JE - LSJ and GSJ - W/E July 14, 2017
JE - LSJ and GSJ - W/E July 14, 2017
Task Name and Scope Assigned To Dural'
on Start Finish Status Comments
1 Cabana 2 New a/c unit install Michael 1d 07/21/17 07/21/17
2 Virgin Mary Je lOAdvise
3 MR paint trim tabs Carlos 1d 07/21/17 07/21/17 complete
4 Christmas cove shelf make level Peter 07/18/17
5 Jim Cross landscaping Report done by 7-24-
17 9d 07112/17 07/24/17
12 volt Fan order for pebble beach shipped Kimberly
6 and due to arrive in Palm Beach Between
August 9th and the 20th
7 Back fill hole next to fuel tank room Jules 1d 07121117 07/21/17 Comp to
8 Fix Air pump compressors outside pump
room in staff kitchen Michael 07/21/17
9 Fix dogged drain inside pump roomLSJ Danny / smile 07119/17 In Progress
10 Cover all electrical panels, and outlets. Danny V 5d 07/24/17 07/28/17
11 Fuel Tank room needs serviced -- Tank 2
FOS valve Failure and Replace polish filters. Danny V Awaiting Report & Bid. Anna to Mow up
with Nester on 7121
Ann Called Nester. awaiting Bid 8 report
12 Hang swing at pergola sylvester 33d 06/15/17 07/31/17
13 Relocate dryer vent at Gsj Danny E 1d 07/21/17 07/21/17 Complete
14 set up scaffolding and 4 flood lights on palm danny V 07/20/17 Jee to approve
15 Fix pavors on pops terrice Dupson
16 Fix tile on pops terrice Svester
17 Rebuild back step and A/C screens at
cottage house Lsj Sylvester 6d 07/31/17 08/07/17
18 Build roof and doom at the info center
electrical area Sylvester 4d 08/01/17 08/04/17
19 library fix buzzing lights inside. Danny V 06/28/17 Je needs to approve
20.Replace out door recessed lights library Danny V 1d 07/21/17 07/21/17 Complete
Run electrical wire to sconces on stone Danny V 1d 07/24/17 07/24/17 21 pillars Master dr. entrance of compound.
221 LSJ Under water lights need to be fixed Danny V 6d 07/11/17 07/18/17 PROJECT COMPLETED
23 Waterfall: Danny to fix waterfall Shut off
switch Danny V 1d 07/21/17 07/21/17 complete
24 Blue Beach: Extend steps down on Blue
Beach. Sylvester Sd 08/14/17 08/18/17
25 LSJ Repaint Sundial and all benches around
it. TJ 07/21/17 p smartsheet
Exported on July 21.2017 5:51:20 PM PDT Page 1 of 5
EFTA00804049
26
27
28
29
30
31
32
33
34
35
36
37
38
39
40
41 Task Name and Scope Assigned To Durati
on Start Finish Status Comments
LSJ Helipad: wall papering ordered on the 7-Kimberly Ross
11-17 & delivery estimate 7-24-17 Rug
ordered waiting for aMval. Furniture ordered-
Bench back ordered Estimated delivery to
Tropical Shipping August 31st.
LSJ Entrance basket: Dupson to create stone Dupson
wall around basket 5/31. Je to approve down
lighting
LSJ Staff cottage countertops: Caribe Craft George
Custom Milkvork will fabricate and install the
(56) ft of 3CM color Gray Speckle granite
countertops. Bid for $8400 approved 5119.
delivered during this week and installed 7-
22-17
LSJ Staff cottage punchlist: Cooktop install, Danny V
Kitchen sink and waste disposal, dishwasher
Lsj Staff cottage Sylvester to complete Syvester
Gutters
LSJ Staff cottage painting: TJ -needs to finish TJ & Oriole
out side area.
LSJ Staff Cottage furniture: JE approved the Kimberly
518,697 quote from Silk Greenery for Living.
Dining and MBR furniture. The 60% deposit
(514,764) made 716. Silk Greenery will
deliver the in-stock furniture 7-17 -17. The
balance of the furniture EDA by 8-?-17.
Cabana 2: rotten back door needs replaced Sylvester 05/31117 In 'Negress
05/19/17 counter tops will be (tethered and
installed 7.22.17
ld
1d
36d 07/24/17 07/24/17
07/21/17 07/21/17
06/02/17 07/21/17 Complete
37d 06/29/17 08/18/17
6d 08/07/17 08/14/17
LSJ Lane Venture furniture: Replace the
furniture outside of the Library, MBR. and
sofa in the Flagpole Pool. Order placed 6/16.
AMved to Tropical FL 7/19. Scheduled to sail
7/21. EDA on STT 7/25. Kimberly 32d 06/16/17 07/31/17 In Progress
Tiki Hut Roof: Replace the palm thatch. JE Sylvester
to advise start date for project.
Picnic tables for GSJ Sylvester 6d
2d 08107/17 08/14/17
07/19/17 07/20/17 PROJECT COMPLETED
GSJ Solar Shed: Budd double doors In Solar
shed. Sylvester 05/25/17
GSJ Solar Shed: Install insulation in Solar
shed. Installation spray in GSJ shed. Discuss
with Jee Danny V. 05/02/17
GSJ Solar Shed: Install lighting in Solar shed.
to be done after foam installation Danny V. 05/10/17
GSJ Solar Shed: Install A/C in Solar shed.
Reefco submitted bid of S12K to install (2) 3
ton Fujitsu NC units in Solar shed. under
review with Rich for payment. Reefco 06/14/17 Jee- Discuss why we need arc In shed?
Nanna boat cushion covers - JE requested Carlos 33d 06128/17
(2) new sets. Custom Canvas quote of
$5,770 approved. Deposit made 6/28. Fabric
in stock by 7/14. EDA to completion 8/11. 08/11/17 In Progress
Exported on July 21, 2017 5:5120 PM PDT Page 2 of 5
EFTA00804050
Task Name and Scope Assigned To
42 Tunnel Woodshop - Sylvester and a helper
need to completely empty out and
reorganize. Sylvester
43 Outdoor furniture Alibaba Kimberly Ross
44 GSJ Finish and clean Employees
bathrooms Danny V
45 GSJ Staff Cottage: Renovation Sylvester
L LSJ Flve Palms: Construct wall around 5
Palms. JE to advise
LSJ Five Palms: Create coping for Five
Palms in house. JE to advise on design Dupson
& Dalce
Dupson
& Dalce
a8Barge Painting and Capt. Bosco needs to
give update on barge maintenance. Ann Rodriquez
a9INFO center hide wire hanging down from
ceiling Danny E
50 Grey Jet Ski 2: Replace staler and Fuel
Pump. Parts arriving at the Palm Beach
house 7/13 Tap
51 Change 2 bike batteries Tap
52 ONGOING MAINTENANCE
53TSG Monthly service plan for R/0 plant LSJ Michael
54 Reefco monthly service for a/c units Michael
55 Ocean Pest Control Michael
56 LSJ Spraying for white flies on
bougainvilleas. Chris
57 GSJ Spraying for white flies on
bougainvilleas. Chris
58 Ocean Pest mosquito spraying. Main
compound, Tiki. Flag pole pool, info center &
Five Palms --.Sprayed with Suspend Michael
59 Polyone.
LSJ Irrigation - check for leaking. Cristobal
60 GSJ Solar Battery Monthly Maintenance
program. approved by RK 3/11, started with ProSolar
ProSolar.
61 BIDS AND PERMITS
62 GSJ Service Road project On hold. Awaiting
permit. PERMIT Dural"
on Start
69d 05/02/17
06/24/17 Finish
08/04/17
6d 07/17/17 07/24/17
35cl 06/27/17 08114/17 Status
In Prowess
JE TO ADVISE.
JE TO ADVISE.
07/06/17 After we receive Boscoe list of
items we will coordinate a date to
have everything done to the
Barge all at the same time.
(Maintenance, Repairs & Paint)
07/21/17 07/21/17 Complete
07121/17 07/24/17
2d 07121117 07/24/17
3d 07105117 07/07/17 Comments
need to tak WA1 Rich about the arks.
bi weekly
CONDUCTED EVERY FRIDAY
CONDUCTED EVERY FRIDAY
they swayed morning or 7-t647
PROJECT COMPLETED
CM HOLD AWAI11NG PERMIT
Exported on July 21, 2017 5:5120 PM PDT Page 3 of 5
EFTA00804051
63
65
66
67
68
69
70
71
72
73
74
75
76 Dural"
on Task Name and Scope Assigned To Start Finish
John Woods Is preparing the GSJ Minor
Permit application for A Remainder projects
(80-foot flagpole. 3 Quonset huts. swimming
pool. Residential cottage with gym and spa
buildings). JE approved to print the Revised
13-Page Plan Drawings for A Remainder
Permit 7/13. JE will walk in the Permit
Applications. John Woods 70d 07/05/17 10/10/17
John Woods is preparing the GSJ Minor
Permit application for C-1 Remainder
projects (80-foot flagpole, Residential
cottage. Tennis and adjacent storage
building). JE approved to print the 11-Page
Plan Drawings for C-1 Remainder Permit
7/12. JE will walk in the Permit Applications. John Woods 70d 07/05/17 10/10/17
GSJ Cistem request for the issuance of a
'Certificate of INC filed with CZM 4/25.
Awaiting Approval to schedule Paul Kalloo for
an inspection.
GSJ Dock awaiting revised drawings & letter
from ACOE. JE and Rich spoke with Amy
Dempsey regarding status. PERMIT
Amy Dempsey
PURCHASE UST
Michael & Rich Purchase new water maker for GSJ.
St. John Awning proposal forwarded to JE &
RK 12/18/16.
Cabrita Point Fiber cabinet solar backup: for
consideration once Pebble Beach project
completed. ProSolar will review and provide
bid when Brad back on island week of SM.
518 Brad recommends GOAL ZERO YETI
1250 PORTABLE POWER STATION KIT
$2,467.94 (including shipping and handling).
Brad estimate is $150 for the 1st hour S75
every additional hour. Waiting for approval to
proceed.
GSJ 2007 Lull needs a transmission. Lucas
forwarded all info on transmission to Anna &
Rich. Rich to advise. Sheridon asked that we
purchase a new Lull and use the damaged
lull for parts for the old lull.
JE approved to buy a new Lull 2 to 3 years
old.
Chillax Office Wall construction Estimate
from BWC forwarded to JE & Rich 4/20.
R/O Metal shed - Prelimary bid from BWC
forwarded to JE & Rich 4/20.
Research Wind screens for main pool.
GSJ Helipad Construction awaiting permit
BWC standing by to produce the bid to
construct The lights are onsite and in
storage. call brice
Jermaine Ruan 07/11/17
Richard
Michael, Tap. Rich 06126117
Michael Status
Cal HOLD AWAITING INSTRUCTION TO
PROCEED
spoke wkh Amy Dempsey wed. 7-S-17
She said cable rim permit between islands
0 months out and dock permits a months
out. All going threw review by Army caps.
Michael
Brice said not order
spoke with Jermaine 7.21.17 He is going
to order equipment today. once the
equipmeM is in Danny V. will mount on
Pole.
Will talk to Rich 7.21.17 to check cc progress
Jimmy Freguela SW vial
Jimmy Freguela SW vial Comments
Exported on July 21, 2017 5:5120 PM PDT Page 4 of 5
EFTA00804052
Task Name and Scope Assigned To
r r Researching new staff transporting boat. Carlos Dural"
on Start
15d 06105/17 Finish Status
06/23/17 poi on hal for now Comments
Exported on July 21, 2017 5:5120 PM PDT Page 5 of 5
EFTA00804053
📷 Images in this document (5 detected)
AI-generated factual descriptions of embedded images (llava:13b). These are searchable across the corpus.
[Image 1] The image appears to be a screenshot of a spreadsheet or a table with text content. The text is too small to read clearly, but it seems to be a list of items or tasks with columns that might include a number, a description, and possibly a status or priority level. The text is in English, and there are no visible logos, names, or other identifiable features that would allow for a more detailed desc
[Image 2] The image shows a table with rows and columns, likely from a spreadsheet or database. The table contains text in various cells, with some cells highlighted in red and blue. The text is too small to read clearly, but it appears to be a list of items or data points, possibly related to a project or inventory. The table is structured with headers at the top, and each row seems to represent a differen
[Image 3] The image shows a document with a table and text. The table appears to be a schedule or a list with columns and rows, possibly containing dates, times, and corresponding activities or events. The text at the top of the document includes the names "LSL and SJS WE JULY 14 2017," which could indicate the title or the date of the document. The logo "SMARTSHEET" is visible at the bottom right corner, s
[Image 4] The image shows a table with rows and columns, containing text. The table appears to be a list or a table of some sort, possibly from a spreadsheet or a database. The text is too small to read clearly, and the content of the table is not discernible from this image. The table has headers, and there are cells filled with text, but the specific details are not visible due to the resolution of the im
[Image 5] The image appears to be a screenshot of a computer interface, possibly a database or spreadsheet. There are several columns with headings such as "ID," "Name," "Date," "Time," "Type," and "Status." The content of the cells is not visible due to the image's resolution and angle. The interface is structured with rows and columns, typical of a database or spreadsheet layout.