Transportation System Plan 2018-2038
Medford · Page 265 of 398 · Adopted 2018-12-06
also unfunded and that m ay require further refinem ent planning to clarify purpose and need. Tier 3
projects are assum ed for implem entation beyond 2023 and were originally identified as Tier 2 projects in
the 2001-2023 Rogue Valley Regional Transportation Plan or as jurisdictional transfer projects from
Jackson County to the City of Medford.
As indicated in the project phasing tables, a short -fall will likely exist between the total im provem ent
needs (Tier 1 and Tier 2 projects) and anticipated revenue over the 20-y ear pl anning period with total
project needs identified at nearly $120 m illion and an ticipated revenue expected to be about $67 million
(assum ing both existing revenue sources and the 3 pe rcent annual increases in SDCs and Street Utility
Fees as described above). The rem aining difference between project needs and anticipated revenues over
the 20-y ear period is estim ated to be approxim ately $53 m illion.
Tables 13-2 through 13-4 present the Tier 1 list of improvem ent projects identified for funding and
implem entation in the Medford UGB by the City of Medford, ODOT and Jackson County . Tier 1
projects are also illustrated in Figure 13-1. Table 13-2 depicts projects to be implem ented within the
short-range planning period (fiscal y ear 2004 thr ough 2008). Table 13-3 illustrates projects in the
medium -range im plem entation period (fiscal y ear 2009 through 2013), while Table 13-4 represents the
long-range period (2014 through 2023).
Table 13-2
Transportation System Improvements
Medford UGB – Short-Range (2004-2008)
Funding A gency Project
ID No. Location Improv ements Medford Othe r Cost
Medford Tier 1 Improvements – Short Range (2004-2008)
402 Lozier Lane, 500’ from
Cunningham north Construct new three lane road w ith
bike lanes and sidew alks $500,000
403 Garfield Rd, Peach to
Kings Highw ay Widen to three lanes w ith curb,
gutter, bike lanes and sidew alks $1,600,000
407 Jackson St, Berkeley
Way to Valley View Dr Realign and w iden to three lanes
with curb, gutter, bike lanes and
sidew alks
$2,750,000
409 Peach St, Stew art to
Garfield Widen to tw o lanes w ith curb,
gutter, bike lanes and sidew alks $1,700,000
412 S Holly , Garfield to
Holmes Construct new three lane road w ith
bike lanes and sidew alks $3,700,000
413 Columbus Ave,
McAndrew s to Sage Realign, extend Columbus to Sage
Rd, and w iden to three lanes w ith
bike lanes and sidew alks $3,000,000
414 Poplar, McAndrew s to
Progress Widen to three lanes w ith curb,
gutters, bike lanes and sidew alks $600,000
416 Crater Lake at
McAndrew s Add second NBL lane, second EBL
and EBR lane $1,600,000
417 Siskiy ou at Highland Realign intersection, add NBL lane,
extend EBR lane, signalize $750,000
419 Table Rock at Merriman Signalize w ith intersection
improvements or roundabout. $750,000
448 Delta Waters Rd,
Provincial to Foothill Widen to three lanes w ith curb,
gutter, bike lanes and sidew alks $1,000,000
Sub-total 17-Pro ject L ist $17,950,000 ♦
♦
♦
♦
♦
♦
♦
♦
♦
♦
♦
Medford Transportatio n System Plan 13-20 Plan Goals and Implementation
Ask AI what this page says about a topic: