Attached is the cost breakdown, with estimates for the completion of the New Well

EFTA01124116 Dataset 9 5 pages Download original PDF Download as text
Jeffrey Attached is the cost breakdown, with estimates for the completion of the New Well (Well K) at Zorro Ranch for your consideration Also photos of the control panel and completed trenching/pipe for your reference. The operational design changed due to the existing Control Panel limitations to operate the On/Off function on the proposed 3-phase converter and Well Pump controller The new design is a simpler single-phase controller and pump; this also decreases start up cost Proposed Operational Plan • Use the existing control panel at Well 4 to operate Well K. This is done by simply disconnecting 2 control wires from Well 4 and running new control wires from Well K to Control Panel, 900ft. If in the future there is a need to have three Wells operating at one time, then an additional control panel could be added. • Rest Well 4 for 2013, use and test Well K. In doing so Zorro Ranch should meet conditions laid out in the Settlement Agreement for Permit E 7871, "January 15, 2014 Well K must have pumped 25% of permitted allotment (68 afa)" This will also allow Zorro Ranch to pay back some of the over diversion that has occurred over the years at the Well 4 location. • The next step is to develop a water usage plan to meet conditions of the Permit E 7871. Recommend this happens during the course of 2013 while pumping of Well K is occurring. This will give the Ranch confirmed production data to develop such a plan. Notes: Not included in the development cost is the plugging of the existing borehole by HGS. Original estimates ranged from $15k to $20k, this is still to be negotiated. Casey Cook is recommending developing borehole as a well, which would be an estimated cost of $25k. I will forward my recommendations by the end of next week. The relocating of the water rights from permitted sight to Well K should be completed by the end of the year, baring any protest filed. If the attached plan and estimates meets approval, Well K should be fully operational by the end of 2012. EFTA01124116 HydroGeologic Services, Inc. . Box 94716 -4716 Estimate Date Estimate # 10/24/2012 78 Project Pump System Description City UOM Cost Total Revised 10/24/2012 Pump System Installation 10 HP 230 V 3 P14.145 GPM Submersible Pump/Motor I LS 5,150.00 5.150.00 4 x 6 Pump Adapter I EA 414.00 414.00 r Galv. pipe w/coupling 546 LF 7.00 3,822.00 2" x l0" Stainless Steel Nipple 1 EA 40.00 40.00 #2 wire 550 LF 8.50 4.675.00 #2 splice kit I EA 35.00 35.00 Tape 3 roll 15.00 45.00 r Meter w/couplings 1 FA 1,235.00 1,235.00 Miscellaneous piping/fittings I EA 500.00 500.00 10 HP Franklin Electric Deluxe Control Box 1 PH 230V 1 EA 1,150.00 1,150.00 I" Sounding Tube 520 LF 1.00 520.00 Labor to install 1 LS 3,600.00 3.600.00 Fumisb/Install Pitless adapter 1 LS 4,650.00 4,650.00 Well Head Seal/Protector I EA 815.00 815.00 Santa Fe Remainder of County 6.625% 1.765.63 This Estimate is valid for 90 days. Total 528.416.63 EFTA01124117 RMC Electric-Randy Morales ■ Box 10645 Albuquerque NM 87184 Estimate/Bid October 25, 2012 Attn To: Zorro Ranch Job: Well K 1) 300ft of 2" PVC 2) 2-2 LB 20/ea 3) 1-2 pole, 100 amp breaker 4) 1-100 amp breaker in door panel 5) 3-300ft runs of 1/10 copper Thhn wire 6) 1-300ft run #2 copper Thhn groung wire 70 Miscellaneous fittings 8) 3x5 Nema 3R J-Box 9) 5000ft of #12 control wire 10) Well control Relay 11) 1500ft of 1 1/4 " intra duct Materials Labor Total $ 202.00 $ 40.00 $ 150.00 $ 200.00 $ 2,750.00 $ 360.00 $ 250.00 $ 880.00 $ 1,050.00 $ 450.00 $ 845.00 $ 7,177.00 $ 4,000.00 $ 11,177.00 EFTA01124118 EFTA01124119 EFTA01124120

📷 Images in this document (5 detected)

AI-generated factual descriptions of embedded images (llava:13b). These are searchable across the corpus.

[Image 1] The image shows a desert landscape with a long, straight road leading towards a horizon where mountains can be seen. The road appears to be a dirt road with tire tracks indicating recent vehicle activity. The sky is clear and blue, suggesting a sunny day. There are no visible texts, logos, or people in the image. The style of the image is a straightforward photograph capturing a natural scene. [Image 2] The image shows an electrical control panel with various components such as switches, relays, and terminal blocks. The panel is mounted on a metal frame and appears to be part of an industrial or commercial electrical system. There are no visible people or logos in the image. The panel is equipped with a variety of wiring and connectors, and there are labels and instructions attached to the panel [Image 3] The image shows a document with text, which appears to be a proposal or a report. The document is titled "Proposal for Operational Plan" and is addressed to Jeffrey. The text is in English and discusses the design of a single-control pump for the New Well project. It mentions the need for a 25% reduction in the pump's operating cost and the importance of the pump's location. The document also incl [Image 4] The image shows a document that appears to be an invoice or a financial statement. It contains a table with various line items, each with a description, quantity, unit price, and total amount. The document is structured with columns and rows, and there are numerical figures indicating the amounts for each line item. The header of the document includes the name of the company, which is partially ob [Image 5] The image shows a document that appears to be an invoice or a bill. It lists various items with their respective quantities, descriptions, and prices. The total amount due is also indicated at the bottom. The document includes a date, which is December 20, 2011, and a reference number. The visible text includes names, such as "RMC Electric," and numerical values, which are likely the prices for th