Transportation System Plan 2018-2038
Medford · Page 61 of 398 · Adopted 2018-12-06
Rogue Valley International – Medford Airport Master Plan (2001)
An Airport Master Plan was com pleted in February of 2001 for the Rogue Valle y International-Medford
Airport. This Master Plan provides for anticipat ed aviation facility needs over the next twenty -year
period (and beyond). The im provem ents identified in the Master Plan will allow the airport to m eet
growing dem ands of com mercial passenger air service, ai r cargo, m ilitary , and general aviation needs. In
addition to addressing aviation needs, the plan also identifies airport-owned properties that are not
anticipated for aviation-related developm ent. These properties m ay be used for other purposes to enhance
airport revenues. The plan generally recom mends th at proposed im provem ents be im plem ented as airport
activity dem ands them . Recom mended im provem ents include:
• Expanding the loop road in order to provide additional parking capacity
• Construction of a grade-separated interchange between Biddle Road and the airport access road
• Construction of an additional runway to handle projected airline activity
Implem entation of these and other recom mendations re lated to developm ent of the airport are the
responsibility of Jackson County using County , Federal Aviation Adm inistration (FAA), and other
funding. Airport-related recom mendations are further addressed in Chapter 9 of the TSP.
Other Transportation Studies
In addition to the foregoing, there are num erous othe r studies and transportation -related docum ents which
have been produced in the Rogue Valley area. Som e of these have been reviewed to extract specific
inform ation that will be helpful in preparing the Medford TSP, but the docum ents have not been
summarized in this m emorandum due to the limited applicability of the inform ation they contain. For
exam ple, the existing TSPs for nearby jurisdictions including Central Point, P hoenix, and Talent have
been reviewed to obtain inform ation such as functional classification and im provem ents so that
consistency can be m aintained between these jurisd ictions and the City of Medford where relevant.
Many other studies have still less utility in the preparation of the Medford TSP than the ones previously
summarized. The first technical m emorandum produced for the Rogue Valley Regional Transportation
Plan (RTP) in August 1993, provides an exhaustive revi ew of existing transportation plans and studies
previously completed in the area. Table 2-3 belo w lists plans and studies by title and date that are
reviewed in Technical Mem orandum #1 of the RTP. If additional inform ation from any of the studies
listed below is required, the Technical Mem orandum #1 of the RTP should be consulted.
Table 2-3
List of Other Transportation Studies w ith Relevance to Medford TSP
Study
Year
CORRIDOR AND INTERCHANGE STUDIES
Highw ay 62 Corridor Solutions Project – Pr eliminary Draft Environmental Assessment 2001
Pacific Highw ay No. 1 (I-5) Corridor Study Phase I, M.P. 1.0 - 70.0 1992
A Traffic Management and Access Plan fo r Crater Lake Highw ay (OR 62) 1991
AREA-WIDE TRANSPORTATION STUDIES
South Gatew ay Center T raffic Study 1992
King Business Center T raffic Study 1992
Parking Structures Feasibility and Preliminary Design Analy sis 1990
Medford Transportation System Plan 2-20 Previous Work/Background Studies
Ask AI what this page says about a topic: