would  be 
encountered  in  the  Arctic. 


3.  REQUIRED  EQUIPMENT 

a.  Appropriate  Arctic  Winter  uniforms. 

b.  Vehicles  (cargo). 

c.  Still  cameras  with  associated  photographic  equipment  (black  and 
white  or  color) . 

d.  Meteorological  support  instrumentation. 

e.  Flowmeter. 

f.  General  and  special  tools  (and  ancillary  items)  to  perform 
required  maintenance;  to  uncrate  and  crate;  and  to  load  and  handle  the  test  item. 

g.  Test  equipment  to  analyze  the  quality  of  the  water. 

4.  REFERENCES 

A.  AR  705-15,  Operations  of  Materials  Under  Extreme  Conditions 
of  Environment. 

B.  AR  705-5,  Army  Research  and  Development. 

C.  AR  70-8,  Human  Factors  and  Social  Science  Research. 

D.  AR  70-10,  Army  Materiel  Testing. 

E.  AR  750-6,  Maintenance  Support  Planning. 

F.  USATECOM  Regulation  705-2,  Documenting,  Teat  Plans  and  Reports. 


-1- 

-Ur— I  Hy  i;-  ■ 

clearinghouse 

If,,  r !.  - 1 1  ft  1  -  •  C  i :  1 1 1 '  • ;  I 

Infvr.T.  .hr  n  i  ''  >  ''"•'I 


I 


> 


( 


MTP  8-4-014 
26  November  1969 


G.  USATECON  Regulation  350-6,  Training  in  New  cr  Modified 
Equipment  and  Training  Devices. 

H.  MTP  10-4-500,  Arctic  Preoperational  Inspection.  Physical 
Characteristics,  Human  Factors,  Safety  and  Maintenance  Evaluation. 


5.  SCOPE 

5 . 1  SUMMARY 


The  procedures  outlined  in  this  MTP  are  designed  to  determine  and 
evaluate  the  perf Prmance  and  safety  characteristics  of  water  handling,  water 
storage,  and  water  purification  equipment. 

The  sped  .  tests  to  be  performed  and  their  intended  objectives 
are  listed  below. 

a.  Preoperational  Inspection  and  Physical  Characteristics  -  This 
subtest  provides  for  an  inspection  of  the  test  item  to  determine: 

1)  If  the  test  and  comparison  items  are  in  proper  condition 
for  testing. 

2)  If  the  test  items  physical  characteristics  conform  to 
applicab!  criteria. 


b.  Transportability  -  The  objective  of  this  subtest  is  to  determine 
if  the  test  item  (and  its  accessories)  can  be  handled  and  transported  under 
arctic  winter  environmental  conditions,  and  to  ascertain  the  extent  of  damage 
from  transport  over  secondary  and  cross  country  roads. 

c.  Installation  -  The  objective  of  this  subtest  is  to  determine  if 
the  test  item  can  be  installed  under  arctic  environmental  conditions  and 

what  special  tools,  materials,  or  procedures  are  required  for  various  installa¬ 
tions. 

d.  Functional  Suitability  -  The  objective  of  this  subtest  is  to 
determine  the  suitability  of  the  test  item  for  use  by  the  U.  S.  Army  under 
Arctic  environmental  conditions.  The  operational  characteristics  are  tested 
under  various  demand  rates,  and  the  performance  of  the  Ce3t  item  is  evaluated 
by  its  ability  to  provide  palatable  water,  in  the  volume  specified. 

e.  Human  Factors  Evaluation  and  Safety  -  The  objective  of  this 
subtest  is  to  determine  if: 


1)  The  test  item  is  compatible  with  the 
limitations  of  persons  who  will  operate  and  maintain  it 
environmental  conditions. 

2)  The  test  item  is  safe  for  U.  S.  Army 
environmental  conditions. 


skills,  aptitudes, 
under  arctic 

use  under  arctic 


f.  Maintenance  Evalua 
determine  if  the  test  item  meets 
requirements,  as  well  as  durabili 
TC's,  MC's  or  other  established  c 


tion  -  The  objective  of  this  subtest  is  to 
the  required  maintenance  and  maintainability 
ty  requirements  as  defined  by  QMR’s,  SDR's, 
riteria  under  arctic  environmental  conditions. 


)  * 


-2- 


. . .  . . , . . . . k kki . . . . . . . . . . . . . . *■»•»■»»■ 


I 


s 


STAT230SN2  #2  0NCI»ASSIFIED 


This  document  is  subject  to  special  export  controls  an 

transmittal  to  foreign  governments  or  foreign  j  -re 

^mede  only  -1th  prUr  approval  of  . 

Site*  LC4t±  X/<  e  *<■ ' ^ 


> 


MTP  8-4-014 
26  November  1969 

' )  i  y  5 


5.2 


LIMITATIONS 


This  KTP  is  limited  to  general  procedures  for  arctic  environmental 
testing  applicable  to  all  water  handling,  water  storage,  and  water  purifica¬ 
tion  equipment. 


6.  PROCEDURES 

6.1  PREPARATION  FOR  TEST 

a.  Since  arctic  winter  environmental  tests  are  normally  scheduled 
from  October  through  March  (6  months),  ensure  that  the  test  items,  test 
comparison  and  support  weapons  are  delivered  to  the  Arctic  Test  Center  prior 
to  1  October. 

b.  Ensure  that  all  teat  personnel  are  familiar  with  the  required 
technical  and  operational  characteristics  of  the  item  under  test,  such  as 
stipulated  in  Qualitative  Materiel  Requirements  (QMR),  Small  Development 
Requirements  (SDR),  and  Technical  Characteristics  (TC),  and  record  this 
criteria  in  the  test  plan.  Assigned  personnel  will  prepare  the  plan  of  teat, 
supervise  the  conduct  of  test,  collect  test  data,  and  report  the  results  of 
the  test.  MOS  of  assigned  personnel  shall  include  7010,  12B  and  51N. 

c.  TDY  personnel  shall  be  used  to  augment  assigned  personnel  and 
shall  be  trained  to  the  degree  that  they  are  as  proficient  on  the  individual 
weapons  as  the  troops  who  will  use  the  weapon.  MOS  of  assigned  personnel  will 
include  5  IN  and  12B. 

d.  Review  all  instructional  material  issued  with  the  test  item  by 
the  manufacturer,  contractor,  or  government,  as  well  as  reports  of  previous 
tests  conducted  on  the  same  type  of  equipment,  and  familiarize  all  teat  per¬ 
sonnel  available  for  reference. 

e.  Record  the  grade,  MOS,  background,  and  training  of  all  test 
personnel  and  ensure  chat  all  personnel  receive  new  equipment  training  (NET). 

f.  Record  the  following  information: 


1)  Nomenclature,  serial  number(s),  and  manufacturer's  name  of 
the  test  items. 

2)  Nomenclature,  serial  number(s),  accuracy  tolerances, 
calibration  requirements,  and  last  date  calibrated  of  the 
test  equipment  selected  for  the  tests. 


g.  Select  test  equipment  ideally  having  an  accuracy  10  times 
greater  than  that  of  the  function  to  be  measured. 

h.  Prepare  record  forms  for  systematic  entry  of  data,  chronology 
of  test,  and  analysis  in  final  evaluation. 

i.  Prepare  adequace  safety  precautions  to  provide  safety  for 
personnel  and  equipment,  and  ensure  that  all  safety  SOP's  are  observed 
throughout  the  test. 

J.  Prepare  a  test  schedule  to  include  all  subtests  to  be  conducted, 
detailing  the  minimum  time  required  to  complete  each  subtest  and  estimatin' 
the  net  testing  tima  required. 

k.  Record  the  prevailing  meteorological  conditions  and  ensuri 
the  environmental  conditions  are  suitable  for  testing. 


-3- 


. ^*M^*m*  ti&mmmim*****"*^ 


MTP  8-4-014 
26  November  1969 


6.2  TEST  CONDUCT 


6.2.]  Preoperatlonal  Inspection  and  Physical  Characteristics 

a.  Upon  receipt,  carefully  inspect  the  test  and  comparison 
Items  and  their  shipping  containers  for  completeness,  damage  and  general 
condition  in  accordance  with  the  applicable  section  of  MTP  10-4-500. 

6.2.2  Trans portabili tv 

a.  Determine  that  all  test  (and  comparison  items)  are  in  good 
condition,  with  all  parts  secure  and  ready  for  transport.  Crate  the  test 
items  if  required. 

b.  Select  handling  gear  in  accordance  with  applicable  technical 
manuals  and  load  the  test  items  on  suitable  trucks. 

c.  Transport  the  test  items  over  secondary  and  cross  country 
trails  for  a  minimum  of  50  miles.  Note  ambient  air  temperature  during 
transport. 

d.  Offload  the  test  items  (uncrating  where  necessary),  and 
carefully  inspect  for  damage  resulting  from  transport. 

e.  Record  the  following  data: 


1)  Description  of  manpower  and/or  equipment  plus  the  time 
required  to  prepare,  load  and  off-load  the  test  item 
from  the  vehicle. 

2)  Maximum  and  minimum  ambient  air  temperatures  during 
transport. 

3)  Mileage  accumulated  and  road  conditions. 

4)  Difficulties  encountered  during  load,  off-loading  and 
transport. 

5)  Damage  which  resulted  from  transport. 

6)  Malfunctions. 

7)  Results  of  inspection. 

6.2.3  Ins tallation 


NOTE:  The  following  procedure  applies  to  the  installation  of 
water  purification,  water  storage  reservoirs  and  water 
handling  equipment. 

a.  Prepare  the  installation  site  to  receive  the  test  item  and 
ensure  that  all  tools  and  handling  equipments  necessary  for  the  installation 
are  available. 

b.  Provide  a  suitable  shelter  and  heating  equipment  to  ensure 
a  constant  temperature  above  32°F. 

NOTE:  Shelter  must  be  provided  for  certain  equipments  since 
they  cannot  operate  below  the  freezing  temperature  of 
water.  Other  test  items,  however,  which  w<~  'c  normally 
be  placed  in  an  unsheltered  environment  suci  as  large 
storage  tanks,  should  not  be  sheltered  for  the  test. 


MTP  8-4-014 
26  November  1969 


c.  Set  up  the  test  item  in  accordance  with  the  instructions 
contained  in  the  technical  manual. 

d.  Measure  the  local  air  temperatures  and  wind  velocities 
during  preparation  and  installation  of  equipments. 

e.  Record  the  following  data: 

1)  Ambient  air  temperatures  and  wind  velocity. 

2)  Type,  quantity  of  special  equipment,  and  special  skills 
required  for  installation. 

3)  Number  of  men  and  time  required  to  assemble  and  install 
the  test  item. 

4)  All  difficulties  encountered  during  assembly  and 
installation. 

5)  Description  of  ground  surface  and  dimensions  of  the 
completed  site. 

f.  Photograph  the  test  site  and  installation.  Annotate  the 
photographs  to  indicate  sequence  of  assembly. 


6.2.4 


Functional  Suitability 


6.2.4. 1  Water  Purification  Units 

a.  Following  initial  installation,  operate  the  test  item  in 
accordance  with  instructions  in  the  technical  manual.  Throughout  the  test 
measure  the  flow  rate  and  amount  of  water  processed.  (Using  a  flow  meter). 

NOTE:  During  initial  operation  check  all  components  ar.d 

connections  to  insure  compatibility  with  related  equipment. 

b.  During  the  operation  of  the  purification  unit  vary  the  flow 
to  determine  if  coagulation,  filtration,  and  chlorination  process  can  be 
adjusted  to  change  raw  water  quantity  characteristics  without  interruption 
of  flow. 

c.  Periodically  (at  least  once  each  hour)  draw  water  samples 
from  the  input  source  (inmediately  proceeding  the  test  item)  and  from  the 
effluent  stream. 


NOTE:  These  samples  will  be  used  to  determine  if  the  purification 
unit  meets  current  radiological  standards  for  water 
and  chemical  standards  developed  by  the  Surgeon  General. 

d.  Stop  and  restart  the  purification  unit  at  least  once  every 
two  hours.  Note  any  problema  in  restarting  and  determine  if  the  quality 
of  the  water  varies  during  this  cyclic  process. 

NOTE:  The  stop  and  start  cycle  simulates  the  fluctuation  of 

water  production  that  may  be  required  by  variable  water 
demand  in  field  locations. 


-5- 


MTP  8-4-014 
26  November  1969 


e.  Expose  Che  purification  unit  to  temperatures,  which  approach 
the  lower  temperature  limits  of  the  equipment.  Note  any  operational  changes 
or  problems. 

f.  Record  the  following  data: 

1)  Malfunctions  or  failures  of  the  test  item. 

2)  Ambient  air  and  water  temperatures. 

3)  Total  ’aliens  of  water  pumped  through  the  test  item. 

4)  Average  pumping  rate. 

5)  Total  hours  of  operation. 

6)  Number  of  samples  taken,  noting  the  time  and  conditions 
at  the  time  the  samples  were  taken. 

7)  Corpatibility  of  test  item  with  related  water  purifica¬ 
tion  equipment. 

6.2.4. 2  Water  Storage  Reservoirs  and  Water  Handling  Equipment 

a.  During  filling  and  drawoff  operations  periodically  interrupt 
the  pumping  and  vary  the  flow  rate.  Note  any  effects  or  operational  problems 
caused  by  the  flow  fluctuations. 

b.  During  fill  operations  measure  and  noce  the  rate  at  which 
the  test  item  can  be  filled.  Also  note  the  capacity  of  test  item. 

c.  During  drain  operations  measure  and  note  the  rate  at  which 
the  test  item  can  be  drained.  Also  note  the  amount  of  water  that  cannot  be 
withdrawn. 

d.  Measure  and  note  any  changes  in  the  configuration  of  the 
test  item  due  to  snow,  wind,  ice,  etc. 

NOTE:  Step  d  would  only  apply  where  the  test  item  is  not 

provided  with  a  shelter  as  in  the  case  of  large  storage 
tanks. 

e.  Record  the  following  data: 

1)  The  rate  at  which  the  test  item  can  be  filled  and  emptied. 

2)  Storage  capacity  of  the  test  item. 

3)  Amount  of  water  that  cannot  be  withdrawn  from  the  test  item. 

4)  Ambient  air  temperatures  and  wind  velocity,  water 
temperatures,  and  surface  temperatures  of  the  test  item. 

5)  Maximum  depth  of  snow  accumulated  on  the  reservoir,  on 
a  daily  basis. 

6)  Description  and  photographs  of  the  effects  of  rocks, 
snow  and  ice  on  the  test  item's  exterior  and  any  sign 
of  wear,  pinholes,  cracks,  blisters  or  leakage. 

6.2,5  Human  Factors  Evaluation  and  Safety 

a.  Conduct  all  Human  Factors  and  Safety  Tests  in  accordance 
v;ith  the  applicable  sections  of  MTP  10-4-500. 


i 


-6- 


■'fcUllIK 


MTP  8-4-014 
26  November  1969 


b.  Conduct  these  tests  concurrently  with  the  operational  tests 
described  in  this  MTP. 

6.2.6  Maintenance  Evaluation 

a.  Conduct  all  maintenance  evaluation  tests  (Maintenance  and 

Reliability)  in  accordance  with  applicable  sections  of  MTP  10-4-500. 

b.  Conduct  these  tests  concurrently  with  the  operational  tests 
described  in  this  MIP. 

6.3  TEST  DATA 

All  test  data  to  be  recorded  will  be  as  specified  in  the 
individual  subcests  of  chis  MTP. 

6.4  DATA  REDUCTION  AND  PRESENTATION 

Processing  of  raw  test  data  shall,  in  general,  consist  of 
organizing,  marking  for  identification  and  correlation,  and  grouping  the 
test  data  according  to  test  title. 

Specific  instructions  for  the  reduction  and  presentation  of 
individual  test  data  are  outlined  in  the  succeeding  paragraphs. 

6.4.1  Preoperatlonal  Inspection  and  Physical  Characteristics 

Preoperational  inspection  and  physical  characteristics  data  shall 
be  reduced  and  presented  in  accordance  with  MTP  10-4-500. 

6.4.2  Transportability 

Determine  the  extent  of  the  problems  involved  in  handling,  loading, 
offloading,  and  transporting  the  test  item  in  an  arctic  environment.  Prepare 
a  report  discussing  the  problems  and  detailing  special  procedures,  materiel, 
or  personnel  required  to  support  the  transport  of  the  test  item  in  an  arctic 
environment. 

6.4.3  Installation 


Determine  the  extent  of  problems  involved  in  installing  Water 
Purification,  Water  Storage,  Water  Handling  Equipments,  in  an  arctic  environment. 
Prepare  a  report  discussing  the  requirements  for  shelters  and  heating;  the 
need  for  special  equipments  and  materiels;  and  the  need  for  design  changes 
to  the  test  item  to  facilitate  future  installations  in  arctic  environments. 

6.4.4  Functional  Suitability 


The  operation  of  the  test  item  shall  be  determined  by  comparison 
with  previously  accepted  items  of  like  nature  and  specifications.  Prepare 
a  report  on  the  acceptability  of  the  test  item  and  other  components  and 
connections,  and  analyzing  the  performance  characteristics  under  varying 


-7- 


MTP  8-4-014 
26  November  1969 


demand  rates  and  temperature  ranges. 

6.4.5  Human  Factors  Evaluation  and  Safety 

Human  Factors  and  Safety  data  shall  be  reduced  and  presented  in 
accordance  with  MTP  10-4-500.' 


6.4.6 


Maintenance  Evaluation 


Maintenance  data  (including  reliability)  shall  be  reduced  and 
presented  in  accordance  with  MTP  10-4-500. 


;«r 

,'ctin  white  ittnoii  □ 

•*  »WT  UCIIOH 

-isnam  . . 


I  . 

!  Y 

j  *  •  * ^no^miuejiirr 

oi:r  .  avail  m  or  s>mk| 


MTP  8-4-014 
26  November  1969 


UNCLASSIFIED _ 

Srcuniv  CI«»»ific«tion _ _  _  _  -  _ 


DOCUMENT  CONTROL  DaTA  .  R  &  D 

5ccurifi  rUikifircLon  of  liffc,  bod'  of  sb*rrmrr  and  onnotpti  t<n  .*»  i*  •*- 1  bv  entered  ufirr  i'm.-  wrrjH  trput!  c  t.i*  \t  iivl  > 


1  ORIGINATING  activity  r  Corpora  f*  muthor)  is,  REPORT  iECo*»'*v  CL*5$iF:r  *  *'Os 

US  Army  Teat  and  Evaluation  Cotimand  (USATECOM)  Unclassified 

Aberdeen  Proving  Ground,  Maryland  21005  TiTTSoT^- 


J  REPO  *  T  t;tLt 

US  Army  Test  and  Evaluation  Command  Materiel  Test  Procedure  8-4-014,  Environmental 
Test  Procedure,  "Arctic  Environmental  Test  of  Water  Handling,  Water  Storage  and 
Water  Purification  Equipment." 


4.  DESCRIPTIVE  NOTES  (Typs  of  report  ind,  inefuilv,  d«t*x) 

Final 


U  CONTRACT  OR  GRAN 

DA-18-001-AMC-1045(R) 

b.  PROJCC  T  no 

AMCR  310-6 


7S.  TOTAL  NO  OP  PAGES  7b.  NO  OF  RETS 


10  8 


*•.  ORIGINATOR'S  REPORT  Suu«UU!| 


MTP  8-4-014 


9b  OTMEW  REPORT  nO<*>  (Any  other  numbers  thm  I  may  *>•  sstlgned 
this  report) 


10  DISTRIBUTION  STATEMENT 

This  document  is  subject  to  special  export  controls  and  each  transmittal  to 
foreign  governments  or  foreign  nationals , -WITH  THE  EXCEPTION  OF  AUSTRALIA, 
CANADA,  AND  UNITED  KINGDOM, -may  be  made  only  with  prior  approval  of  HQ, USATECOM. 


JuPPLtMlNTART  NOTES 


’2  SPONSORING  M«li  TAR  V  ACTIVITY 


Headquarters 

US  Army  Test  and  Evaluation  Command 
Aberdeen  Proving  Ground,  Maryland  21005 


This  Environmental  Test  Procedure  describes  test  methods  and  techniques  for 
evaluating  the  performance  and  characteristics  of  Water  Handling,  Water  Storage 
and  Water  Purification  Equipment,  under  Arctic  winter  conditions.  Evaluation  is 
related  to  the  criteria  established  by  Qualitative  Materiel  Requirements  (QMR) , 
Small  Development  Requirements  (SDR),  Technical  Characteristics  (TO),  or  other 
design  requirements  or  specifications. 


)  DD  .'"M  473  (PACF 


S/N  01  01  -007*68  1  1 


UNCLASSIFIED _ 

Security  Classification