Transportation System Plan 2018-2038
Medford · Page 185 of 398 · Adopted 2018-12-06
Need for Traffic Signal Upgrades
The need for traffic signal upgrades to replace outdated equipm ent or to
accom modate m ore com plex signalization needs has been identified at several
locations throughout the city . These locations are indicated in Table 8-2.
Traffic Signalization and Control Improvements
Table 8-2 presents im provem ents for the traffic control at key intersections
throughout the Medford UGB. Included are projects for signal installation at
currently unsignalized intersections, signal upgrades where appropriate, and
other appropriate im provem ents such as all-way stop control and/or
roundabout treatm ents. It should be noted that several of the projects in this table have already been
identified as im provem ent needs and included in the 2001-2023 Rogue Valley Regional Transportation
Plan and/or the City’s 17-project list. Others would be incorporated into larger projects, particularly
along Highway 62 at Coker Butte Road and Elliot Road (which would becom e Owen Drive). New
signalized intersections of these streets with Highway 62 are planned and street alignm ent changes will be
made to provide adequate vehicle storage distan ce between Highway 62 and Crater Lake Avenue.
Implem entation of m any of these im provem ents also could have positive im pacts for pedestrian
circulation in that the addition of a traffic signa l may improve pedestrian safety at intersections.
Table 8-2
Summary of Intersection Traffic Control Improvements
Project
No.
Location
Traffic Control Sourc e of
Improv ement
Medford Tier I Improvements
420 Main at Hamilton Signal upgrade RTP
421 Jackson at Sunrise Install new traffic signal and EBL
turn lane RTP/LOS Study
422 Columbus at Prune Install new traffic signal RTP
423 Columbus at Jackson Install new traffic signal
RTP
Install new traffic signal
Install new traffic signal
RTP
430
Signal upgrade
8
8 Signal upgrade
RTP
Hillcrest Road at Valley View Drive RTP/LOS Study
N Phoenix Rd at Cherry
477 Install new traffic signal RTP/LOS Study
424 4th at Columbus Install new traffic signal
425 Springbrook at Cedar Links Install new traffic signal RTP
426 4th at Oakdale Install new traffic signal RTP/LOS Study
427 Crater Lake at Roberts (w est) RTP
428 Spring at Springbrook RTP/LOS Study
429 Biddle at Law nsdale Install new traffic signal
Keene at McAndrew s Install new traffic signal RTP
431 Barnett at Golfview Install new traffic signal RTP/LOS Study
432 10th at Columbus Install new traffic signal RTP
433 8th at Hamilton Signal upgrade RTP
434 6th at Central RTP
435 th at Central Signal upgrade RTP
436 th at Orange RTP
438 Main at Oakdale Signal upgrade
439 12th at Riverside Signal upgrade RTP
450 Install new traffic signal. May also
need W BL turn lane.
452 Highland at Main Install new traffic signal
453 Install new traffic signal RTP (assumed in
LOS study )
454 Delta W aters Road at Springbrook Road Realign Springbrook n/o Delta
Waters, add signal and W BR lane RTP/LOS Study
Hillcrest Road at Pierce Road RTP/LOS Study
498 Hillcrest, Main St to Foothill Road Transportation Sy stem
Management Improvements RTP (Tier 2)
Medford Transportatio n System Pl an 8-3 Public Transportation Plan
Ask AI what this page says about a topic: