Accelerating India%E2%80%99s Energy Transition through Industrial Clusters 2025

Page 5 of 13 · WEF_Accelerating_India%E2%80%99s_Energy_Transition_through_Industrial_Clusters_2025.pdf

FIGURE 2 State Wise Policy Overview RE: Target of 100 GW RE capacity by 2030. Subsidies for consumers and providers. GH2: Aligns with the NGHM. with a target of 3 million metric tonnes by 2030. Capital subsidies, waivers, and exemptions available. EV: Deploy 200k EVs by 2025. Subsidies and financial incentives available. WtE: Use of MSW for electricity generation. Incentives include subsidies, land allocation, and various exemptions. Gujarat1 RE: Target of 17,360 MW RE projects by 2025. Personnel support for large-scale projects and rural electrification provided. GH2: Production capacity of 500k TPA by 2030. Financial incentives include capital subsidies, concessions, exemptions and direct funding. EV: Accelerate adoption across various segments. Financial incentives available for consumers and suppliers. WtE: Target of 200 MW capacity. Subsidized rates, reimbursements, and exemptions available. Maharashtra2 RE: Aim to be 100% RE-based by 2040 and net-carbon neutral by 2050. Guidelines for FSPV projects approved, 3GW capacity targeted. GH2: 10% (by vol.) GH2 blending by 2030 and reduce cost to /uni20B9200/kg by 2030. Subsidies to establish hubs and promotion for transport sector. (in draft) EV: Increase EV adoption and electrification of public transport. Incentives include subsidies, preferential interest rates, and buyback programme. WtE: Significant strides in implementing the Solid Waste Management Rules of 2016. Kerala3 RE: Achieve at least 42% share of RE by 2030. Incentives include a RE Fund, exemptions from electricity duty, and waived power charges. GH2: Policy to develop GH2 and GNH3 hubs released in 2022. Currently developing policy to develop GH2 ecosystem. EV: Accelerate adoption of EVs and battery EVs. Subsidies for consumers, manufacturers, and charging stations available. WtE: Promote use of biodegradable waste for electricity generation. Priority land allocation and electricity duty exemptions available. Odisha4 RE: Target 160 GW RE capacity by 2030 with investment potential of approx. /uni20B910 lakh crore ($119 billion). Capital subsidies, concessional lease rates, and exemptions available. GH2: Production of 0.5 MTPA within 5 years with 12,000 jobs created. Reimbursements and electricity duty exemption available. EV: Carbon neutrality in transport sector by 2047. Financial subsidies for manufacturers, charging stations, and consumers. WtE: Promote use of MSW and other biodegradable waste for clean energy production. Various exemptions and favorable land purchase agreements. Andhra Pradesh5 RE: Targets to derive 50% of its total energy consumption from RE and 70% carbon emissions reduction by 2030. GH2: Conducted a study on electrolyser manufacturing in Tamil Nadu. EV: 30% electrification of buses and electric conversion of shared mobility fleet by 2030. Tax exemptions, reduced registration fees, and subsidies available. WtE: Significant strides in implementing the Solid Waste Management Rules of 2016. Tamil Nadu6 Notes: RE: renewable energy, GH2: green hydrogen, EV: electric vehicles, WtE: waste to energy Sources: State-Wise Policy Overview: ET (Gujarat Aims for 100 GW RE); TOI (Gujarat GH2 Target); Govt of Gujarat (RE Policy 2023; EV Policy 2021; Environmental Clearance Notification); Gujarat Energy Development Agency (GH2 Policy); Maharashtra Energy Development Agency (RE Policy 2020; W2E Policy; Bio Energy Overview); Govt of Maharashtra (EV Policy 2021); MK Research (Maharashtra GH2 Policy 2023); Earth Journalism Network (Maharashtra RE MoUs News); Govt of AP (Integrated Clean Energy Policy 2024; GH2 & GNH3 Policy 2023; EV Policy 4.0 (2024–2029)); JMK Research (AP Integrated Clean Energy Policy 2024); Sunsure Energy (ICE Policy News Article 2024); Govt of Odisha (RE Policy 2022; EV Policy 2021 – Amended 2023);Outlook Business (Kerala GH2 Pilot News);ANERT (GH2 Vision – Kerala); KSEB (EV Policy 2023: Recommendations); Kerala Solid Waste Management Project (State Implementation Overview); Invest Kerala (RE Avenue); Renewable Watch (2024, Kerala & Maharashtra GH2 Plans); MNRE (Draft Repowering & Life Extension Policy for Wind Electric Generators 2024); The Indian Express (TN GH2 Policy Intent); Govt of TN (Solar Energy Policy 2019; EV Policy 2019 & 2023); CPCB (Solid Waste Management Rules, 2016).
Ask AI what this page says about a topic: