FORTNIGHTLY REPORT
FORTNIGHTLY REPORT
FRIDAY 13 DECEMBER
PARIS
STATUS ITEM COMMENT
+ Update 1. Change fat lady painting frame i) 13/12 — Complete. See attached picture.
+ Update 2. AC in master bedroom — JE
says AC is broken — a/c cuts off
after 30 mins. ii) 13/12 — Diffusers need to be changed. The diffusers need
to be specifically made and Serge will be contacting GM
wk of 16 Dec to discuss this.
+ Update 3. Safe iii) 13/12 — Further delayed from 18 Nov — expecting to
install by mid-Dec — scheduled for 16 Dec at 15h00.
+ Update 4. Raise globe desk iv) 13/12 — Complete.
+ Update 5. First aid v) 13/12 — Trauma / oxygen kit — Valdson has tried various
places to have oxygen tank filled and has been advised
that this is not possible in France. GM advised that she
will speak with her aunt at the hospital and have Valdson
take her the tank to be filled.
+ NC 6. Door Codes Changed vi) 13/12 — Complete
+ Update 7. Computers vii) 13/12 — Valdson installed second card reader on GM
computer and is now working.
+ Update 8. Photos for Apt viii) 13/12 - Nine 8% x 13 JE brain picture for dining room to
replace African heads — Valdson has pictures and will
1
EFTA00577661
FORTNIGHTLY REPORT
FRIDAY 13 DECEMBER
STATUS ITEM COMMENT
+ JE to advise ix) hang these by 20 Dec.
13/12 - Three 71/4 x 101/4 JE brain picture — Valdson has
pictures and will hang these by 20 Dec.
12/12 - No pictures chosen for the Indian heads round
end of the living room — advised that JE still needs
to choose pictures.
+ Update 9. Paint Boudoir walls and loo +
change carpet 13/12 — Fax sent to Jean on 3rd Dec advising that the
paint should be more pastel and the shapes should be
more subtle. Carpet will be changed after painting
complete. Valdson advises painter had a look at the
boudoir and will put forward a proposal. Pinto's office
have not yet received the new samples. Expect proposal
16th / 17th Dec.
► NC 10.AC in Kitchen xii) 13/12 - To be reviewed at the time as the AC in the new
apt.
Update 11.New Lampshade for lamp on JE
desk. xiii) 13/12 - Jean purchasing a new lampshade. Jean advised
GM that this will be complete by 20 Dec.
Update 12. Bull Painting xiv) 13/12 — Valdson has removed painting and placed in
storage.
2
EFTA00577662
FORTNIGHTLY REPORT
FRIDAY 13 DECEMBER
STATUS ITEM COMMENT
> Update
4 13. Pictures to Replace Bull
Painting xv) 13/12 — Valdson has hung the 5 frames where the bull
painting was and sent GM a picture. See attached picture
+ Update 14. Pictures in guest corridor to be
reframes w/pics on site xvi) 13/12 — This is complete minus 2 that broke. Valdson
has hung the pictures.
+ NC
+ JE plse advise 15. Dining Collection xvii) 13/12 — JE previously advised that we were to utilize
own collection — plse advise what you would like us to
use.
+ Update 16. LSJ Model xviii) 13/12 — Has been shipped and expect to arrive at LSJ
end-Jan 2003.
3
EFTA00577663
FORTNIGHTLY REPORT
FRIDAY 13 DECEMBER
NEW PARIS APT
STATUS ITEM COMMENT
> NC 20. JE wants schedule for work —
inc layout, construction and
decoration i) 13/12 — JE received renderings and plans from Pinto's
office 7 Dec. Jean advised that the apt will be ready in 1
year as agreed with JE. Updated plans have been
received by JE today 13 Dec.
+ Update 21. Change Windows before
Winter ii)
iii) 13/12 - Quote has been approved and expected
completion is beginning Jan 2003 - this now will change
due to additional papers required.
13/12 — Last night, Darren received from Marie-Joseph
Experton a form of letter to be sent by the architect to the
building manager of 22 Avenue Foch. According to
Marie-Joseph, it is necessary for the manager of the
condominium to confirm in writing the condominium's
consent to the proposed windows change; the letter, to be
signed by Serge Boquet on behalf of SCIJEP, the owner
of Jeffrey's apartments, simply requests the necessary
consent from the building manager. Darren approved the
form of the letter and sent it back to Serge Boquet today,
along with two original powers of attorney from Jeffrey,
as manager of SCIJEP, authorizing Pinto's firm and
Gerp Architects to act on behalf of SCIJEP in connection
with obtaining any municipal approvals or building
approvals required for the window changes.
4
EFTA00577664
FORTNIGHTLY REPORT
FRIDAY 13 DECEMBER
STATUS ITEM COMMENT
Pinto's office requested that Marie-Joseph contact the
lawyer of the owner of the apartment on the P' floor
below Nassif's apartment. Apparently, Pinto and Marie-
Joseph have been unable after repeated attempts, to reach
the owner. Marie-Joseph advises that although she has
made several telephone calls to the owner's lawyer, she
has still received no response. Marie-Joseph promised to
continue to follow up.
5
EFTA00577665
FORTNIGHTLY REPORT
FRIDAY 13 DECEMBER
PALM BEACH
STATUS ITEM COMMENT
+
+ Plse advise
Update 1. Stone Dock Steps i) 13/12 — JE advised he had drawn up a plan of how stone
steps should be done. Nick has tried to obtain a copy but
no-one can supply it. Can JE plse supply Nick with
sketch. Same stone as surrounds pool to be utilized for
this project as per JE.
+
+
> Update
JE plse advise
[ t;IL ILI 2.
3.
4. Repaint of House ii)
iii) 13/12 — First quotation to repaint interior = $24,250.00
13/12 — NS spoke with Charles Miller, and he
unfortunately does not know anyone. GM advised she
would contact some of her friends to see what
recommendations they have. GM has managed to come
up with one number only.
Nicole is also investigating some painters.
Re-Carpet
John Alessi iv)
v) 13/12 — Blue carpet chosen by JE (9D200-27505 Silo
Inasquette 28S). Carpet company has been to the house
to measure and will supply quote by 18 Dec. This will
replace all the yellow carpet with the blue spots
(stairways, passages upstairs, guest rooms & passage
outside master room).
13/12 — Complete - $200.00 has been deducted.
6
EFTA00577666
FORTNIGHTLY REPORT
FRIDAY 13 DECEMBER
STATUS ITEM COMMENT
• Update 5. Landscape Lighting vi) 13/12 — JE advised Patrick to install uplight garden
spotlights to make the garden appear more natural.
Patrick has installed 12 and is presently repairing all the
old lights & will be doing a master plan for all outside
lighting and where their switches are located.
Update 6. Installation of DSL line on GM
old computer vii) 13/12 — Marc is setting up technician to install line —
scheduled 16 Dec.
Update 7. Purchase of colour cartridges
for GM's printer viii) 13/12 — Patrick has replaced the cartridges in GM's
computer and has purchased additional stock. Stored in
stationery cupboard.
► Update 8. Wax Treatment on Wooden
Floors i. 13/12 — Quote received of $2,746.25 for one coat & to
skim the floor, and for a second coat an additional
$2,198.00. This is for a clear gloss finish = $4,944.25. A
semi-gloss and satin finish can also be done. See
attached quote. This company was suggested through
Nicole.
► Update 9. Plumbing for Repair of Pink
Room . 13/12 — the plumber has advised he is unable to repair as
this is a building problem, and contractor has come
around and will be quoting for the repair. Quote
expected 16 Dec.
7
EFTA00577667
FORTNIGHTLY REPORT
FRIDAY 13 DECEMBER
STATUS ITEM COMMENT
ON HOLD
vii) NC 10. Auto Hurricane Shutters for
Remaining Sections of House xiii) JE sd not to do anything at this time with the shutters.
+ NC REDECORATION OF HOUSE
11. Schedule from Pinto xiii) 13/12 — Pinto's office has still not supplied an update
despite calls and faxes sent.
8
EFTA00577668
FORTNIGHTLY REPORT
FRIDAY 13 DECEMBER
457 MADISON
STATUS ITEM COMMENT
+ NC 1. Decorator for JE office i) Bastion supplied JE with info on proposed concept, and
JE is considering proposal.
+ NC
+ NC
+ JE to advise how
to proceed 2. Darren's Office to buy new
furniture ii) JE wanted new furniture. GM to purchase new desk &
cabinets for Lauren's area & conference table & look at
dividing unit for Lauren & Darren.
iii) JE liked image of furniture - catalogue of the furniture
and additional catalogues Edwina sourced given to JE.
+ Update 3. Directory Update iv) 13/12 — All envelopes have been mailed that had
complete addresses. We are already receiving responses
and the records are being updated as received.
9
EFTA00577669
FORTNIGHTLY REPORT
FRIDAY 13 DECEMBER
301 EAST 66TH
STATUS ITEM COMMENT
Update I. ION i)
ii)
iii)
iv)
v) 13/12 — Carpet will only be installed week of 16 Dec as
arrived late from manufacturer.
13/12 — Edwina will personally work at the apartment 18
Dec to sort it out.
13/12 — Living room furniture is being delivered 18 Dec.
13/12 — Larry V is ordering TV and Hi-fi for delivery.
13/12 — 2 telephone lines will be installed. Management
need to disconnect line as previous tenant has still not
disconnected, before the lines can be installed. Edwina will
Andrew attend to this week of 16 Dec.
10
EFTA00577670
FORTNIGHTLY REPORT
FRIDAY 13 DECEMBER
65TH STREET
STATUS ITEM COMMENT
+ Update 1. AC in downstairs office i) 13/12 - Brian to polly fill edge of vent 16 Dec..
+ Update 2. Wireless in the basement for
staff ii) 13/12 — Pat Callaghan installing 17 Dec when attending to
other work at 651h.
+ Update 3. Canvass to replace Kline iii) 13/12 — New canvas being ordered once GM chooses
correct size. Edwina to send GM email showing masking
tape of size on wall for GM to choose — attending to this
on 16 Dec.
+ Update 4. Strip Lights — Gym iv) 13/12 — Richard is ordering some parts needed for the
electricity supply — expected completion 23 Dec.
+ Update 5. Credenza v) 13/12 — The legs are being raised and will be returned 16
Dec.
+ NC 6. Carpet Cleaning vi) 13/12 — Scheduled for 17 Dec — living room, dining,
bedroom & GM office.
+ Update 7. Stick Hi-fi Wires vii) 13/12 — Brian will attend to complete this 16 Dec. These
need to be stuck down out of the way of the heat from the
fireplace.
+ Update 8. Hang Frames in the Gym viii) 13/12 — Brian will attend to this 16 Dec.
11
EFTA00577671
FORTNIGHTLY REPORT
FRIDAY 13 DECEMBER
+
+ Update
NC 9. Extractor in the basement &
the main kitchen ix)
x) 13/12 - Custom made extractor in the basement needed.
Rich is obtaining a quote. Expert viewed basement 11
Dec and expect quote by 20 Dec.
13/12 - Extractor in the main kitchen — Rich looking how
to boost system + change filters and clean system which
should improve problem.
+ Update 10. Book shelves for photobooks
in the office xi) 13/12 — Brian will complete this 16 Dec
+ Update 11. Answer machine on the guest
line xii) 13/12 — Pat Callaghan installing in blue room &
connecting to system 17 Dec when attending to other
work at 65'h.
+ Update 12. Suburban xiii) 13/12 — Car went in for full service as security system
was malfunctioning. It was discovered that the system
was perfect and working well, and that a third key had
been cut which was not factory issue causing the security
system to activate cutting the ignition so the car could not
be started. The third key has now been destroyed and no
further problems are being experienced.
12
EFTA00577672
FORTNIGHTLY REPORT
FRIDAY 13 DECEMBER
71ST STREET
STATUS ITEM COMMENT
+ Update 1. Safe Room Bolt i) 13/12 - Bolts Arrived & installed — see attached pictures.
>
> Update
JE plse advise 2. Security DSL Line ii) 27/11 - The DSL line to the security cameras in the office
have been hooked up. The receiving end needs to be installed
in Richard's house scheduled for 2 Dec. Marc Lundberg is
able to install a hardware firewall to keep the line more
secure - advised cost will be approx. $1,000.00, a software
firewall has already been installed and will keep the line
secure until we install the hardware.
13/12 Both DSL lines have been installed but the software
for the security has not been loaded. JE to approve this prior
to software being loaded.
13/12 — Marc will need to configure the hardware firewall
once the software has been installed.
+
+ Update
Plse advise 3. Lighting iii) 13/12 — JE met with Rockwell Group week of 4 Dec.
Plse advise how you would like Nick to pursue this matter.
13
EFTA00577673
FORTNIGHTLY REPORT
FRIDAY 13 DECEMBER
STATUS ITEM COMMENT
+
+ NC
Would JE like to
proceed? 4. Surveillance Cameras 3rd Fir iv) 13/12 - 2 quotes for surveillance of the 3rd fir which will
be based in the safe room previously supplied. This will
be an independent surveillance system from the remainder
of the house. The cameras will only be accessible from the
safe room.
+ NC 5. Hot Water System
Siemens - Landes v) 27/11 - Richard is obtaining a quotation and proposal to
have a temperature sensor installed for a domestic hot
water system which links back to the computer system.
This would enable Richard to control and regulate the
domestic hot water — expected 16 Dec.
+ Update 6. Grohe Master
Thermostatic Valve Shower vi) 27/11 — Richard disassembled valve & cleaned inlet
screen thermo element cartridge — this has increased the
valve operation & water became hot a lot faster and is
currently running at its optimum level. Parts have been
ordered to see if helps with temperature.
+ JE plse advise 13/12 — Parts have now been installed. From switching on
the tap it takes 2 minutes for the water to heat up to the
correct temperature.
+ Update 7. Flowers viii) 13/12 — There are now three people we can use for the
flowers — Dennis, Flower Shop & Susan Edgar
Productions whom Nick met with.
+ JE plse confirm Please confirm if you would like flowers at 71st if you will
be staying more than 2 days.
14
EFTA00577674
FORTNIGHTLY REPORT
FRIDAY 13 DECEMBER
STATUS ITEM COMMENT
+
+ Lpdate
JE plse confirm 8. Antennae Company ix) 13/12 — Darren has checked background of antennae
company and everything seems to be in order. Can NS
now arrange a meeting betw. them and Sawyers with
regard to the communication system for 71".
+ Update 9. Panic Buttons x) 13/12 — Panic buttons located in the following areas:
a. Lower entrance handrail on left side
b. Upper entrance handrail right side
c. 1" Floor service corridor right outside staff lift.
d. Master bedroom stairs 2nd floor landing.
e. Old master bedroom now sitting room on wall by the
front door.
f. 1" Floor security desk.
DECORATING
+ NC 8. Coloured Boards for entryway vii) Complete
+ Update 9. Converting part of basement in
to staff quarters viii) 13/12 — Quotes received — Charles Miller is looking into
these quotes as the quotes were higher than expected.
Charles spoke to Doug & Brian and advised quotes
received were ballpark estimates for conversion, and once
JE decides which option he would like to pursue, a precise
quotation will be drawn up. The quotes differ because
some items were left out of the one quote.
15
EFTA00577675
FORTNIGHTLY REPORT
FRIDAY 13 DECEMBER
STATUS ITEM COMMENT
•; NC 7. Redecoration of living room and
MBR ix) 27/11 - Miller says that he is awaiting full electrical plan
from Pinto office so that the can see the scope of work.
13/12 — The redecoration will commence in the new year.
Still waiting for Pinto's office to supply info.
13/12 — Charles advised he is still waiting for Pinto's
office to supply the info. The work cannot commence until
the electrical plan has been received.
+ Update 8. Sarah and Picture of x) 13/12 — Complete.
16
EFTA00577676
FORTNIGHTLY REPORT
FRIDAY 13 DECEMBER
AEROPLANES
STATUS ITEM COMMENT
> Update I. GIIB Stage III i)
ii)
iii)
iv) 13/12 - Ops 2 inspection completed. Ops.
13/12 — Loaner APU installed due to high oil consumption
& light cabin smoking on the ground. Our unit is due back
from Dallas Airmotive in January.
13/12 — Aircraft Lease offer declined.
13/12 — Quiet Technology Aerospace still awaiting FAA
approval — this is best option for performance, weight &
least modification to the aircraft.
> Update 2. Operational Manual v) 27/11 — Inspector assured Larry M that RVSM / MNPS
Letter of Authorization would be received by the end of the
year.
+ Update 3. 727 Interior vi) 27/11 - Florida Flight viewed 727 to bid on interior removal
and re-installation including modifying aft lavatory for
shower — one quote has arrived minus the shower
component form FLA interiors — The shower section of the
quote should arrive 1st week Dec. The co. Lou Martin was
due to see the plane Dec 2 to be able to quote on the job but
this needs to be rescheduled as the plane will be in NY
17
EFTA00577677
FORTNIGHTLY REPORT
FRIDAY 13 DECEMBER
STATUS ITEM COMMENT
4 JE plse advise vii) 13/12 — Computer & monitor have been removed per JE to
be replaced by CD stereo only. Please advise where
computer & monitor are to be sent.
viii) 13/12 — Replacement sink for aft lavatory ready to install —
requires 8 man hours.
ix) 5/12 — Larry is selecting towel racks for fore & aft lays to
be plated & installed, he also has plastic samples for JE to
view for office desk cover. Sample "7" cushions and seat
back wedges being cut and ready for JE to try for office
chair 11 Dec.
JE sampled various cushions — did not like, Larry is
working on obtaining further cushions.
x) 13/12 — January work scope with Jet Aviation to include:
a. Sealing all pocket door voids to quiet during taxi &
flight.
b. Making aft stateroom pocket door more insulated to
noise.
c. Concealing bookshelf speakers in office and forward
salon — Larry M will discuss with JE.
d. Hide the subwoofer in the office.
e. Rework of office chair per test cushions.
18
EFTA00577678
FORTNIGHTLY REPORT
FRIDAY 13 DECEMBER
STATUS ITEM COMMENT
xi) 13/12 — Lou Martin to visit aircraft when next in PB for
roman shades & aft lavatory shower modification.
xii) 13/12 — Interior removal & re-installation of the "C" check
is still out for bidding.
xiii) 13/12 — August 2003 work:
a. Pacific Gas Turbines selected to do work on the No. 2
engine high pressure compressor.
b. "C" check will be compiled at Flightstar JAX.
xiv) 13/12 — SFAR 88 (Fuel Tanks) — received relief from
Dugan for the winglets and BFGoodrich for engine mods.
Currently working on all other STC's and modifications in
compliance — no problems foreseen just time consuming. At
FAA mtg in Nov.
+ Update 4. Helicopter xv) 13/12 - Now in Tennessee. Expected completion Jan 15 Inc
a/c floats wire strike kit, High visibility crew doors and
Bose headsets throughout + 2 scoop tail rotor modification.
Training is scheduled Jan 27'h for 5 days.
19
EFTA00577679
FORTNIGHTLY REPORT
FRIDAY 13 DECEMBER
STAFF
STATUS ITEM COMMENT
+ Update 1. Patrick & Evelyn i) 13/12 - Patrick & Evelyn will now be staying in Palm
Beach as the management couple. JE has agreed to pay
Patrick $3,000.00 p/m.
4
+ NC
JE plse advise 2. Rick Harrington ii) Currently earning $125k. How would you like to proceed
with Rick?
4
> Update
JE plse advise 3. South African Candidates iii) 13/12 - Video cassette of three final candidates given to
for JE to view at LSJ. Now that Evelyn & Patrick
are staying in Palm Beach would JE like to decide about a
couple for ZOITO from the 3 South African candidates: We
would be able to obtain tickets for approximately
$1,000.00 return p/p
a) Andrew & Gidi
b) Fred & Wilma Da Silva
c) Brendan & Nicolene
4 NC 4. Bill Hammond iv) 27/11 — JE said that he would contact directly
+
4 NC
JE plse advise 5. Helicopter Pilot—Nicholas v) 27/11 - He is interested in the position. Nicolas sd that
until the summer he would not be busy with the Navy
contract, and so he could look after the helicopter and fly
it. He has one assignment for the navy in Jan for a week.
Nicolas also sd that he had lots of holiday due to him
which he could a I for and use his holida time to work
20
EFTA00577680
FORTNIGHTLY REPORT
FRIDAY 13 DECEMBER
STATUS ITEM COMMENT
for JE. Plse advise how you want to proceed.
•> NC
NC 6.
7. Pilot — Peter Rathgeb vi) 13/12 - Larry V still talking to him and he is thinking
about quitting United Airlines.
Pilot Search vii) 13/12 - Larry has advised he will wait for a decision on
Bill Hammond and/or Pete before contacting a pilot
headhunter.
•>
> NC 8. Hugo's Agency in Italy viii) 27/11 — GM obtained the number from Hugo for his staff
agency. GM called the agency the person she spoke with
advised that she needs to look for people who would be
willing to move to the states — GM will follow up lst week
Dec to see if she has any suitable couples.
13/12 - GM still not heard back.
NC 9. Flavio ix) 13/12 - GM has still not heard back yet from Flavio.
21
EFTA00577681
FORTNIGHTLY REPORT
FRIDAY 13 DECEMBER
GENERAL
STATUS ITEM COMMENT
Update 1. Palace in Morocco i) 27/11 — GM called Nina Stevens, and Nina said that she
would call back with a number. She has not called back
yet.
13/12 — GM has left a message for Ambassador Jaidi and
has sent a letter with all the info.
+
+ Update
JE plse advise 2. Medical Training for all Houses ii) 13/12 - Tom is happy to provide training for staff in NY
but will need to take a course to qualify him as instructor.
He will be unable to provide training before January.
Would JE prefer sourcing someone else?
+
+ Update
JE plse advise 3. Mercedes Guard Car iii) 13/12 — This has been approved for purchase by JE.
Which property should receive the guard car? JE plse
advise.
+ Update 4. Medical Equipment iv) 13/12 — Additional purchases:
a. 71s1 Street — burn kit and eye, skin solution
b. 65th Street — complete first aid box
c. Zorro — first aid box for stings, mosquitoes, snakes,
wasps and bees, and a first aid blister box kit.
d. Palm Beach — a cycling road rash kit and a new
medical kit
e. 727 — a suture and syringe medical kit as well as an
emergency dental kit.
22
EFTA00577682
FORTNIGHTLY REPORT
FRIDAY 13 DECEMBER
KINNERTON STREET
STATUS ITEM COMMENT
Update 1. Range Rover i) 13/12 — Siemens car phone is only available in Europe and
works on GSM network. Range Rover USA is only
installing 1/2 watt regular cellphones in the State side
market.
+ Update 2. Defibrillator ii) 13/12 — This has arrived in London and is being delivered
by FedEx today (13/12) and will be kept with remainder of
first aid kit in the "green" bathroom cabinet.
23
EFTA00577683
FORTNIGHTLY REPORT
FRIDAY 13 DECEMBER
ZORRO RANCH
STATUS ITEM COMMENT
+ NC 1. Pew i) Arms of the pews have been constructed. Mike will then
stain with color JE picked. Expected completion 18 Dec.
+ Update 2. Water Pump ii) 13/12 — Water pump is in place.
+ Update 3. Security Gate iii)
iv)
v) Professional Security (Frank) is working on a price to dig
the trench for the security cameras. Mano could dig the
trench but he is currently working digging the line for the
new water pipe and he would only be able to start digging
the security trench in 3 to 4 weeks. He will have finished
digging around 15th Dec but he has cars to mend etc —
expect the quotation by 8 Dec.
13/12 - can dig the line once the water line is in,
approx. January 3rd Shannon talked to Automatic Access
and they are sending a sketch of the proposed gate should
have 13 Dec. As at 13h30, Shannon still did not have the
sketch and is still chasing.
13/12 - All the equipment for the security camera system
will be delivered 12/16 Mano will need to dig the trench
then the camera company and come back and install. All
equip. has been delivered. Mano will dig trench once
water line trench is complete.
24
EFTA00577684
FORTNIGHTLY REPORT
FRIDAY 13 DECEMBER
STATUS ITEM COMMENT
•> NC
t ptiak 4. Entry Gate vi)
vii) 27/11 - "Z". Should have by 15 Dec. Delayed until 2O
Dec.
13/12 - Lights have been rehung but Shannon's digital
camera is not working. She is purchasing a new camera
and will send the pictures as soon as she can.
+
+ NC
JE plse advise
how to proceed 5. Fountain viii) 13/12 — Additional more complete dimensions sent to
Pascal and a further fax sent 12 Dec.
ix) Correct quantity of tiles = 1,631 tiles.
+
+ Update
JE plse advise 6. Map x) 27/11 — Patrick drew map. GM thinks it looks great.
Patrick is back from Europe and Shannon will be working
with him to improve and add more info to map.
13/12 — As Patrick is in Palm Beach this is on hold.
Would JE like Patrick to return to Zorro to complete or
should Patrick attempt to complete from Palm Beach?
> Update 9. Survey xi) All easements have been signed. Once Land Use have
inspected site and confirm in order to run cables
overland, the easements can be filed and Utility Permit
issued. Santa Fe's Land Use and Planning Department
have completed site inspection in connection with permit
and variance to run the power lines overhead for 4 miles
to Zorro. He advised all looks okay and there should be
25
EFTA00577685
FORTNIGHTLY REPORT
FRIDAY 13 DECEMBER
STATUS
Update ITEM COMMENT
no problem, but that he had to consult with his boss. He
advised he'll contact our New Mexico lawyer in a couple
of days with the decision.
xii) 27/11 - Permit for overland laying of cables issued and
electricity company will now be attending to laying of
pipes.
13/12 — Expect to start digging to lay cables by early Jan
as the ground is frozen.
10. Electricity Plumbing xiii) The equipment used to dig the trench has broken down
due to the hardness of the rock that it is cutting through.
Should not delay expected completion date of 15 Dec.
There is only 1/2 mile left to go.
xiv) 13/12 - They have hit some tough rock it will take more
time to complete expect completion: 22 Dec
Update 11. Building for R0 xv) 13/12 — Doors have arrived and been installed. Shannon
will send a picture as soon as her camera is working.
xvi) 13/12 - Gormac Electric will supply quote for the
electricity for the water building week of 23 Dec.
26
EFTA00577686
FORTNIGHTLY REPORT
FRIDAY 13 DECEMBER
STATUS ITEM COMMENT
+ NC
+ JE to advise 12. Guest vehicle for ranch xvii) 27/11 — Larry supplied JE with further info & brochures
on Sprinter on 25 Nov. JE needs to advise how we are to
proceed.
+ Update 13. MH Trees xviii) JE approved 50 trees for $15k.
xix) Irrigation quotation estimation = $2,245.75 but
placement of last 20 trees has not been flagged so price
could increase. Final bill will reflect actual length of line
installed.
xx) 13/12 - Quote for purchase and planting of 50 x 7-8 foot
pinons including transport of trees - $12,772.50. These
will come from a nursery in Santa Fe.
+ NC
+ JE plse advise 14. 40 Ft Digital Screen xxi) JE still to advise on proposal received from Larry
Jacobson for cinema and drive-in.
+ Update
+ JE plse advise 16. Main House lutron system not
working properly. xxii) 27/11 — It sounds like there is a short in the system.
Gormac Electric is in touch with the Lutron Rep. & are
reviewing the configuration of the system and check that
all is working properly - will revert to Shannon by 8
Dec. —
13/12 - No short was found in the system, the system
needs to be adjusted to JE's needs. Can Shannon and
Rich attempt to set system according to JE's needs?
27
EFTA00577687
FORTNIGHTLY REPORT
FRIDAY 13 DECEMBER
STATUS ITEM COMMENT
Would JE prefer to do this himself on next visit.
+ Update 17. Phone for the new ranch
Vehicle (Hummer) xxiii) 13/12 — Phone installed in the front seat — phone number
is 505 670 9754.
+ Update 18. Lights for the Pool room (over
the pool) are falling out of the
ceiling xxiv) 13/12 - Replacement lights ordered — Arrival mid-Jan.
28
EFTA00577688
FORTNIGHTLY REPORT
FRIDAY 13 DECEMBER
LITTLE ST. JEFFS
STATUS ITEM COMMENT
+ Update 1. Fixed Roof Yoga Deck i) 13/12 — JE has plans for consideration. As per letter from
Charles Miller 13 Dec, this is to be placed on hold.
4 Update 2. Telephone system ii) 13/12 — Technician sourced by Charles Miller has been
on island and replaced cards & changed programs to
reduce problems with the system. Technician is locally
based & Miles is having him set up a monthly service
visit.
+ NC 3. Bali Shipment iii) 13/12 - Shipping company has apologized for delay due
to customs not releasing cargo until they verify that the
cargo is not stolen or historically significant artifacts -
cargo is still due in St. Thomas 20 Dec.
4 Update 4. Bamboo Flagpoles — Feng Shui
Flags iv) 13/12 - 10 are in place. Lights have been installed.
+
+ NC
JE to advise 5. Flags from LA v) 13/12 — Poles and flags have arrived and are on LSJ. JE
to advise on placement.
I. pilatc 6. Sea Water Pump vi) All ordered
13/12 — Partial order on LSJ, pump is in Miami and is
scheduled to ship end-Dec.
29
EFTA00577689
FORTNIGHTLY REPORT
FRIDAY 13 DECEMBER
STATUS ITEM COMMENT
• Update 7. Large Beach House Electricity vii) Awaiting delivery of transformers + all other electrical
stuff. Conduit has arrived. This project will not start as
originally stated due to the shipping delay. Miles
believes that it will start mid-Dec.
13/12 Material still not on island due to shipping delay
+
+ Update
JE plse advise 8. Maintenance & Storage Shed viii)
ix) P Kelly original deadline too optimistic (middle Nov).
The plans have still not arrived and Miles is still trying
to speak to P. Kelly P Kelly has not returned Miles calls
for 3 weeks. Perhaps with all the changes to the
maintenance building that JE is planning w/Tuttle if the
shed has not started manufacturing should it be
cancelled?
13/12 — Plans are now on island. JE to advise if order
must be cancelled.
+ NC 9. Car Seat Covers x) 27/11 — Material and seats delivered. Upholsterer cannot
give time frame at present.
+ Update 10. Puppies xi) 13/12 — Puppies are staying in Ohio until January.
+ Update 11. Shotgun xii) Application submitted — was expected 10 Nov now
delayed - authorities have not started the authorization
process yet. The application is subject to first come first
served basis - no date available.
30
EFTA00577690
FORTNIGHTLY REPORT
FRIDAY 13 DECEMBER
STATUS ITEM COMMENT
+
+ JE plse advise
Update xiii)
xiv) Do you want GM to get a permit?
13/12 - Police officer advises that permit is under
consideration and should have an answer week of 16
Dec.
+ NC 12. Music Systems / Electrical
Cars xv) 13/12 — Sound system in place. One vehicle is out of
operation as it has no seats.
+ Update 13. Mosquitoes / Sandflies xvi) 13/12 — The small fogger is on LSJ and fogging agent
will be dispatched. Should be at LSJ by 20 Dec. The
large fogger has been ordered and is being
manufactured. They expect to have this available to
send to LSJ by end-Dec. A mutually agreeable date for
training by Miles' selected staff is to be carried out
once JE leaves LSJ.
The total approved was $57,032.00 which included all
equipment, chemicals and training. Thus far $7,000.00
of equipment has been ordered and 20 gallons of
pyrethrum at a value of $2,780.00.
It may not be necessary to purchase the sandfly
injection system. A decision can be made at a later
stage subject to prior vector controls being carried out.
Please see attached breakdown of complete cost.
31
EFTA00577691
FORTNIGHTLY REPORT
FRIDAY 13 DECEMBER
STATUS ITEM COMMENT
Update 14. Helicopter Shelter &
Firefighting equipment xvii) 13/12 — Partial delivery of fire fighting equipment.
Balance of order due in St Thomas 18 Dec.
NC 15. Helipad Approach Lights xviii) Awaiting delivery of wire to complete the project. All
earth working complete. Supplies still affected by
shipping delay.
•+Update
JE plse advise 16.
17. New House Building Site xix)
xx) Surveyors have completed the layout of the corners of
the proposed structure. Bush has been thinned out.
Survey is complete and a copy already sent to Tuttle.
Miller sd that Tracy received boring quote for $40,000.
Miller has not seen it yet. Tracy talked to him about it
and Charles thinks that it is incomplete and too
expensive. He will talk and have more info from Tracy
week of Dec 2. Charles is investigating non-invasive
ground exploration techniques with radar which he
thinks will be more efficient and less expensive. Again
he hopes to have more info week Dec 2nd.
13/12 — Carlos Sanchez (architect) currently on island.
13/12 — Charles advised that a proposal has been sent
through to JE on the borings. Awaiting JE's approval.
4 NC Cart Paths Reduce Grades xxi) Project to start once earthmoving machinery on island
— dependent on permits. Machinery will not be brought
32
EFTA00577692
FORTNIGHTLY REPORT
FRIDAY 13 DECEMBER
STATUS ITEM COMMENT
on-island until permits to grade are approved & in
hand.
xxii) 27/11 — Permits not submitted as yet. All permits
grouped together & submitted at same time.
xxiii) 13/12 — Springline is currently working on the permits
and this is progressing.
+ Update 18. Dock xxiv) 13/12 - Barge is off island. Deck wood work complete.
Fenders & cleats on island.
xxv) 13/12 - Hardware arrived.
xxvi) Outstanding Items:
+ Electrical fittings & installation
+ Final design of the beach to dock approach and use
of extra 3 pilings driven before contractors left site.
+ NC 19. Plant Planters xxvii) Supplier in Puerto Rico is awaiting stock of 42 inch
high pots were due late-Oct but delayed. The items
will be delivered as soon as they become available for
JE approval — no date available.
+ Update 20. Poolhouse by Existing Pool xxviii) 13/12 — JE has plans for consideration. As per
Charles' letter of 13 Dec, Tracy is to continue with
this project.
33
EFTA00577693
FORTNIGHTLY REPORT
FRIDAY 13 DECEMBER
STATUS ITEM COMMENT
4
4 Update
JE plse advise 21. Main House Maintenance xxix) 13/12 — Ongoing — Majority of outer doors/hurricane
shutters now rotting and maintenance cannot
maintain. To rebuild would cost almost as much as
buying new doors. Miles is obtaining a quote for new
doors.
4 Update 22. Stuart Fullbright xxx) 13/12 — All plants are in the ground, mulched and area
by plants cleaned up.
+ Update 23. New Gym xxxi) 13/12 - Work has started on the roof trusses and roof
bond beam. Floor is on order through C Miller
delivery expected 5 January. Stonework, plasterwork
continues. Gym report sent to JE 12 Dec by NS — see
attached.
Carpet sizes
27 x 28 feet main room
12 x 15 feet for storage/equipment room
Lights:
7 exterior lights (need to be waterproof)
14 interior sconced lights
) Update 24. Main House Outside Lights xxxii) 13/12 - Box of blue lightbulbs sent down with GM.
Miles to install and JE to view (10 shades of blue, 10
of each bulb. Each bulb will be marked with a color
number (R60, R385 etc)).
34
EFTA00577694
FORTNIGHTLY REPORT
FRIDAY 13 DECEMBER
STATUS ITEM
+ Update 25. Steam Room xxxiii)
xxxiv)
+ Update 26. Items to Purchase xxxv)
xxxvi)
xxxvii) COMMENT
JE has advised he wishes the lightbulbs to be white
and between 60 - 80 watts. The Lightbulb covers are
to be misted.
Stand alone electric generator = $12,000.00
Miles says that he will not order the generator until
the building has commenced so that he can then
calculate accurately the power that is needed and
order the correct unit
Miller sd he saw Qualls' plans 15th Nov and asked
him to show them to JE. As per Charles's letter of 13
Dec, Tracy is to continue with this project. Once
permit in hand construction will take 1 month
13/12 - First Aid/Ambulance — On island — Cathy has
purchased some equipment and balance will arrive 18
Dec.
13/12 - Fire fighting equipment + suits for helipad —
Partial delivery of order. Balance due in St. T 18 Dec.
13/12 - Roll On / Roll Off Truck for garbage removal
etc. Miles supplied info on exact truck required and
Larry is still investigating as he has been busy with
the guard car negotiations.
35
EFTA00577695
FORTNIGHTLY REPORT
FRIDAY 13 DECEMBER
STATUS ITEM COMMENT
+
+ Update 27. MBR Curtain Rod xxxviii) 10/12 — Material sent to NY from LSJ to have made
up in NY.
13/12 — Curtain should be ready on Tues 17 Dec for
dispatch to LSJ by FedEx.
NC 28. Replace AC Units in Guest
Rooms xxxix) JE approved = $6,585.00
x I) Project will start in the new year as the process
involves removing roofs etc to gain access to the old
units - cannot be done whilst visitors are on island.
> Update 29. Irrigation xli) 13/12 — Deposit cheque for $29k sent by NY to LSJ 5
Dec. Once cheque received by Scott Graf all material
will be shipped. Once received should take
approximately two weeks to complete installation.
+ Update 30. Pond Pump xlii) 13/12 — NS awaiting response from JE - see attached
copy from message pad & facsimile.
+ Update 31. Dock Light xliii) 13/12 — Photo of light received by Charles and sent to
several distributors to find manufacturer or a very
close match. Charles cannot find a supplier and NS
will attempt to locate info when in Palm Beach on
Monday 16 Dec.
36
EFTA00577696
FORTNIGHTLY REPORT
FRIDAY 13 DECEMBER
STATUS ITEM COMMENT
+ JE plse advise JE plse advise if the cast cement lights on LSJ are
suitable?
+ Update 32. New Development xliv)
xlv)
xlvi) Generator for new building — Paul Gandy sourcing
correct generators & drawing up bubble diagram of
site utilities & building — submitting to Ed Tuttle to
design. Miller sd that he has stopped Gandy doing any
site specific work and he is now designing only
generic rooms — a generic generator/RO/fuel
storage/water storage building that can fit in any
building.
Cable Installation Costs:
7/12 — Globaltech has/is about to issue required info
to additional bidders. Globaltech been in contact with
Global Marine & solicited request for proposal. Paul
Gandy developed matrix for all installation costs &
completing estimate. Draft of incomplete copies
issued to Darren & Charles for comment. Estimate to
be issued week of 16 Dec.
13/12 — Permit sent to Governor to sign & once
signed will be sent to legislature for enactment. Corp
of engineers still to issue their 30 day advertisement
of project — Amy is chasing the corp. Dep write-off
per Amy Dempsey written and about to be issued.
37
EFTA00577697
FORTNIGHTLY REPORT
FRIDAY 13 DECEMBER
STATUS ITEM COMMENT
•; NC 33. Tiles for Beach Hut xlvii) These have been ordered from Pinto's office at the 20
x 20 size. Linda Pinto has advised order will be ready
in Dec and will DHL direct to LSJ 15 Dec.
+ Update 34. Flickering Lights — Great
Room xlviii) 27/11 — 2 samples of flickering lights sent to LSJ —
standard and chandelier.
13/12 — 10 x 60 watt bulbs sent to LSJ. Various bulb
shops and lighting consultant have confirmed that
there is only one type of flickering bulb made.
+
+ Update
JE to advise 35. Build glass screens around the
pool area - block wind & allow
view xlix) 13/12 — These have been installed and completed.
+ Update 36. MBR Shelving I) 13/12 - Complete
+ Update 37. Replace motors in Seamore and
Nanna li) JE authorized the installation of a new motor in
Seamore
Seamore motor is still under discussion between
various parties to determine the best fit for this boat.
The entire project is not due to start until the new year
therefore Miles is ensuring that the best fit and
discussions are made. Miles will have a proposal Th
38
EFTA00577698
FORTNIGHTLY REPORT
FRIDAY 13 DECEMBER
STATUS ITEM COMMENT
Dec to show JE
JE is looking for two 300 horsepower motors for
Nana. Yamaha are scheduled to bring out these types
of motors in New Year. Mercury do have 300
horsepower engines but Miles wants to wait for
Yamaha which he says will be better.
13/12 — Miles has proposals for JE's consideration.
+ Update 38. Extra pilings for dock. Hi) 13/12 — Steel pilings are in place and Tracy Roberts
ordered the moulds so the pilings can be encased in
cement. Moulds to be made week of 16 Dec.
+ Update 39. New Boats liii)
liv) 27/11 — Offer was made on the boat which was
accepted pending JE undertaking successful sea trials
this week.
13/12 — JE has approved purchase of staff catamaran
pending boat surveyor checking hull and approval
thereof. Boscoe & surveyor pulling staff catamaran
out of water and checking hull on Monday 16 Dec.
$5k deposit paid. Boat will be purchased for $135k if
okay received from surveyor.
> NC 40. Helicopter Training lv) January dates available in Dallas:
39
EFTA00577699
FORTNIGHTLY REPORT
FRIDAY 13 DECEMBER
STATUS ITEM COMMENT
3 slots January 20-24
2 slots January 27-31
Update 41. New Coconut Trees lvi) 9/12 - Madison Cox sent 11 coconut trees (growing at
different angles) to LSJ as per JE approval. These
replace 11 trees on beach making beach line more
natural. These have been planted and area made good.
Trees removed to be planted around engineering — in
progress.
+ NC 42. Wind Generator lvii) Mr Epstein has placed positioning on hold.
+ NC 43. Floating Dock lviii) Floats and hardware on island. Fabrication to
commence once new dock complete — on hold
woodshop concentrating on new gym & heli hut.
+ NC 44. Retaining Wall around
Lookout House (Blue) lix) On hold — woodshop concentrating on new gym &
heli hut.
+ NC 45. Build Side screen MBR &
Move Steps lx) On hold — woodshop concentrating on new gym &
heli hut
+ NC 46. Plexiglass Weave Experiment lxi) On hold — woodshop concentrating on new gym &
heli hut
+ NC 47. Glass Garage Type Doors lxii) On hold — woodshop concentrating on new gym and
heli hut
40
EFTA00577700
FORTNIGHTLY REPORT
FRIDAY 13 DECEMBER
STATUS ITEM I COMMENT
• NC 48. Parrot at Entrance lxiii) On hold — woodshop concentrating on new gym &
heli hut.
• NC - Ongoing 49.Poly Pavement Dust Prevention lxiv) Process on hold whilst gym is being erected. Miles
continues to spray roads with water to ease dust
levels.
****************************
41
EFTA00577701
📷 Images in this document (41 detected; 6 largest described)
AI-generated factual descriptions of embedded images (llava:13b). These are searchable across the corpus.
[Image 1] The image shows a document with text and a table. The document appears to be a report or a summary of information, possibly related to a meeting or a project. The table at the top lists items such as "NC," "NC," "NC," and "NC," with corresponding numbers and dates. The text below the table seems to be a summary or commentary on the items listed in the table. The document is a scan, and the text is
[Image 2] The image shows a document with text, which appears to be a page from a report or a meeting agenda. The document is titled "Puerto Rico's Benefit Friday 12 December." It lists several items with corresponding comments. The visible text includes names, dates, and a reference to a letter. The document is structured with headings and bullet points, indicating a formal or official context. The text is
[Image 3] The image shows a document with text, which appears to be a meeting agenda or minutes. The document is titled "Friday 14th December 2001" and lists several items under the heading "Status". Each item is followed by a date and a brief description or comment. The text is organized in a table format with columns for "Status", "Item", "Date", and "Comment". The visible text includes names, dates, and
[Image 4] The image appears to be a photograph of a printed document, possibly a letter or a report. The document contains text with various headings and bullet points, which seem to be related to a discussion or a report on a specific topic. The visible text includes headings such as "Status," "Entry," "Item," "Comment," and "Survey." There are also bullet points with text underneath, which are likely to c
[Image 5] The image shows a document with text, which appears to be a list or a table with columns and rows. The document is titled "Friday 13th December" and includes sections such as "Status," "Item," "Comment," and "Updates." There are entries with dates, numbers, and descriptions, which seem to be related to inventory, maintenance, and delivery updates. The text is organized in a structured format, typi
[Image 6] The image shows a document with text, which appears to be a list or a report of some sort. The text is organized in a table format with columns and rows. The visible text includes names, dates, and possibly some numbers or codes. The document seems to be related to a work or project status update, as indicated by the phrases "Status Update" and "Working Status." The names mentioned are Patrick, Ev