APPLICATION FORMS AND ENVIRONMENTAL ASSESSMENT
APPLICATION FORMS AND ENVIRONMENTAL ASSESSMENT
FOR THE CONSTRUCTION OF TWO DOCKS AND A BARGE LANDING
ON GREAT ST. JAMES ISLAND
U.S. VIRGIN ISLANDS
PREPARED FOR
GREAT ST. JIM, LLC.
PREPARED BY
BIOIMPACT, INC.
M. BOX 132
KINGSHILL, ST. CROIX
U.S. VIRGIN ISLANDS 00851
[email protected]
JANUARY 2017
EFTA00802602
Dawn L. Henry Commissioner
Department of Planning and Natural Resources
Cyril E. King Airport Terminal, Second Floor
St. Thomas, Virgin Islands 00802
Re: Major Water Permit Application for the Construction of a Temporary Barge
Landing, an Access Dock, and a Combination Dock and Barge Landing
Dear Commissioner Henry,
Great St. Jim, LLC wishes to make application to the Virgin Islands Government and the Secretary
to the Army for a Coastal Zone Permit to construct two docks, one of which is a combination dock
and barge landing and a temporary barge landing to provide access to Great St. James Island.
A temporary barge landing is being proposed on the northwestern facing beach. This site is to the
west of the sand pond and the associated wetlands. This a shoreline ramp which is 25'wide and 40'
in length extends to the Mean Water Line (MWL). Two bollards will be placed to either side of the
ramp and two moorings will be installed 75' offshore on either side of the ramp in just over 7' of
water depth. The moorings will be installed using helix anchors and will use floating lines as to not
disturb the seafloor when not in use. The landing is free of both coral and seagrass colonization,
this landing can be quickly constructed and utilized while the combination dock and barge landing
on the southeastern side of the island is constructed.
The western dock is proposed on the northern end of Christmas Cove. Historically there was a
dock in this location and there are still old concrete piles lying in the shallow water. The proposed
dock will be 10' in width and 195' in length extending 187' from MLW and 193' from mean high
water (MHW). The dock will connect to an access slab 12' in length and 2' thick. All the ESA listed
coral species within the area were located and the dock footprint avoids all ESA listed species. The
dock extends beyond the nearshore hardbottom to a depth of 15' out in the uncolonized sand to
allow for safe dockage for deeper vessels.
The southern dock is located off the point closest to Little St. James. Again, all the ESA corals were
located and the dock was designed to avoid these corals. The dock is "L." shaped and is 20' wide (to
allow for barge landing) and 150' in length extending 141' from MLW and 148' from MHW. The
"L" then turns east and extends 100' by 20'. A wave attenuating/reef creating system is proposed
beneath the dock which will allow for more protected docking inside the dock when seas from the
south are rough. The dock has 9' of water depth off the southern end and 7' to 8' on the inside of
the "L". The dock has been designed so that barges can approach and land on the end of the dock
while vessels can dock along the "L.".
The existing dock in Shallow Bay which is not permitted by the USACE in its current configuration
will be removed upon completion of a usable new dock.
It is understood that your approval of the renewal must be first obtained by virtue of the
authority vested in you by Act No. 4248 of the Virgin Islands Code. Your favorable endorsement
is, therefore, respectfully requested.
EFTA00802603
We also respectfully request that this application be forwarded to the U.S. Army Corps of Engineers
Antilles District, Annex Building, Fundacion Angel Ramos, 2nd Floor, Suite 202, Franklin Delano
Roosevelt Ave. #383, San Juan, PR 00918 for their review and approval.
Early advice concerning your decision in this matter will be appreciated.
Very truly yours,
Erika Kellerhals
EFTA00802604
GOVERMENT OF THE VIRGIN ISLANDS OF THE UNITED STATES
DEPARTMENT OF PLANNING AND NATURAL RESOURCES
DEVELOPMENT PERMIT APPLICATION
FORM L&WD-2
PERMIT APPLICATION
Date Received:
Date Declared Complete: Permit Application No.
Application is hereby made for an ElEarth Change ElCoastal Zone Permit
I. Name, mailing address, email address and telephone number of Applicant (person/entity with legal
interest in the property, to which permit will be issued)
awn Ea Jim LW
9053 Estate St. Thomas, Sues 101
st. Thomas, VI 00802
340 779.2584
2. Name, title, mailing address and telephone number of Owner of property and Agent (if any)
Owner of Property(s) AMR
Great St Jim, LLC Erika A. Kellerhals
9053 Estate SL Thomas. Suite 101 IIIII••••••••••0410la Kit Sas tea et IIINalptide
St Thomas, VI 00002 St Thomas. VI 00802 340 779 2584
3. Location of activity. Plot No. ""*"."—""""a""as"'" PIN No. icreeognoice a 109801010300
EstateGreat St. James Island St Thomas
4. Zoning District I3/400"31 tow Craft
4.a State type of Land Uses as specified in the VI Zoning Law, which are applied for (e.g., restaurant,
hotel, single-family dwelling, etc.)
Private Doc* and Barge Ramp
5. Name, mailing address, email and telephone number of project designer.
Jeffrey Bateman, PE. PLS. Bateman CM Spivey Company, PC, MSC Dosplva, LLC
5001.12 cndndsrs Wharf
Christiansed. StCrobc. VI 00820
340 778-7474
6. Summary of proposed activity. Include all incidental improvements such as utilities, roads, etc. (Use
additional sheets if necessary).
A temporary barge landing is being proposed on the northwestern facing beach. This site Is to the west of the sand pond and
the associated wetlands. This shoreline ramp which Is 2SWlde and 40' in iength extends to the Mean Water Line (MWL).
Two bollards will be placed to either side of the ramp and two TOOlkl9S Will be installed 75 offshore on either side of the ramp
Continued:
EFTA00802605
FORM L&WD-2/PERMIT
APPLICATION
7. Date activity is proposed to start go 'MA'S Pella" in ; be completed 5 moms
8. Classification of minor or major permit. Check one:
ElMinor Permit Application
El Major Permit Application
State below which criterion applies in making above check.
Size of Project! Dock Sizes
9. Application is hereby made for a permit to authorize the activities described herein. I agree to provide
any additional information/data that may be necessary to provide reasonable assurance or evidence
to show that the proposed project will comply with the applicable territorial water quality standards
or other environmental protection standards both during construction and after the project is completed.
I also agree provide entry to the project site for inspectors from the environmental protection agencies
for the purpose of making inspection regarding this application and that to the best of my knowledge
and belief, that such information provided herein, is true, complete and accurate. I further certify that I
possess the authority to undertake the proposed activities.
Signature of Applicant or Agent (if not owner) Date
Sign Print
Sign Owner(s) (Rquiredr --- Date
) Criltk I fin J1) 4-4 nolgo-to f I to k tr./ Print S St I,- tuatuaorfr- Coma` St. Try., u-t.
Sign Print
Date Inspected: FOR DEPARTMENT USE ONLY
Inspector Record
0 Application Approved
0 Application Disapproved
Inspector's Remarks:
Inspector Date
Commissioner, Planning & Natural Resources Date
EFTA00802606
7. Cont.
in just over 7' of water depth. The mooring will be installed using helix anchors and will use
floating lines as to not disturb the seafloor when not in use. The landing is free of both coral and
seagrass colonization, this landing can be quickly constructed and utilized while the combination
dock and barge landing on the southeastern side of the island is constructed.
The western dock is proposed on the northern end of Christmas Cove. Historically there was a
dock in this location and there are still old concrete piles lying in the shallow water. The
proposed dock will be 10' in width and 195' in length extending 187' from MLW and 193' from
mean high water (MHW). The dock will connect to an access slab 12' in length and 2' thick.
All the ESA listed coral species within the area were located and the dock footprint avoids all
ESA listed species. The dock extends beyond the nearshore hardbottom to a depth of 15' out in
the uncolonized sand to allow for safe dockage for deeper vessels.
The southern dock is located off the point closest to Little St. James. Again, all the ESA corals
were located and the dock was designed to avoid these corals. The dock is "L" shaped and is 20'
wide (to allow for barge landing) and 150' in length extending 141' from MLW and 148' from
MHW, the "L" then turns east and extends 100' by 20'. A wave attenuating/reef creating system
is proposed beneath the dock which will allow for more protected docking inside the dock when
seas from the south are rough. The dock has 9' of water depth off the southern end and 7' to 8'
on the inside of the "L". The dock has been designed so that barges can approach and land on
the end of the dock while vessels can dock along the "L".
The existing dock in Shallow Bay which is not permitted by the USACE in its current
configuration will be removed upon completion of a usable new dock.
EFTA00802607
GOVERNMENT OF THE VIRGIN ISLANDS OF THE UNITED STATES
DEPARTMENT OF PLANNING AND NATURAL RESOURCES
DEVELOPMENT PERMIT APPLICATION
FORM L&WD-3
ZONING REQUIREMENTS TABLE
The following table shall be completed by the applicant with entries as appropriate for the zoning district in which the
activity is taking place. Not all the requirements will necessarily apply to a particular zone. Consult the Zoning Law for
guidance.
Applicants Name: Great St. Jim, ILLC (Wera talc lht
Date: %k1O
Location of Activity (Plot No.): Estate: Greg Si. James
2.
3.
4.
S. Proposed use (residential etc.) Residential Access Docks/Barge Ramp
Accessory use if any Residential Access Docks/Buge Run
Number of onsitc parking spaces: Existing ala Proposed ••
Arca of lot: a acres
covered by proposed buildings fts Area covered by existing buildings dot ft2' Area
6. Total area of disturbance (includes footprint of all buildings, structures and parking areas) Upland 1550 fts
7. Setback of building from street property line: Required dot ft. Proposed none ft.
8. Side yard setback: Required Na ft. Proposed ft.
9. Rear yard setback: Required dot ft. Proposed ft.
10. Height of building: RA ft. Stories dot
II. Lot width at street line (ft.) dot
12. Area of usable open space: Ws ft. % of lot
13. Persons per acre ratio ^la
14. Floor area ratio nit
IS. Number of onsite parking and loading spaces .1
16. Building setback (yards II, W-2 only) 46 Zoning District: R-I
FOR DEPARTMENT USE ONLY
Inspector: Date: Permit Application No.
EFTA00802608
GOVERNMENT OF THE VIRGIN ISLANDS OF THE UNITED STATES
DEPARTMENT OF PLANNING AND NATURAL RESOURCES
DEVELOPMENT PERMIT APPLICATION
FORM L&WD-4
MAJOR PROJECT SUMMARY DATA
Section I. Applicant
1. Name, address and telephone number of applicant.
Gnat St an. RC
9053 Estate St. Thomas, Suite 101
St. Thomas, VI 00802, 340 779-2564
2. Name, address and telephone number of owner of Property and of developer.
Same
Section IL Summary of Proposed Development
3. Describe the proposed development
A WIN( arY bred landing a bOirg pOpaW en ma nodlweadoin ikon* bath Inas sae is to me wed of Ma sand pond aid Ilw assOcistod wetland
This Morenoe ramp which is 25W de and 40' In length extends to the Mean Water Line (PAWL) Two bollards
will be placed to either side of the ramp and two moorings will be irtstalled 75' offshore on either side of the ramp
in just over 7' of water depth. The mooring will be installed using helix anchors and will use floating (coot.)
Section III. Description of Proposed Development
4. Name of development Great St. James Access Dock Temporary Barge Ramp and Dock/Barge Ramp
5. Plot No.
6. Zoning District: R-1 Residential
7. PWD Map No. D9-2925-184 and D9-7346-T004
8. Proposed use (residential, etc. as listed in Zoning Law): Private Dock/Barge Ramp
for Residential Property
9. Accessory use if any Access Dock, Temporary Barge Ramp and Dock/Barge Ramp
EFTA00802609
FORM L&WD-4
MAJOR PROJECT SUMMARY DATA
la Area of Law (acreage) 80.7 Elan and 26.9 acres
I I. Area covered by existing buildings (sq. It) n/a
12. Area covered by proposed buildings (sq. ft.) Na
13. Floor area total n/a
14. Floor area ratio (B-I, B-2 zones only) n/a
IS. Number of buildings n/a
16. Number of units total nth
Person
17. Schedule of units: EfficienciesIlia x 1.5 Unit
1 bedroom Ilia x 2
2 bedroom Na x 3
3 bedroom n/a x 4
Other
Total Persons Persons
I8. Number of on-site parking and loading spaces n/a
19. Maximum building height (stories/ft) ^la
20. Adjoining property land use(s) Private Island no Adjoining Properties
21. Setback of building from street property line (ft.) Na
22. Side yard setback (ft.) n/a
23. Rear yard setback (ft.) n/a
24. Density (perso&acre) n/a
25. Area of usable open space (sq. ft. %of lot) nia
EFTA00802610
FORM L&WD-4
MAJOR PROJECT SUMMARY DATA
Section IV. Comments
26. Proposed Potable Water Supply (method & quality estimate gal/day)
No Potable Water Proposed
27. Proposed Sewage Treatment (method & quality estimate gal/day)
No sewage treatment proposed
28. Proposed Solid Waste Disposal (method & quality estimate lbs/day)
No solid waste should be created. Any trash brought off vessels will be disposed of in existing trash receptacles on Island
29. Proposed Electrical Supply (method & demand estimate KWH for single & 3 phase)
Solar fights will be utilized on the docks
30. Air Conditioning (method & demand estimate down
No air conditioning is proposed.
31. Other Utilities
32. Other
Section V.
33. Will the development extend onto or adjoin any beach tidelands, submerged lands or public trust lands?
1 no apple:Won is be 2 docks arel a Unwary baps_ —p MI in an beech 112 e vibe Irto subrined l.S
34. Will the development maintain, enhance or conflict with public access to the shoreline and along the coast?
The docks will not conflict with public access to or along the shoreline
35. Will the development protect or provide moderate income housing opportunities?
Will it displace moderate income housing?
Ins prOjeC la NW no India Ca m00110)IrCOme rowing Cipaltran.
36. How will the development affect traffic on the coastal access roads?
The won is on a prate island and ye not ad maul mass me
Date
EFTA00802611
3. Cont.
lines as to not disturb the seafloor when not in use. The landing is free of both coral and seagrass
colonization, this landing can be quickly constructed and utilized while the combination dock and
barge landing on the southeastern side of the island is constructed.
The western dock is proposed on the northern end of Christmas Cove. Historically there was a
dock in this location and there are still old concrete piles lying in the shallow water. The
proposed dock will be 10' in width and 195' in length extending 187' from MLW and 193' from
mean high water (MHW). The dock will connect to an access slab 12' in length and 2' thick.
All the ESA listed coral species within the area were located and the dock footprint avoids all
ESA listed species. The dock extends beyond the nearshore hardbottom to a depth of 15' out in
the uncolonized sand to allow for safe dockage for deeper vessels.
The southern dock is located off the point closest to Little St. James. Again, all the ESA corals
were located and the dock was designed to avoid these corals. The dock is "L" shaped and is 20'
wide (to allow for barge landing) and 150' in length extending 141' from MLW and 148' from
MHW, the "L" then turns east and extends 100' by 20'. A wave attenuating/reef creating system
is proposed beneath the dock which will allow for more protected docking inside the dock when
seas from the south are rough. The dock has 9' of water depth off the southern end and 7' to 8'
on the inside of the "L". The dock has been designed so that barges can approach and land on
the end of the dock while vessels can dock along the "L".
The existing dock in Shallow Bay which is not permitted by the USACE in its current
configuration will be removed upon completion of a usable new dock.
EFTA00802612
GOVERNMENT OF THE VIRGIN ISLANDS OF THE UNITED STATES DEPARTMENT OF
PLANNING AND NATURAL RESOURCES DEVELOPMENT PERMIT APPLICATION
FORM L&WD-5
PROOF OF LEGAL INTEREST
AFFIDAVIT
I 3":"C vel e tere..tut being duly sworn depose and say that: rrrprl kat)* (or lofts Doe or tiny ApphroM)
eVV)1co-k' &• now.
) U.X.—
I. aariis the (check one) (I or rarity/Applies)
12<ord title owner (fee simple) OLessee 0Other (specify)
Of the real property described as Parcel No(s)Great St. James Island and CI & C2
Estate Gent a .lamp bird Quarter we Hooka No SA Rod Hoot Island ST. Times
"Applicant(s) is required to provide documentation for legal Interest stated above (e.g. deed, lease,
etc.)
2. I have the irrevocable approvals, permission, or power of attomey from all other persons with a legal interest
in the property to undertake the work proposed in the permit application as more fully set forth in the exhibit
rex,:
lc lit
ignature Date Signature Date
reist./(0,0104.1) tipasto44 OP R y(er, Tisci
44....5ol 4,4% °ea& :Thula!
Print Print
The foregoing instrument was acknowledged before me this tO day of -Tao/ atel
20 11 by (Na. or Name/Tide of &airy) at f,tsa9evK county
°Rust:art ✓
Chrabd9) (PAW n'h het ig,O,90IR Notary Public My Commission expires
NAM AVOW
NOTARY PUBLIC•STATE OP NEW YORK
No. 01.W6313116
Qualified in Richmond County
My Commission Expires October 14, 2018
EFTA00802613
GOVERNMENT OF THE VIRGIN ISLANDS OF THE UNITED
STATES DEPARTMENT OF PLANNING AND NATURAL
RESOURCES DEVELOPMENT PERMIT APPLICATION
FORM L&WD•7
CORPORATION/ASSOCIATION APPLICATION
(To be used when a corporation or association is making a Permit Application in Tier I)
Great St. Jim, LLC
(Corporation or Association Name)
Poo Sae. Via. uec-t
President or Va uivalent
tWyngf tee-6(.1_, rersriaried 2NeLv, Lc..1
Sole_ Vicusiawar aPc-ranc-e4-. u_c_.Print 1
WI ES :
1- ie eel. A) -t> weiro.‘ Z..0..eit i &stain, RR gets tnc.1
Secretary Name slit Wcualtr 4 'ink S-4•37.6vaC
ATTEST -s-ea_
Secretary Signature Q_Seal
The foregoing instrument was acknowledged before me this t 0 day of rad a V-.1
2011_ by Civ-eat- fsk • 'nu L—Lt_ at 'Att.) `fosek
(Num a Nansorille of Wiry)
oft.,. 5LL £ t.\.-. s)..ift‘
0/041)(192 (Mkt/ CratkeY .90tE Notary Public My Commission expires county
HABIBE AVDIU
NOTARY PUBLIC-STATE OF NEW YORK
rieF104044444n000cuinents:
Quailed In Rictimdiugtatintylener from the Bureau of Internal Revenue
My Commission bras OlnityltilsIteallance letter from the Lieuteaant Governor's Office.
3 Corporations and Associations: Certificate of Good Standing or equivalent. organizational documents &
Amendments (Articles, Bylaws, Operating Agreement, Declarations)
EFTA00802614
(Form L&WD-8) 1:08:96
Flood Plain Determination and Permit Application
To be completed by all applicants
1. Owner. Great St Jim. LLC
Mailing Address: 9053 Estate St. Thomas, Suite 101,St. Thomas, VI 00802
Home Tel. N: Business Tel.340 779.2564 H: Cellular if:
2. Designer: Jeffrey Bateman
Lie. 1052•E Tel. 340 778 7474
3. Plot th C1&C2
Flood Zonc Designation: YE EL e Cellularil: 340 513 4684
Estate: Great St. James Island Quarters wee & wand Wet
If your flood zone designation is Zone A, AE, AO, Al.30, A99, V, VO, Ve or VI-V30 as shown on the NFIP FIRM
Map. then complete this section.
NFIP Flood Zone Designatio
I. Type of development:
I or 2 Family dwelling Mobile Home Non-Structural ❑
3 Family or more, Apartment or Condo Structure ❑ Non- Residential Structure:M
Commercial Structurep New Construction Non-Structural D
Addition to Structure E] 50% Substantial Improvement of Existing Structure ❑
Description of Activity cosuomoncianA 0anOxt a TeWerf an. Lard.gGroan Mon 0cckleroP Wong
2. Base Flood Elevation at the Development Site is n1a ft. above mean sea level (msl).
3. Elevation of the First Floor, Basement or Flood proof level for proposed structure is WEI
4. Describe the Non Structural Activity i.e. septic tank, waste water treatment plants etc. (including the location
and development: Ns
5. Attach a certified copy of site plan (8.5" x I I) showing Base Flood Elevation. See sample attached.
KR OFFICE USE ONLY
Is the property located in an identified Flood Hazard Area? ( ) YES ( ) NO
NFIP Zone Designation: Forward to Flood Plain Manager: ( ) YES ( ) NO
Application: APPROVED ( ) DENIED ( ) RESUBMIT ( )
Plan Reviewer Name:
Signature: Date:
EFTA00802615
GOVERNMENT OF
THE VIRGIN ISLANDS OF THE UNITED STATES
VIRGIN ISLANDS BUREAU OF INTERNAL REVENUE
(DPNR FORM L&WD-6)
APPLICATION FOR TAX FILING AND PAYMENT STATUS REPORT"
Date: (JO
The applicant identified below hereby requests a letter certifying his or her tax filing and payment status for
the purpose of receiving a Coastal Zone Management Permit from the Virgin Islands Department of Planning
and Natural Resources pursuant to Act 5270, amending Sections 910 (aX2) and 911 (d)(2) of the Coastal Zone
Management Act (Title 12, Chapter 21, Virgin Islands Code). The applicant authorizes the Bureau of
Internal Revenue to disclose any taxpayer information necessary to process this application to the Virgin
Islands Department of Planning and Natural Resources, who may make such further disclosures as are
necessary to carry out the requirements of the Coastal Zone Management Act, as amended.
Name:Great St. Jim, LLC
Business Name: Great St. Jim, LLC
EIN/11N: (e " t Wel
SSN:
Please Indicate:
BCorporation
Partnership
0 Individual 5
Qtther 1-441W11-Iato t• VILauts".3
Date Busine
Person R
Signature:
Mailing Address:
Date: t Lo I 17 Type of Business:
Please check forms that you use:
01120, 1065, 01 040,1:1941W.
E1722V1,0noi3, 0720VI,
Dother (list)
en,langt- aeloc4
Position: itsiSele (Maw-6•a v-- c° Carte.
Telephone Number: 34O —77Q asL4
Reply to: 6115 Estate Smith Bay, suite 225. St. Thomas VI 00802 - 340-715-I040(phone), 340-774-2672(fax)
or 4008 Estate Diamond, St. Croix VI 00820 - 340-773-1040(phone), 340-773-I006(fax)
° Partnership and/or Corporations must list partners corporate officers, social security numbers and addresses
on a separate sheet and attach it to this application.
THIS FORM IS TO BE SUBMITTED TO VIBIR UPON COMPLETION
EFTA00802616
GOVERNMENT OF THE U.S. VIRGIN ISLANDS
BUREAU OF INTERNAL REVENUE
6115 EST. SMITH BAY-
ST. THOMAS, VI 00802
Tel: (340) 714-9320
Fax: (340) 714-9341
GREAT ST. JIM, LLC
9053 ESTATE THOMAS
SUITE 101
ST THOMAS, VI 00802-0000
Dear Taxpayer: 7/13/2016 4008 ESTATE DIAMOND - PLOT 7-B
CHRISTIANSTED, VI 00820
Tel: (340) 773-1040
Fax: (340) 773-1006
Business EIN: 660848875
RE: CZM ONLY
Please Submit This Letter To Your CZM Authority
This is in response to your application of 6/21/2016 in which you requested
a letter of clearance for a Costal Zone Management Permit pursuant to Title 12,
V. I. Code, Section 910 (a) (c).
Based on the information in our files, we find that you are current in the
filing and payment of your tax obligation. This Certification is for Costal
Zone Permit purposes only and does not absolve you of any subsequent revelation
of tax obligation past or future.
Sincerely,
Delinquent Accounts & Returns
EFTA00802617
‘4144Es v64<est
GOVERNMEM Of
044 UNITED SIAM V39GIN MAWS
OFFICE OF THE LIEUTENANT GOVERNOR
DIVISION OF REAL PROPERTY TAX H0S King 51,4944 • Chtlionsted, Vegan blonds 00820 • 340 773.6449 • Fox 340.773.0330
IS Noncom God. • Cholollo Amok,. Vier Islondi 00602 • 343 7747991 • lox 340.7746953
REAL PROPERTY TAX CLEARANCE LETTER
TO: Recorder Of Deeds
FROM: Office of the Tax Collector
In accordance with Title 28, Section 121, as amended, this shall certify that
there are no outstanding Real Property Tax obligations for the following:
PARCEL NUMBER 1-09801-0101-00
LEGAL DESCRIPTION GREAT ST JAMES ISLAND
RED HOOK QTR.
OWNER'S NAME KJAER, CHRISTIAN
Taxes have been researched up to and including 2016
CERTIFIED TRUE AND CORRECT BY
LUDENCE ROMNEY
TAX COLLECTOR
,C1L
7-nATURE
11/04/2016
DATE
EFTA00802618
GOVERNMENT OF
THE UNITED STATES VIRGIN GLANDS
OFFICE OF THE LIEUTENANT GOVERNOR
DIVISION OF REAL PROPERTY TAX HOS King Shoot • Chathambd. Vsspin blonds 00620 • 310 773.640 • Fax 310 773 0130
16 Kciertns God* • Ghorlotl• Amon. Vier tslorAh 00502 • 340 2112991 • Fox 310.7746953
REAL PROPERTY TAX CLEARANCE LETTER
TO: Recorder Of Deeds
FROM: Office of the Tax Collector
In accordance with Title 28, Section 121, as amended, this shall certify that
there are no outstanding Real Property Tax obligations for the following:
PARCEL NUMBER 1-09801-0102-00
LEGAL DESCRIPTION B-18B-2 GREAT ST JAMES ISLAND
RED HOOK QTR.
OWNER'S NAME GSJ PROPERTIES CORP
Taxes have been researched up to and including 2016
CERTIFIED TRUE AND CORRECT BY
LUDENCE ROMNEY
TAX COLLECTOR
nte 4 -,) SIGNATURE
11/03/2016
DATE
EFTA00802619
GOVERNMENT Of
WE UNITED STATES VIRGIN ISLANDS
OFFICE OF THE LIEUTENANT GOVERNOR
DIVISION OF REAL PROPERTY TAX 1106 King Street • Christiansted. Warn blond 00620 • 340173.6449 • fax 340.773.0U)
16 Keeton. God. • Charlotte MS Virgin blonds 00602 • 34.7742991 • fax 340.774.6953
REAL PROPERTY TAX CLEARANCE LETTER
TO: Recorder Of Deeds
FROM: Office of the Tax Collector
In accordance with Title 28, Section 121, as amended, this shall certify that
there are no outstanding Real Property Tax obligations for the following:
PARCEL NUMBER 1-09801-0103-00
LEGAL DESCRIPTION C-1&C-2 GREAT ST JAMES ISLAND
No.6A RED HOOK QTR.
OWNER'S NAME FURST, JOHN K. , KIM & NINA
Taxes have been researched up to and Including 2016
CERTIFIED TRUE AND CORRECT BY
LUDENCE ROMNEY
TAX COLLECTOR
SIGNATURE
11/04/2016
DATE
EFTA00802620
ENVIRONMENTAL ASSESSMENT
FOR THE CONSTRUCTION OF TWO DOCKS AND A BARGE
LANDING
ON GREAT ST. JAMES ISLAND
U.S. VIRGIN ISLANDS
PREPARED FOR
GREAT ST. JIM, LLC.
PREPARED BY
BIOIMPACT, INC.
M. BOX 132
KINGSHILL, ST. CROIX
U.S. VIRGIN ISLANDS 00851
[email protected]
JANUARY 2017
EFTA00802621
TABLE OF CONTENTS
SECTION
1.00 NAME AND ADDRESS OF APPLICANT PAGE
1
2.00 LOCATION OF PROJECT 1
2.00.1 Location and Agency Review Map 1
2.00.2 Vicinity Map 2
3.00 ABSTRACT 2
4.00 STATEMENT OF OBJECTIVES SOUGHT BY THE
PROPOSED PROJECT 3
5.00 DESCRIPTION OF PROJECT 4
5.01 Summary of Proposed Activity 5
5.0Ia Purpose of Project 5
5.01b Presence and Location of Any Critical Areas and Possible Trouble Spots 5
5.OIc Method of Construction 8
5.OId Provisions to Limit Site Disturbance 9
5.01e Sediment Control Methods to be Implemented 9
5.01 f Schedule for Construction Activities and Implementation
of Sediment Control Measures 9
5.OIg Maintenance of Sediment and Siltation Control Measures 9
5.02 Exhibits and Drawings 10
5.03 Project Work Plan/Schedule 14
6.00 ECOLOGICAL SETTING AND PROBABLE PROJECT IMPACT
ON THE NATURAL ENVIRONMENT 15
6.01 Climate and Weather 15
6.02 Landform, Geology, Soils and Historic Land Use 19
6.03 Drainage, Flooding and Erosion Control 24
6.04 Fresh Water Resource 29
6.05 Oceanography 29
6.06 Marine Resources and Habitat Assessment 37
6.07 Terrestrial Resources 47
6.08 Wetlands 49
6.09 Rare and Endangered Species 54
6.10 Air Quality 55
EFTA00802622
SECTION PAGE
7.00 IMPACT OF THE PROPOSE PROJECT ON THE HUMAN
ENVIRONMENT 56
7.01 Land and Water Use Plans 56
7.02 Visual Impacts 56
7.03 Impacts of Public Services and Utilities 56
7.04 Social Impacts 57
7.05 Economic Impacts 57
7.06 Impacts on Historical and Archaeological Resources 57
7.07 Recreational Use 57
7.08 Waste Disposal 57
7.09 Accidental Spills 58
7.10 Potential Adverse Effects, Which Cannot be Avoided 58
8.00 MITIGATION PLANS 58
9.00 ALTERNATIVES TO PROPOSED ACTION 58
10.00 RELATIONSHIP BETWEEN SHORT AND LONG TERM
USES OF MAN'S ENVIRONMENT 59
11.00 REFERENCES 60
Appendix A
Qualification Statements of Preparers
Bioimpact, Inc.
BCSC Dispova
Appendix B
Coral Relocation and Mitigation Plan
Appendix C
Water Quality Monitoring
Appendix D
Tree Boa Protection Plan
ii
EFTA00802623
1.0 NAME AND ADDRESS OF APPLICANT
Great St. Jim, LLC
9053 Estate St. Thomas, Suite 101
St. Thomas, VI 00802
2.0 LOCATION OF PROJECT
Great St. James Island is located to the southeast of the island of St. Thomas. The
geographic coordinates of the island are 18° 18.583' N and 64° 49.752' W. The
Temporary Barge Landing is located at 18° 18.902' N and 64° 49.802'W, the western
Christmas Cove Dock is located at 18° 18.804' N and 64° 49.876' W, and the southern
barge landing/dock is located at 18° 18.355' North L and 64° 49.659' W. The Location
and Agency Review Ma. and Vicinity Map follow.
Mealier
a. Psis.
Calf
Rock C•1141til POInt
Greet Bay
St JINNI Bay e‘. Cu 'Tent
Fletz ocy-
(
Ri
1 Sam St Maui
Mind
4.1FM
Cac
TM Summits S
witWK
Roof -0 c. 1.
Figure 2.01 Agency Review Map, the entire island of Great St. James is within CZM first
tier jurisdiction. The dock locations on the island are indicated.
1
EFTA00802624
•
At Rol Hook
fib ke4,00,
Pt
Redhook NOY
-^.
nt..,t.
!qt.-4.14, tt.
Gnat guy a •
til
c Nomaw.,. NAY
i‘on Ca,
ea Steven C.y
C-.
'I.
C
Little
Si Jan' I ...•
..,4 ••• • — . . Dog
w a -
a —*V • lb 7- Island
\ /
.\--- j
ruNFigure 2.02 Vicinity Map showing Great St. James Island in relationship to the
surrounding area. OP
3.00 ABSTRACT
Great St. Jim, LLC is seeking to construct two docks, one of which is a combination
dock/ barge landing, and a temporary barge landing to provide access to Great St. James
Island.
There is currently a small pile-supported dock located within Shallow Bay on the north
side of the island. The bay is very shallow and vessels accessing the dock have damaged
the shallow seagrass beds within the bay. At one time, there had been a concrete
bulkhead at the shoreline with a small floating dock. The previous owner submitted an
application for the existing dock which was approved by DPNR's Division of Coastal
2
EFTA00802625
Zone Management, but was not approved by the U.S. Army Corps of Engineers due to
objections by National Marine Fisheries because of the shallowness of the bay. The dock
was constructed by the previous owner despite not receiving the federal permit and
notices were issued by the USACE requesting the removal of the unpermitted structure.
The dock however was never removed. The applicant, understands the issues with the
existing dock and is proposing to remove the dock as soon as another dock is constructed
and usable.
A detailed study was done around the entire island to determine suitable locations for
dock location. All ESA listed corals were located and docks and barge landings were
designed to avoid these corals.
A temporary barge landing is being proposed on the northwestern facing beach. This site
is to the west of the salt pond and the associated wetlands. This a shoreline ramp which is
25 feet (ft) wide and 40ft in length extends to the Mean Water Line. The landing is free
of both coral and seagrass colonization. The landing is excellent for short term transfer of
material or equipment. The site is well protected from normal wave action but is
periodically impacted by wave action from ferries which travel through current cut
between Great St. James and St. Thomas. The wakes from these vessels make it an
unattractive site for mooring a barge for any length of time at the site. This landing can be
quickly constructed and utilized while the combination dock and barge landing on the
southeastern side of the island is constructed.
The western dock is proposed on the northern end of Christmas Cove. Historically there
was a dock in this location and there are still old concrete piles lying in the shallows of
this site. The proposed dock will be 10ft in width and 195ft in length extending 187ft
from mean low water (MLW) and I 93ft from mean high water (MHW). The dock
extends beyond the nearshore hardbottom to a depth of 15ft out in the uncolonized sand
to allow for safe dockage for deeper vessels.
The southern dock is located off the point closest to Little St. James. The dock is "L"
shaped and is 20ft wide (to allow for barge landing) and 150ft in length extending 141ft
from MLW and I48ft from MHW, the "L" then turns east and extends 100ft by 20ft. A
wave attenuating/reef creating system is proposed beneath the dock which will allow for
more protected docking inside the dock when seas from the south are rough. The dock
has 9ft of water depth of the southern end and 7ft to 8ft on the inside of the "L". The
dock has been designed so that barges can approach and land on the end of the dock
while vessels can dock along the "L".
4.00 STATEMENT OF OBJECTIVES SOUGHT BY THE PROPOSED PROJECT
Great St. Jim, LLC is proposing to construct a temporary barge landing and an access
dock on the western side of the island to be used for worker and guest access to the island
3
EFTA00802626
and a combination barge landing/dock on the southeast side of the island on the point
closest to Little St. James. The existing dock in Shallow Bay will be removed as soon as
one of the docks is functional.
5.0 SUMMARY OF PROPOSED ACTIVITY
Great St. Jim, LLC is seeking to construct two docks, one of which is a combination
dock/barge landing, and a temporary barge landing to provide access to Great St. James
Island. A detailed study was done around the entire island to determine suitable locations
for the dock locations and the sites with the least environmental impact were chosen.
A temporary barge landing is being proposed on the northwestern facing beach. This site
is to the west of the salt pond and the associated wetlands. This a shoreline ramp which
is 25 feet (ft) wide and 40ft in length extends to the Mean Water Line. Two bollards will
be placed to either side of the ramp and two moorings will be installed 75ft offshore on
either side of the ramp in just over 7ft of water depth. The mooring will be installed
using helix anchors and will use floating lines will be used to avoid seafloor disturbance
when the moorings are not in use. The landing is free of both coral and seagrass
colonization. The landing is excellent for short term pick up and drop off of material or
equipment. The site is well protected from normal wave action but is periodically
impacted by wave action from ferries which travel through current cut between Great St.
James and St. Thomas. The wakes from these vessels make it an unattractive site for
mooring a barge for any length of time at the site. This landing can be quickly
constructed and utilized while the combination dock and barge landing on the
southeastern side of the island is constructed.
The western dock is proposed on the northern end of Christmas Cove. Historically there
was a dock in this location and there are still old concrete piles lying in the shallows of
this site. The proposed dock will be 10ft in width and 195ft in length extending 187ft
from mean low water (MLW) and I93ft from mean high water (MHW). The dock will
connect to an access slab 12ft long and 2' thick. All the ESA listed coral species within
the area were located and the dock footprint avoids all ESA listed species. The dock
extends beyond the nearshore hardbottom to a depth of 15ft out in the uncolonized sand
to allow for safe dockage for deeper vessels.
The southern dock is located off the point closest to Little St. James. Again, all of the
ESA corals were located and the dock was designed to avoid these corals. The dock is
shaped and is 20ft wide (to allow for barge landing) and 150ft in length extending
141ft from MLW and 148ft from MHW, the "L" then turns east and extends 100ft by
20ft. A wave attenuating/reef creating system is proposed beneath the dock which will
allow for more protected docking inside the dock when seas from the south are rough.
The dock has 9ft of water depth of the southern end and 7ft to 8ft on the inside of the
4
EFTA00802627
"L". The dock has been designed so that barges can approach and land on the end of the
dock while vessels can dock along the "L".
5.0Ia Purpose of Project
The purpose of this application is to provide access to the island of Great St. James.
Great St. Jim, LLC is proposing to construct a temporary barge landing to be used during
the construction of the other docks, an access dock on the western side of the island to be
used for worker and guest access to the island, and a combination barge landing/dock on
the southeast side of the island on the point closest to Little St. James. The existing dock
in Shallow Bay will be removed as soon as one of the docks is functional.
5.01b Presence and Location of any Critical Areas and Possible Trouble Spots
The island of Great St. James is within the Vessup Bay/ East End Red Hook Area of
Particular Concern (APC) (Figure 5.01.1). The Vessup Bay/Red Hook APC is located on
the eastern end of St. Thomas and includes Nazareth, Muller, Vessup, Red Hook, Great
Bay, Cowpet Bay, Cabrita, Beck and Water Point, Great St. James, Little St, J, and Dog
Island.
Figure 5.01.1 Areas of Particular Conem (STEER (2011) St. Thomas East End Reserve
Management Plan. St. Thomas, USVI.
5
EFTA00802628
The island also lies within the St. Thomas East End Reverse (STEER). STEER was
developed to help protect coastal resources including seagrass beds and coral reef
communities. The island of Great St. James is in area C of the reserve and is referred to
as St. James (Figure 5.01.2).
Se Th
The UvIna Omens
Hal (2001)
Sal ter* pftgewm
Salrack assay S ca-w. en.
011•8 *ran an tadredt
Omit nen II snowing
<- Wars
Mal a paalallta
SOWSnotala Spa Sri cove,
*WIN Mais l Ws algal ow& Mean Se/ SM.
* Wean nal
US at Safi Rune
Seal
UMW aatensfas
Sndol est I I enewans Natural Resource Inventory
SI Thomas East End Ramon Cannunic
December 4. 2008
Raw Cadi
"or Mean Wawa Gay
Mentnena Mace. P
Raab
Mane linen*
A len thingame Lagoon
Oa Cr Cay Manarowl Uwe
sow. ewes CIC St into hand cay sn'utAwsl SOY Sal Kest
Tuel Gland laspore CORISS PSI Mil Peal Cli ?--IS "a".Vegenseen Ca
now
a▪ s,. Dm*,
▪ ascsacue best
Coital raw! 1.Astre tent
Asia,
Rock ponevnt
kiervo.••
inane pera
Coss Ns* lams leo
*minimise
Figure 5.01.2 STEER boundaries. (STEER (2011) St. Thomas East End Reserve
Management Plan. St. Thomas, USVI.
6
EFTA00802629
The regulations for the St. James are as follows:
St. lames
Marine
Reserve and
Wildlife
Sanctuary Subchapter
96, Section
96-3 Prohibited Activities within the St. James MRWS:
• It is unlawful to remove any marine or other wildlife without
a permit or specific authorization from the Commissioner
Subchapter Permitted Activities within the St. James MRWS:
96, Section
964 Acts permitted, provided a permit is first obtained from the
Commissioner:
• Scientific collecting in support of and for use in a research
project with an approved protocol
• The use of castnet with a minimum square mesh size of X
inch to capture baldish (fry) within 50 feet of the shoreline,
except for Cow and Calf rocks
• Fishing with hook and line
The marine habitats around Great St. James have abundant coral and seagrass resources.
There are numerous ESA listed corals species near the proposed dock locations.
Acropora palmata, Acropora. cervicornis, Orbicella amzularis, Orbicella franksi and
Orbicella faveolata as well as Dendrogyra cylindrus are found off all the beach from
which the proposed docks and barge landings are planned. At the northern temporary
barge landing site, these corals are located primarily to the west in an area of coral
boulders and coral rubble. However, there are several small A. palmata and several 0.
ammlans located on the shoreline cobble which extends out to a depth of 6.5ft. The
presence of these species as well as several non-ESA listed Porites astreoides has
dictated the location of the ramp. The proposed temporary barge landing position avoids
all coral and seagrass resources.
Location of the western dock has a cobble beach between two areas of emergent bedrock
and boulders. A. palmata occur on the emergent bedrock to the north. Offshore the
seafloor quickly gives way to exposed pavement. There is a long linear depression right
offshore and an old piling lies within this area. The fractured pavement then extends to
approximately 11.5ft of depth over the next 100ft heading offshore. The area has some
widely-scattered boulders and patchy coral colonization. There are scattered ESA corals
including Orbicella and Dendrogyra. During the first survey, there was a very large A.
pabnata colony immediately seaward of where the old piling lay near shore. However,
upon the next visit by the island it was noted that an old boat was tied nearshore
apparently attached to the old piling. During a dive, several weeks later it was noted that
the boat was gone and the large A. cervicornis had been badly broken. The location of all
the ESA species has dictated the location of the dock. Approximately 75 corals will
require relocation to minimize impact but no listed corals will need relocation.
7
EFTA00802630
The southern dock also extends from a cobble beach which gives way to rock pavement
and has emergent bedrock and boulders on either side of the beach. There are Acropora
colonies to the east and farther to the south on the bedrock and boulders. There are
Orbicella and Dendrogyra within the embayment and their locations have dictated the
location of the dock. The dock avoids all ESA listed corals but will require the relocation
of approximately 75 corals.
This southern dock will include a combination wave attenuator and reef building system.
A mitigation plan has been prepared and is found in Appendix B.
Because of the rock occurring in the area, some of the pilings may require socketing and
if this is required special water quality measures will be taken. If at all possible a vibra-
hammer will be used to drive the piles. A water quality monitoring program has been
proposed and the plan is found in Appendix C.
The area is known habitat to protect sea turtles and marine mammals and as such
NOAA's Sea Turtle and Smalltooth Sawfish Construction Conditions will be followed as
well as NOAA's Vessel Strike Avoidance Measures and Reporting for Mariners.
The property contains 6 salt ponds. The wetland around the salt ponds have been
delineated and the delineations were approved by the U.S. ACOE during a previous
application for development of the island. This delineation is more than 5 years old, but
no wetland disturbance will occur as a result of this project.
The island is known to be habitat to the St. Thomas Tree Boa that is a listed rare and
endangered species. The boa as well as another species of snake have been seen during
the field studies. There will be special corridors and preservation areas set aside on the
island for these species. The access ways to the western and southern docks already
exist, but the branch that will need to be developed to the temporary barge landing will be
cleared by hand to limit impacts to the tree boas. A tree boa mitigation plan is found in
Appendix D.
5.0Ic Method of Construction
The temporary barge ramp will be the first feature constructed. The landing slab will be
framed and poured from shore and the bollards will be installed near the shoreline. The
cobble will be excavated with a small machine and silt fencing will be placed seaward off
all excavation prior to any work. Divers utilizing a small boat will install the offshore
moorings.
The western and southern docks will both be constructed from a barge. A vibratory
hammer will be used to drive all the piles if the hardness of the rock allows. If the rock
proves to be too hard, the piles will be socketed, placed, and grouted in. All corals will be
transplanted out of the footprint and area of impact prior to the start of construction and
all turbidity control will be installed prior to any in-water work that day. If socketing is
8
EFTA00802631
required, seafloor length curtains will be used and monitored and not removed until water
quality within the curtains has fallen to acceptable limits. All corals within the curtain
limits will be removed to prevent damage by settling sediments. Once the pilings have
been placed, re-enforcing steel will be placed and concrete poured. Turbidity controls
will be installed and water quality monitoring will occur during all concrete pouring.
Once the piles are completed the pile caps and decking will be placed.
Access slabs will be constructed from shore and silt fencing will be placed seaward of all
excavations.
5.0Id Provisions to Limit Site Disturbance
The dock locations have been located to minimize impact on the marine environment by
avoiding all ESA listed corals and seagrass beds. Corals which cannot be avoided will be
relocated out of the footprint and potential area of impact and turbidity control and water
quality monitoring will be implemented. The branch of the road to the temporary barge
landing will be first cleared by hand to minimize impact to the VI Tree Boa. A Tree Boa
protection plan is found in Appendix D.
5.00e Sedimentation Control Methods to be Implemented.
Silt fencing will be placed seaward of all upland excavation and construction. Turbidity
barriers will be installed around all areas of in-work, including pile driving and concrete
pouring overwater. If pile socketing is required two rows of turbidity barriers will be
installed and these curtains will be seafloor length. These curtains will be maintained
until the interior water quality has fallen to acceptable levels.
5.00f Schedule for Construction Activities and Implementation of Sediment Control
Measures
Silt fencing will be installed prior to any upland excavation and maintained throughout
construction. All construction will be occurring in cobble areas without vegetation, so
fencing will be maintained until such time no exposed soil is within the area.
Silt fencing will be installed during the new access road clearing and maintained until
such time the roadway is stabilized.
Turbidity barriers will be installed before any in-water work and maintained until interior
water quality is within acceptable levels. Double turbidity barriers will be required if pile
socketing is required.
5.00g Maintenance of Sediment and Siltation Control Measures
All silt fencing and turbidity bathers will be inspected and maintained through the
construction period. Silt fencing will be inspected daily even when no construction is in
9
EFTA00802632
progress (over weekends/holidays). Turbidity bathers will be monitored throughout the
day and will be repaired and adjusted as necessary as part of the water quality monitoring
plan. Curtains will be maintained throughout the day and removed or secured as
necessary when no in-water work is ongoing.
5.02 EXHIBITS AND DRAWINGS
Drawing Page
Proposed Temporary Barge Landing 11
Western Access 12
Southern Access Dock/Barge Access 13
10
EFTA00802633
...lot seas
a-
SAL 1 POND LIM! s
09.21 2016
A/MU VA Lfil1
WIC 411. SA
001140 IMO
eAC
ViC41A/541
ar
- - NWT X
MOORING ,117 L•41 e • tor nig
galOal
0011PALNOTM
rer.r.a=r""
uw
SITE OVERVIEW (I' • 80 ft) 0I
;
5
yyy'7
Da1
;
GS.I
EFTA00802634
ZI
EFTA00802635
V
S
ate •
PITS SITES .Ave AZISSellt
MS SWISS 17 MP
PINS111.01 4SIPCIOUTFIC
COCS 0001•001
7
O
SITE PLAN VIEW
00.••••••••
_NISMS
OCISII•a
.........
PILING CONFIGURATION
••••••••Vre.ttete.CIPM1.4
..r.01,1••••••• Farina.
•-•••••••••••
*--...,••••••••Sulaa
WAVE ATTENUATION SETUP
GSJ 3 C. •
EFTA00802636
5.03 Project Work Plan/Schedule
• Temporary Barge Landing
I. Placement of silt fencing
2. Excavation of footings
3. Framing of slab
4. Placement of bollards
5. Pouring of concrete
6. Removal of silt fencing once all areas are stabilized
7. Placement of moorings
• Southern Dock
I. Placement of turbidity bathers
2. Placement of piles - vibra-hammer or socketing
3. Placement of re-enforcing steel and pouring of concrete
4. Placement of pile cabs and deck slabs
5. Turbidity barriers moved/removed as necessary once interior water quality is
acceptable
6. Placement of silt fencing
7. Excavation of footing
8. Framing of slab
9. Pouring of concrete
10. Removal silt fencing once all areas are stabilized
• Western Dock
II. Placement of turbidity barriers
12. Placement of piles/vibra-hammer or socketing
13. Placement of re-enforcing steel and pouring of concrete
14. Placement of pile cabs and deck slabs
15. Turbidity barriers moved/removed as necessary once interior water quality is
acceptable
16. Placement of silt fencing
17. Excavation of footing
18. Framing of slab
19. Pouring of concrete
20. Remove silt fencing once all areas are stabilized
14
EFTA00802637
6.00 ENVIRONMENTAL SETTING AND PROBABLE PROJECT IMPACTS
6.01 Climate and Weather
Prevailing Winds
The Virgin Islands lie in the "Easterlies" or "Trade Winds" which traverse the southern
part of the "Bermuda High" pressure area, thus the predominant winds are usually from
the east-northeast and east (IRF, 1977). These trade winds vary seasonally (Figure
6.01.1) and are broadly divided into 4 seasonal modes: I) December to February; 2)
March to May; 3) June to August; and 4) September to November. Below are the
characteristics of these modes as taken from Marine Environments of the Virgin Islands
Technical Supplement No. I (IRF, 1977).
December - February
During the winter the trade winds reach a maximum and blow
📷 Images in this document (121 detected; 6 largest described)
AI-generated factual descriptions of embedded images (llava:13b). These are searchable across the corpus.
[Image 1] The image shows a document with text, which appears to be a qualification statement or a similar type of formal document. The text is written in English and includes various paragraphs with headings such as "QUALIFICATION STATEMENT" and "QUALIFICATION STATEMENT." The document mentions a company named "Roamplast, Inc." and includes a list of qualifications or certifications that the company holds.
[Image 2] The image shows a document with text, which appears to be a list of points or guidelines. The document is titled "Development of the Migration Plan for VVM Development in St. John's Bay." It mentions various points related to the development of a migration plan, including the involvement of the Department of Public Works and Government, the need for a comprehensive plan, and the importance of comm
[Image 3] The image shows a document with text, which appears to be a page from a report or a manual. The text is too small to read in detail, but it seems to be related to environmental assessment or a similar field. The document includes a table with columns and rows, which might contain data or information relevant to the text. The background of the document is a blurred image of an underwater scene, pos
[Image 4] The image shows a document with text, which appears to be a list of achievements or milestones. The document is structured with bullet points and dates, indicating a timeline of events or accomplishments. The text is too small to read in detail, but it seems to be a formal or professional document, possibly related to a company or organization's history or progress. There are no visible names, log
[Image 5] The image shows a document with a list of tasks or events, which appears to be a job list or a schedule for a project or organization. The document is titled "FY16-17 JOB LIST" and includes a table with columns for dates, descriptions of tasks, and names or initials of individuals assigned to each task. The tasks are related to environmental monitoring and management, and the dates range from 2015
[Image 6] The image shows a document with a list of years and corresponding events or achievements related to water quality monitoring. The document appears to be a company report or a summary of activities, possibly from a company that specializes in water quality management. The years listed are 2000 to 2015, and the events include collaborations with various organizations, participation in conferences, a