FM Broadcast Rules i 807 


FCC 63-765 
BEFORE THE 
FEDERAL COMMUNICATIONS COMMISSION 
Wasutneton, D.C. 20554 


In the Matter of : ; 
Revision or FM Broapcasr Roures, PARTICU- 
LARLY AS TO ALLOCATION AND TECHNICAL 
STANDARDS om. Docket No. 14185 
Petition of FM Unlimited, Inc., for 
Changes in FM Station Assignment 
Rules 


SUPPLEMENT TO THIRD REPORT, MEMORANDUM OPINION AND ORDER 


By THE Commission: COMMISSIONER Cox DISSENTING. 

1. On July 25, 1963, the Commission adopted its “Third Report, 
Memorandum and Order,” (FCC 63-785), finalizing a Table of FM 
Assignments. The Table, as adopted July 25, contained an assign- 
ment of Channel 243 to Battle Creek, Michigan, representing a con- 
struction permit under which authority Station WELL-FM began 
operating June 14, 1963. 

2. On July 23, 1963,’ Southern Michigan Broadcasting Corpora- 
tion, permittee of WELL-FM; filed a late pleading in this Docket 
proposing a series of channel changes in Michigan. As grounds for 
the requested: changes, Southern Michigan states that the operation 
of WELL-FM on Channel 243 has been found to cause extensive 
problems with the reception of television Stations WILX-TV and 
WMSB, sharing time on Channel 10 at Onandaga, Michigan, owing 
to inadequate selectivity on the part of many television receivers in 
the area wherè WELL-FM is located. In order to resolve this prob- 
lem by shifting WELL-~FM to some other frequency, the licensees 
of WELL-FM and WILX-TV have worked out a plan with the 
licensee of WSTR-FM,: Sturgis, Michigan, involving frequency 
changes for both FM stations and for one other proposed assign- 
metit.: The licensee of Station WSTR-FM would be reimbursed by 
the otlier two parties for the expenses involved in making the change, 
in an amount not to exceed $3960.00. 

8. The type of “interference” mentioned herein to television recep- 
tion from FM stations is essentially a problem of receiver design 
and can usually be.corrected by the installation of wave traps at the 
receiver. For this reason, “interference” to television service is not a 


, 1 Because the final Table as adopted on July 25, 1963 was modified in many particulars 

from the Table proposed ‘last December, the other modification in the plan submitted by 
WELL-FM. is no. longer necessary, However, two -further modifications of unoccupied 
assignments in the Table adopted July 25 would be necessary. 


40 F.C.C. 


808 Federal Communications- Commission Reports 


factor ordinarily taken into account in the assignment of FM chan- 
nels. In this particular case, however, where the parties have agreed 
upon a relatively simple solution which will eliminate the necessity 
of installing wave traps on many thousands of home television re- 
ceivers, we believe that the channel changes suggested would serve 
the public interest. Although the change of WELL-FM from Chan- 
nel 243 to Channel 277 involves a “short-spacing” of approximately 
5 miles to an adjacent channel station in Detroit, the spacing situa- 
tion for WELL-FM on Channel 277 is actually better than on Chan- 
nel 243, where WELL-FM was somewhat under minimum spacings 
to both a co-channel and an adjacent channel station. The changes 
adopted herein are subject, of course, to coordination with Canadian 
authorities. oe 

4. In view of the foregoing, and pursuant to the. authority con- 
tained in Sections 4(i) and 303(r) of the Communications Act of 
1934, as amended, /¢ is ordered, That the Third Report, Memoran- 
dum Opinion and Order adopted July 25, 1963 (FCC 68-735), Zs 
modified to the extent that the Table of Assignments contained in 
Appendix A, Section 3.202(b), is changed with regard to the cities 
named below (only), to read as follows: 


Channel 

City No. 
Battle Creek, Michigan__..-_..--.-----..--.------------------- 277 
Cadillac, Michigan_.___.- 225, 278 
Sturgis, Michigan.._.--_. 257A 


Columbia City, Indiana. 292A 


5. It is further ordered, That, pursuant to Sections 303 (£) and 316 
of the Communications Act of 1934, as amended, the following modi- 
fications of license or permit are effected with the consent of the 
licensees involved : 

(a) The permit of Southern Michigan Broadcasting Corpora- 
tion for Station WELL-FM on Channel 243 at Battle Creek, 
Michigan, is modified to specify operation on Channel 277, sub- 
ject to the condition that the licensee submit to the Commission 
by September 11, 1963, all information necessary to comply with 
the applicable technical rules, executed in triplicate, for the 
preparation of the modified authorization to cover the operation 
of Station WELL-FM on Channel 277 at Battle Creek. 

(b) The license of Water Wonderland Broadcasting Com- 
pany, Inc. for Station WSTR on Channel 276 at Sturgis, Michi- 
gan, is modified to specify operation. on Channel 257 A subject 
to the condition that the licensee submit to the Commission by 
September 11, 1963, all information necessary to comply with 
the applicable technical. rules, executed in triplicate, for the 
preparation of the modified authorization to cover the operation 
of Station WSTR on Channel 257 A at Sturgis. ~ 

6. It is further ordered, That, the above-named licensee and per- 
mittee may continue to operate with their present authorization until 
they are ready to commence operation.on the new frequencies in 
accordance with the orders of modification herein; and that, upon. 


40 B.C.C. 


FM Broadcast Rules 809 


completion of construction of their new facilities in accordance with 
the terms of the modified authorizations, each licensee or permittee 
shall submit, in triplicate, proof of performance measurement data 
necessary to demonstrate compliance with the applicable technical 
performance requirements of the rules of the type normally required 
to be furnished in an application for an FM license, at least ten days 
prior to the date on which it is desired to begin program operations 
on the new frequency, with the proviso that program operations are 
not to be commenced until specifically authorized by the Commission 
after its evaluation and acceptance of such data. 


FEDERAL Communications Comission, 
i Ben F. Warre, Secretary. 


40 F.C.C.