Transportation System Plan 2018-2038

Medford · Page 340 of 398 · Adopted 2018-12-06

Appendix F Programmed/Planned Improvements from the Draft State Transportation Improvement Program (2004-2009) and Rogue Valley Regional Transportation Plan (2002) This appendix docum ents progr ammed (“financially com mitted” ) and planned transportation improvem ents for the Medford UGB as identified in Draft State Transportation Im provem ent Program (2004-2009) and the RVCOG’s Regional Transportation Plan (RTP). These im provem ents are incorporated into the regional travel dem and m odel forecasts and are used to develop future traffic forecasts for the level of service study . A discussion of Medford-area OTIA (Oregon Transportation Investm ent Act) projects follows the STIP. . These planned and program med improvem ents are described below. State Improvement Programs Statew ide Transportation Impr ovement Program (STIP), 2004-2007 Oregon' s Statewide Transportation Im provem ent Program is the state’s transportation capital improvem ent program , which fulfills the requirem ents of the Transportation Equity Act for the 21st Century (TEA-21). The STIP lists the schedule of tr ansportation projects for the four-y ear period from 2004 to 2007. It is a com pilation of projects utilizi ng various federal and state funding program s, and includes projects on the state, county and city transportation sy stem s as well as projects in the National Parks, National Forests, and Indian Reservations . Also included are projects fully funded by the metropolitan planning organizations (MPOs) that are of regional interest or significance. The following table sum marizes the im provem ent projects program med in the 2004-2007 STIP for Medford . Table F-1 Summary of Draft 2004-2007 STIP Programmed Improvements – City of Medford Key No. Route Location Fiscal Year Const. Cost ($,000) Work Type Description 10838 Highway 62 Corridor Solutions (Unit 1) TEA 21 # 52 (MP 0.00 – 0.57) 2004 $21,177 Modernization Improvements to North Medford interchange between I-5 and Poplar Drive 11379 S. Holly Street Garfield Road – Holmes Avenue 2005 $450 Modernization Construct new 3 lane roadway w/bike lanes and sidewalks 12509 Columbus Avenue McAndrews Road – Sage Road 2005 $450 Modernization Realign and widen to 3 lanes w/bike lanes and sidewalks 12506 N. Phoenix Road Cherry Lane – Hillcrest Road 2005 $1,218 Modernization Construct new 5 lane roadway w/bike lanes and sidewalks 12507 Peach Street Stewart Avenue – Garfield Road 2005 $735 Modernization Widen to 2 lanes w/bike lanes and sidewalks 12508 Stevens Street Crater Lake Avenue – Wabash Avenue 2005 $600 Modernization Widen to 3 lanes with sidewalks F-1
Ask AI what this page says about a topic: