Zorro Ranch Projects / Tasks List
Zorro Ranch Projects / Tasks List
PROJ.
SORT ASSIGN. DATE & DESCRIPTION STATUS COMP.
TO DATE
JE 3/13 Zorro Ranch water status Memo 3/12/01
HM Advise Tamera that there needs to be water and food
for Max at all times. Add details to house hold
manual 3/15
complete
3/21 Quote to repaint garage doors in shop area 3/23 Will cost $875.00 will show GM JE
when they arrive 3/30
2/28 Fix the crumbling column in the estancia Alice arranged for Les Files to come out in
April — it needs to warm up.
Adrian is re airin 3/28 3/29
complete
2/27 Give Jeff note book for JE walk throughs 3/15
complete
2/27 Frame the island pictures Pictures taken to Absolute Framing on 3/8
Expect completion 3/29 3/29
2/27 Have someone repair green fountain tiles Vernon tiles will come out in April to repair
tiles. It needs to warm up
Have Western Systems come out to install sound
system when it arrives for Breakfast rm Sound system arrived 3/22
3/23 Western Systems will be out Friday
3/30 to install
Has been installed but the remote is not
working so Western Systems is trying to 3/28
complete
SORT KEY
JE- Mr. Epstein GM- Ms. Maxwell DI- Decorating Issues FC- Future Construction Issues HM- House Manual 1
EFTA00578182
Zorro Ranch Projects / Tasks List
PROJ.
SORT ASSIGN. DATE & DESCRIPTION STATUS COMP.
TO DATE
troubleshoot 3/28
3/28 New Remote has arrived Mike is
ro ramming
Loggia spot lights not the correct size they need to be
replaced with lower profile lights called Service Electric on 3/12 and
3/15
Purchased new lights 3/24 Called Service
Electric 3/26 waiting for return call
Service Electric is coming out 3/28
Service Electric is here 3/30
2/27 Purchase alarm clocks for guest bedrooms MH
and guest lodge Total of 6 4 have been purchased still need 2 more
(Blue rm and 1 for guest lodge) 3/22
Complete
Blue Mobile home to be moved to gravel pit Electric disconnected 3/13
Phone disconnected 3/13 3/14
Complete
2/27 Have the courtyard tree lights repaired Fixed 3/10 — Transformer was out 3/10
complete
2/26 Get a price on the butternut carpet sample for
the bunkhouse Sue will be out to measure bunkhouse to
give an estimate2/26
Will have prices 3/27 for GM approval
2/25 Get estimate to repair roads Estimate sent to GM and Eric 3/13
E-mail from 3/21 not doing the roads
per JE
GM has asked us to explore other options.
Call Larry to investigate road equipment
options to maintain roads in usable
SORT KEY
JE- Mr. Epstein GM- Ms. Maxwell MI- DI- Decorating Issues FC- Future Construction Issues HM- House Manual 2
EFTA00578183
Zorro Ranch Projects / Tasks List
PROJ.
SORT ASSIGN. DATE & DESCRIPTION STATUS COMP.
TO DATE
7 condition.
3/15 Repair stone diamonds in front motor court at
MH Masons are working on the repairs 3/15 3/22
complete
Repair transmitting station for wells. (controls the
water level in the tank) 3/20 Val Comm to give a proposal to repair
or replace transmitters
3/23 Desert Scene painting from Leah's 3/26 Mike to Hang 3/20
complete
Hook up voice mail to GM line 832 1746 3/23 Val Comm is going to hook up the
voice mail because it is on a microwave line
3/28 should be on by Monday 4/1
3/28 to purchase answering machine
for GM to use until voice mail is hooked u
DI Pinto Replacement plate for estancia wall
DI Pinto Light fixture to replace 2 in JE and GM master bdrm
hall
DI Pinto Sheer curtains for the arches in the hallway in front
of the living room Dimensions sent to Pinto 3/21
JE Mike Jeff 3/8 Hang the cross in the upper library 3/22 Mike is going to look for the studs to
see if the cross can be centered. E-Mail with
hanging options will be sent
SORT KEY
JE- Mr. Epstein GM- Ms. Maxwell DI- Decorating Issues FC- Future Construction Issues HNI- House Manual 3
EFTA00578184
Zorro Ranch Projects / Tasks List
PROJ.
SORT ASSIGN. DATE & DESCRIPTION STATUS COMP.
TO DATE
3/283/22.WINDOWS1DesktoplCamera
pics.11cross.JPG
JE Mike 2/27 sketch shelves for the massage room and send to
JE
Mike Mike to make bases for library vestibule tables
Mike 2/27 make 2 10 ft benches out of the timbers for the
loggia
Mike 2/27 Change cords on the light in the library
vestibule to a black one 3/5 Service Electric changed one cord Mike
to change the second
Mike Order steam room door sweeps Mike has installed the sweeps but the still
are not the correct size. Alice is working on
locating sweeps 3/19
3/21 Piece being shipped from Denver
3/28 Di ital .ictures sent to Alice
Mike Build Motor court gates at MH Gates have been built will be hung 3/20
Mike is working on the pole barn — weather
is good so gates on hold 3/20
complete
Mike Red doors into tables
Mike Sand and seal tables and benches for the main house
SORT KEY
JE- Mr. Epstein GM- Ms. Maxwell MI- DI- Decorating Issues FC- Future Construction Issues HM- House Manual 4
EFTA00578185
Zorro Ranch Projects / Tasks List
PROJ.
SORT ASSIGN. DATE & DESCRIPTION STATUS COMP.
TO DATE
7 Mike Guest lodge — repair crawl space enclosure
Mike Chicken coop to be moved to area near stabels
Mike Screen doors to be repaired at bunkhouse, Shannons
house and office
Mike Ventilation at pump pit for ranch central
Mike Repair French doors at Bunkhouse
Mike 2/27 Cover hole in wall under the yellow bedroom
sink at MH 3/20
complete
Mike Estancia pews Mike received JE instructions 3/14
Mike Close in Sterilizer
Mike Pole barn enclosure We can only work on the pole barn in the
mornings because the wind picks up in the
afternoon. Mike has 1/2 the siding on 3/21
3/30 Mike has % of the siding up
SORT KEY
JE- Mr. Epstein GM- Ms. Maxwell DI- Decorating Issues FC- Future Construction Issues HM- House Manual 5
EFTA00578186
Zorro Ranch Projects / Tasks List
PROJ.
SORT ASSIGN. DATE & DESCRIPTION STATUS COMP.
TO DATE
7 Mike The guest lodge sliding glass door does not lock
Manolito 3/14 Take down the TV screen in the bunkhouse
living nn and put into storage
Manolito 3/14 Hang ranch blueprints in garage
Manolito Clutch on the water truck is broken Truck taken to be repaired should return
3/23 3/17
complete
Lany Larry is ordering TV for breakfast room TV arrived 3/7 3/8
complete
JE Jeff Mike 2/27 The screw that is on the exercise room door
knobs should be filed down Jeff to replace door handle 3/15
3/22 Jeff has put the handle on the door for
JE approval 3/23
complete
JE Jeff 2/27 The lights on the LR mantel are too tall find low
profile lights Purchased 3/9. The new lights are not
strong enough to light up the painting. Need
more instructions.
JE Jeff 2/27 The LR gallery painting should have two lights
mounted on the table that will shine on the painting.
The lights should be similar to the ones on the LR
mantel. Send pictures for approval Jeff said that he could not find lights that
would mount on the table. Please advise if a
cord across the floor is acceptable.
JE Jeff Landscape lights for Main House All lights have been ordered. They will take
approximately 20 days from order date to
arrive. Expected April 4. left
SORT KEY
JE- Mr. Epstein GM- Ms. Maxwell DI- Decorating Issues FC- Future Construction Issues HM- House Manual 6
EFTA00578187
Zorro Ranch Projects Tasks List
PROJ.
SORT ASSIGN. DATE & DESCRIPTION STATUS COMP.
TO DATE
message for electrician to call 3/19
Message left 3/26
3/28 Scheduled for April 5th
JE Jeff 2/27 When the painting of the Spanish nude with
black hair arrives it is to be hung in front of the
telescope. Send picture to JE first Picture sent to JE 3/21 per his request
3/22
Complete
JE Jeff 3/28 Jeff to give proposal on hanging cross 3/28Proposal sent to GM and on 3/28.
3/29 we would like to wait for JE
instructions before we hang cross, it is more
involved then ex ected
GM Jeff 2/27Research auto pool vac Requesting your approval to purchase pool
vac for $549.00
GM Jeff 2/27 Purchase brown utility shed for MH 3/12 has brochures, Jeff to stake
out proposed area.
3/22 has been staked for approval
Jeff 2/27 Purchase light fixture in UL ceiling to tilt and
shine on easel Jeff purchased 3/10. Jeff is going to see if
he can install himself 3/15
3/29 Jeff is going to purchase 3 fixtures for
JE a royal
Jeff 2/27 When the painting of the dessert scene arrives it
is to be hun o osite the telesco in the UL 3/22
com lete
Jeff Jeff to measure the pool doors at the main house for
Gary Measured and faxed to Gary 3/13 3/13
Complete
SORT KEY
JE- Mr. Epstein GM- Ms. Maxwell DI- Decorating Issues FC- Future Construction Issues HM- House Manual 7
EFTA00578188
Zorro Ranch Projects / Tasks List
PROJ.
SORT ASSIGN. DATE & DESCRIPTION STATUS COMP.
TO DATE
7 Jeff CD player is being repaired Picked up 3/13 3/13
complete
Jeff The stakes for the MH drive should be 24 inches and
have flat tops. Around the curves they should get
closer together. They should have whiter square
reflectors
Jeff 2/27 Purchase flood lights over terrace, MB balcony,
back wall at library Purchased 3/9. Will be installed with
landscape lights
3/26 Shan. Called Service Electric to get
installation date —waiting for call back
Service Electric will be out 3/28
Service Electric is here 3/29
Jeff 3/28 Jeff to power wash the diamonds in the front
motor court
Jeff 3/28The stack of wood near the microwave dish
needs to be relocated for the visit Advised Jeff 3/27 3/28
3/29
com lete
GM 3/12 Train Wolfhounds and Duke???? 3/28 The cost is 63.50 for each dog. The
classes are for 8 weeks, once a week.
Waiting for GM approval. Does Duke need
to go?
3/15 Purchase emergency kits for each vehicle Manolito ordering 3/28
SORT KEY
JE- Mr. Epstein GM- Ms. Maxwell DI- Decorating Issues FC- Future Construction Issues HM- House Manual 8
EFTA00578189
Zorro Ranch Projects / Tasks List
PROJ.
SORT ASSIGN. DATE & DESCRIPTION STATUS COMP.
TO DATE
David 3/15 Remove remainder of the cactus on the ranch 3/30 David will begin mid April 6/1
JE Where should the telescope be located? JE to decide location.
JE
JE
JE Lean too and water troft should be painted Token
brown Sample on lean too for JE approval
2/27 Mechanical room door is warped 3/23 Mike is repairing the door front 3/20
3/23
complete
Construct North Terrace at Main House Monarch is taking out the walls3/14
Memo from Alice sent to JE 3/19 re: paving
3/22 waiting for instructions
2/23 JE approved the $5,183.00 quote for
concrete. We are waiting for the 200 pieces
of stone to arrive before they can lay the
concrete. Stone should arrive in 2 weeks
April 7?
JE 3/24 Paint the balustrade the same color as the main
house 3/26 Painters are on site
Painting on a time and materials basis.
HM
GM 3/12 Advised Jeff not to take dogs during a visit
Add to household manual 3/15/
complete
2/27 Ask Pinto about the painting design for the
balustrade has sent a memo to Pinto 2127
Memo 3/5
SORT KEY
JE- Mr. Epstein GM- Ms. Maxwell M- DI- Decorating Issues FC- Future Construction Issues MI- House Manual 9
EFTA00578190
Zorro Ranch Projects / Tasks List
PROJ.
SORT ASSIGN. DATE & DESCRIPTION STATUS COMP.
TO DATE
left message 3/7 for GM to talk to
Pinto in Europe
Memo to GM 3/19
Memo sent from GM 3/21
3/23 JE has approved same color as the
house. 3/28 Requested quote from Bobs.
GM 2/27 There should be something that sits on the top of
the heads in the hall near GM office GM to buy candles or something
appropriate
GM
2/27 Purchase two more carpets for the main hall
downstairs they should duplicate the one that is
existing but with brighter colors 3/17 We have placed 3 rugs in this area.
3/17 Pictures have been sent for GM
approval.
Approved and in place 3/20 3/20
complete
GM
GM 2./27 The guest hall needs more photographs
2/27Talk to Ricardo about the roof tile designs for
landscape beds Gm sent Ricardo fax.
JE discontinued the services of Ricardo
JE meeting with new designer
GM 2/27 Purchase 70 inch picture light is needed for the
painting of the girl in the main stair hall. Order 4 30
inch lights per GM 3/23 Mike and Jeff hanging lights 4-30 inch
lights. Spoke to 3/23 and will send
pictures.
3/20 Installed one set of 30 inch lights.
Waiting for GM/JE approval
SORT KEY
JE- Mr. Epstein GM- Ms. Maxwell DI- Decorating Issues FC- Future Construction Issues NM- House Manual 10
EFTA00578191
Zorro Ranch Projects / Tasks List
PROJ.
SORT ASSIGN. DATE & DESCRIPTION STATUS COMP.
TO DATE
GM 2/27 Purchase 52 inch picture light of the girl in the
princess staircase
GM 2/27 Purchase light for the painting in the LR gallery
should be 80 inches 3/23 Mike and Jeff hanging lights 2-40inch.
Spoke to 3/23 and wills send pictures
GM 2/27 Purchase rug for library bathroom 7ft 45inches Arrived and placed 3/15 pictures sent 3/15 3/15
complete
GM 2/27 Purchase rug for basement (end of the main stair
hall)
GM 2/27 Purchase 15x15 rug for exercise room Arrived and placed 3/15 3/15
complete
GM 2/27 Purchase rugs for the east corridor 4 1/2 ft wide x
? The rugs should follow down the hallway upstairs
GM 2/27 Purchase new rug for pool gym hallway 41 x 6 3/22 Ordered Zebra Rug 3 weeks ago from
ABC
3/23 should arrive 3/30 per
GM 2/27 Purchase Estancia furniture
GM Zorro pottery
GM GM to send black and white pictures for frames in
upper library Photo dimensions 22 x 15 % inches
SORT KEY
JE- Mr. Epstein GM- Ms. Maxwell DI- Decorating Issues FC- Future Construction Issues HM- House Manual 11
EFTA00578192
Zorro Ranch Projects / Tasks List
PROJ.
SORT ASSIGN. DATE & DESCRIPTION STATUS COMP.
TO DATE
GM 2/27 Larger photos are need for the garage
GM 2/27 Replace all globe light fixtures
GM 2/27 Take digital photos of the furniture shipment
that arrives from Leah's Shipment arrived 3/7
Digital photos sent to GM 3/7 to ask for
placement instructions
Photos send 3/17
GM Need extra sheets for the guest bedrooms at the main
house (yellow and blue rooms)
GM 3/21 Three rugs have arrived for the main house
Need to know location 3/21 pictures sent to 3/21 3/22
complete 3/22 Have been placed in basement near
elevator
GM Make new easel crank that is larger GM to try to locate original crank
GM 3/23 Mangel ironer training at the MH 3/23 The company does not give training
because it is meant for table linens not
sheets. The girls will practice.
Does GM want us to pursue further?
Build 3 17x 20 frames and 3 17x22 inch frames made
out of dark wood 3/30 advised that GM wants
to locate a photo shop to make frames
2/27 When the large chess set arrives it belongs in the
north garden Arrived 3/8 will be placed 3/16 3/16
complete
SORT KEY
JE- Mr. Epstein GM- Ms. Maxwell M- DI- Decorating Issues FC- Future Construction Issues HM- House Manual 12
EFTA00578193
Zorro Ranch Projects / Tasks List
PROJ.
SORT ASSIGN. DATE & DESCRIPTION STATUS COMP.
TO DATE
2/27 Check telephone in exercise room The house is not wired for a telephone in
the massage room - plate to be installed
over circuit and Bobs paint to touch u. 3/9
complete
Find snow melt that contains OJ 3/30 advised high priority will
begin April 1
Stone urns to be sent back to NY when delivered to
the ranch Shipped 3/6 to 71g street 3/6
complete
Assemble balustrade at main house They are caulking the balustrade 3/14 will
take 2 weeks to finish weather permitting 3/27
complete
Paint large ranch house 3/15 the house is half painted weather
permitting should be complete 3/20 3/20
complete
Ranch Central - the stables should be painted the
same color as the inside As soon as it warms up Bobs paint can
begin
3/22 Samples on barn
2/27 Paint he shelves in the garage the same color as
the walls Bobs paint will be out the week of the 19th
of March. 3/26/
Complete
Main House phone lines have interference and poor
reception Val Comm and Sawyers are trouble
shooting problems. 3/28 Sawyers is Fed
Exing a new CPU card.
3/28 Val-com and Sawyers are
reprogramming the system
SORT KEY
JE- Mr. Epstein GM- Ms. Maxwell DI- Decorating Issues FC- Future Construction Issues NM- House Manual 13
EFTA00578194
Zorro Ranch Projects / Tasks List
PROJ.
SORT ASSIGN. DATE & DESCRIPTION STATUS COMP.
TO DATE
SORT KEY
JE- Mr. Epstein GM- Ms. Maxwell MI- DI- Decorating Issues FC- Future Construction Issues HM- House Manual 14
EFTA00578195
Zorro Ranch Projects / Tasks List
PROJ.
SORT ASSIGN. DATE & DESCRIPTION STATUS COMP.
TO DATE
7
SORT KEY
JE- Mr. Epstein GM- Ms. Maxwell DI- Decorating Issues IT- Future Construction Issues HM- House Manual 15
EFTA00578196
📷 Images in this document (15 detected; 6 largest described)
AI-generated factual descriptions of embedded images (llava:13b). These are searchable across the corpus.
[Image 1] The image shows a document titled "Zorro Ranch Projects / Tasks List." It appears to be a list of tasks or projects with associated dates, names, and descriptions. The document includes columns for "Task," "Date," "Name," and "Description." There are several tasks listed, each with a date and a name associated with it. The tasks seem to be related to a project or set of tasks, possibly for a ranch
[Image 2] The image shows a document titled "Zorro Ranch Projects / Tasks List." It appears to be a list of tasks or projects with columns for "Task," "Date," "Description," and "Status." The document includes a table with rows of tasks, dates, descriptions, and status indicators such as "Completed," "In Progress," and "Not Started." The tasks listed are related to construction or maintenance projects, and
[Image 3] The image shows a document titled "Zorro Ranch Projects / Tasks List." It appears to be a list of tasks or projects with associated dates and descriptions. The document includes columns for "Task," "Date," and "Description." There are several tasks listed, each with a unique date and a brief description of the task. The document is structured in a table format, with rows of text organized in colum
[Image 4] The image shows a document titled "Zorro Ranch Projects / Tasks List." It appears to be a table with columns for "Task," "Date," and "Description." The document lists various tasks with dates and descriptions, but the specific details are not clearly visible due to the resolution of the image. The text is too small to read accurately, and the document is partially obscured by a red rectangle, maki
[Image 5] The image shows a document titled "Zorro Ranch Projects / Tasks List." It appears to be a table with columns for "Task," "Date," and "Status." The table contains rows with various tasks listed, along with dates and status indicators such as "Completed," "In Progress," and "Not Started." The document seems to be a project management tool used to track tasks and their status within a project.
[Image 6] The image shows a document titled "Zorro Ranch Projects / Tasks List." It appears to be a list of tasks or projects with columns for "Task," "Date," and "Status." The tasks are listed with a date and a status, which seems to be either "Completed" or "In Progress." The document includes a header with the title and a footer with a date and a signature, indicating it is a formal document. The text is